Skip to main content
GullySystem

Sub-meter readings and utility charges for lessees

Feeders behind each transformer and the sub-meters on every unit are read on a phone, with the previous figure shown beside the new one. Demand, kVAh units and water draw are then charged to the right lessee. Utilities clerks see which units lack a reading, and finance sees the feeder total against what was billed.

What each meter reading record keeps

Every feeder and every unit has its own meter point. A reading is a dated figure. A named clerk enters it against that point. Across a month, the points add up to a picture of what the park drew and who drew it.

Feeders and unit meter points

Each transformer feeder and each unit sub-meter is a point of its own. A shed split into bays can carry a point for every bay, and each bay can have a different lessee. Each point is tied to a unit.

Previous and new figures

The phone shows the previous figure beside the new one as the clerk types. The difference becomes the units used. A slip, such as a figure lower than the last, stands out before it is saved.

Demand, kVAh and water draw

Power is held as kVAh units and as a demand figure. Water draw is read from its own meter. Where your charge rules use power factor, it sits beside the demand reading. Each kind is charged on its own line.

Opening and closing readings

Possession is noted once keys and meter readings pass to the new allottee, so the opening figure is fixed on the day. At exit, the closing figure is set against the deposit. Both are on the record.

Readings through the billing month

Readings are taken in a short round before the invoice run. The utilities clerk walks from the transformer yard to the shed rows and back to the desk. Four moments follow a figure to a lessee. The same round repeats each month.

Walking the transformer yard

The clerk starts at the feeders. Each feeder reading is typed on the phone against its transformer. The previous figure is shown beside it. These totals are the yardstick for each unit reading that follows.

Unit by unit along the sheds

Along the shed rows, the clerk enters each unit’s power and water readings, with the previous figure beside each. A unit with no entry stays on the missing list. Bays in a building are read in turn.

Chasing what is missing

Before the invoice run, the clerk opens the list of units with no reading, grouped by shed row. A locked gate or a shed under repair explains some of them. Each is chased that morning.

A feeder total that disagrees

The units billed to lessees are added and set against the feeder total. A gap prompts a second look. The clerk re-reads a doubtful meter, or the manager asks service staff to inspect the line.

Who enters, checks and reads the meter data

Meter data touches the field, the finance desk and the owner. Each desk sees its own level. That runs from a single reading to the whole park’s draw on the feeders.

What utilities clerks do

Clerks enter readings and watch the missing list. They never touch rent. Their screen is built for a phone, with the unit, the previous figure and a field for the new one, in that order.

What finance relies on

Finance receives the units, the demand and the water draw on each invoice line, as read in the round. When a lessee queries a total, the readings behind it are open. The query is settled with figures, not argument.

What park managers watch

Managers read the gap between the feeder total and the sum billed to lessees. A gap points to a line fault, a meter that needs attention or a unit read wrongly. A service request follows.

What owners and investors see

Owners see the sub-meter units and demand per lessee against the feeder total. They read it as a check on the park, not on any one lessee. The same numbers sit behind each lessee’s invoice.

Decisions to settle before readings begin

A meter record is awkward to correct later. A few decisions come first. Finance, the utilities lead and the park manager agree them together, with the accountant for charge rules.

Who may correct a reading for sub meter readings and utility charges

Decide who can change a figure once it is saved, and for how long after entry. A clerk might correct a slip the same day, while later changes need the manager. Your office sets the limit.

What the system leaves out for sub meter readings and utility charges

Smart meter feeds are not part of the start and are scoped as a separate job. The supplier’s tariff and the park’s own electricity bill stay with the owner. The record covers readings and charges to lessees.

How current meters come across

Each meter point is listed against its unit, with an opening figure taken at a first walk. Last month’s readings are keyed too. The charge rules are then tested on real numbers before the live run.

The report to open first for sub meter readings and utility charges

Begin with sub-meter units and demand per lessee against the feeder total. It tells the park whether the meters, the units and the charges agree with one another. Every other power question comes back to it.

How readings feed billing and requests

Readings are the input for the power and water lines on every invoice. They also connect to the unit record, the lessee’s lease and the service desk. A saved figure goes further than billing. The links below show where it goes once it is saved.

  • Meter points are listed against each unit in the layout
  • The lessee on the lease receives the charge
  • Invoices pick up power and water lines from readings
  • Exit statements use closing figures against the deposit
  • A tripped feeder becomes a service request at that location

Where meter readings and charges stop

The feature records readings and turns them into charges under the rules your office sets. It does not test whether a meter is accurate, read a meter without a person, or decide the supplier’s tariff. A smart feed is a separate job. A park with a single meter and a few lessees can use a sheet.

FAQ

Frequently asked questions

What happens if a reading is typed wrongly?

The previous figure sits beside the new one, so a slip is seen as it is typed. A saved figure can be corrected by whoever your office allows. The invoice then shows the corrected units.

How are charges worked out when one feeder serves several units?

Each unit is charged from its own sub-meter. The feeder total is kept alongside, so a gap between the sum billed and the feeder stays visible. How any gap is shared is a charge rule agreed with finance.

Where does the clerk see units that still need a reading?

The clerk’s screen lists every unit with no reading yet for the month. It shrinks as figures are entered. Finance sees the same units as invoices on hold, so both desks chase from one list.

Can water be charged as well as power?

Yes, water draw is read from its own meter and charged on its own line. Water has its own line. The rate and any sharing rule are set with finance and tested on last month’s readings before the first live invoice.

How are meters handled when a lessee arrives or leaves?

At handover, the opening readings are noted with the keys. At exit, the closing readings are entered and the final charge is drawn. It is set against the deposit held, on the exit statement. Both figures stay on record.

Where it fits

How this feature fits the system.

Industrial Park Developer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each broker call or lessee visit is logged against the space asked for, and the follow-up date keeps the enquiry from going cold.

Lead Management

Quotations and offer letters

An offer is built from the shed’s area and asking rate with lock-in and deposit stated, and each revision is kept next to the first.

Quote & Proposal Management

Lease register

The lease record holds escalation steps, rent-free period and renewal option, and lists the dates falling due so no expiry sits unseen in a scan.

Contract Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements