Skip to main content
GullySystem

Surface and area quotes for pressure washing

A pressure washing quotation is built from surface type and measured area, priced from the company’s own rates. This feature holds those rates for block paving, decking, render and tarmac, adds sealing or re-sanding extras and keeps every revision. The office writes the quotation. The customer’s answer is recorded against it.

Rates, areas and extras on one quotation

Pricing a driveway means a small sum with several parts. The surface sets the rate, the measured area sets the quantity, and extras sit on top. Each part is kept as its own line. Anyone reading the quotation later can see how the figure was reached.

Surface type and rate

Each line names a surface, such as block paving or tarmac. The rate comes from the company’s own list for that surface. Rates are keyed in before the first wash.

Measured area in square metres

Area is entered as measured or estimated on site, in square metres. A patio and a large car park use the same kind of line. Quantity times rate gives the line total. Estimates are marked as estimates.

Sealing and re-sanding extras

Sealing or re-sanding is added as a separate line. A customer can accept the wash and decline the extra. Both figures show on the quotation. A stain treatment can be added the same way, as its own line.

Revisions and the customer’s answer for Surface and area quotes

The earlier ones stay. The customer’s answer is recorded as accepted, change requested or declined, so the office can always see what was offered first and what was agreed.

Pricing a patio, a frontage and a car park

Quotes are written between jobs, at kitchen tables and in vans. The pressure washing office prices a patio from the rate list, a shopfront from a site visit and a car park from a measured plan. The same screen serves all three.

Measuring a drive on site

An operator calls at a house with a tape and a notepad. Back at the van, the measured area goes into the quotation. The surface is block paving. Rate and total follow from the list, not from memory.

Pricing render from the office

A customer sends a photograph of a rendered wall. Staff pick render, estimate the area and mark it as an estimate. That note matters later. It explains a gap if the measured wall turns out larger.

Dropping the sealing extra

A homeowner likes the price for the deck wash but not the sealer they were offered. Staff revise the quotation without the extra. Revision two goes out. Revision one stays on the record for anyone who asks.

Reading what was declined

The owner looks at the quotes declined lately, split by surface, before the next price review. A run of declined decking quotes points to the decking rate or the extras. Start from the quotations. Skip the guesswork.

Who reads a quotation and what they see

Four hands touch a quotation, and each needs a different slice of it. Staff need the lines and totals. Owners need outcomes by surface. Operators need the area they will clean. Crew leads need the extras that change what goes on the trailer.

For owners reading accepted and declined

Owners see quotes still open, accepted or declined, split by surface. A surface that keeps being declined stands out. The owner then checks the rate. No one has to total a pile of paper first.

For the office building the quotation

Staff pick the surface, enter the area, add extras and send. They can reopen a quotation, change a line and issue a new revision. The old one stays. That keeps any argument about price short.

For operators measuring on site

Operators measure or estimate on the doorstep and tell the office the area and any extras. Their figures become the lines. If the real area differs from the quoted one, they say so on the job card.

For crew leads packing sealer

Crew leads read accepted quotations to see which extras are due. A sealing line means sealer goes on the trailer. A re-sanding line means sand does. The lead packs from the quotation, not from memory.

Settling the rate list before the first quotation

Steady quotations rest on steady rates. Before the first one is written, the company fixes its surfaces, units and extras. These choices are hard to change once customers hold printed figures.

Which surfaces get their own rate

Block paving, decking, render, tarmac and concrete may each carry a rate, or two may share one. Split them where the labour differs. A merged rate hides the gap between lance work and soft wash.

How heavy algae growth is priced

Price follows how green the surface is. Decide whether heavy growth moves the customer to a second rate or adds an extra line. Say which in writing. Staff then quote the same slab the same way.

Whether sealing is quoted with the wash

Some customers want one price. Others want the wash and the sealer apart. Decide whether sealing is always offered as an extra line. A separate line lets a customer decline it without reworking the whole quotation.

How long a quotation stays open

Set a rule for how long a quotation stands before the office asks again. Without one, an old figure gets accepted at last year’s rate. Choose a span. Apply it to every open quote, whatever the surface.

How a quote feeds the jobs that follow

A quotation is the first document in the chain of a paid job. It takes its starting facts from the enquiry and hands its figures to the schedule, the job card and the invoice. The lines carry over. The invoice matches what the customer accepted.

  • Enquiry supplies address, surface and preferred day
  • Accepted quotation is offered to route and job scheduling
  • Surface and extras appear on the job card
  • Finished job lines flow into invoices, receipts and dues
  • Recurring contracts take visit rates from agreed quotes

Boundaries of surface and area pricing

The feature prices from the rates you enter. It does not measure a surface, judge how bad the algae is or set your margin. The operator or the office supplies the area. Tax lines follow the settings agreed at installation. Terms of sale belong to the owner and an adviser. For one driveway at a flat price, a handwritten note is enough.

FAQ

Frequently asked questions

Can a quotation show sealing separately from washing?

Sealing or re-sanding sits on its own line, so a customer can accept the wash alone. Staff revise the quotation without the extra when asked. Revision one is never overwritten. Anyone who asks can see it.

What if the measured area differs from the quote?

The office revises the quotation or notes the gap on the job. The first revision stays for reference. Whether to bill the new area is a decision for the owner and the customer. The record shows both figures.

Can rates differ for homes and car parks?

Rates are entered per surface type and area unit. Commercial work can differ. Key a commercial car park rate and a home tarmac rate as separate entries. Quotations then pick whichever entry the office chooses for the job in hand.

How do we move our price list across?

GullySystem staff key in your surface types and per-area rates exactly as you price a job now, before the first wash. Your own staff retype nothing. Later changes are made by the same staff when you ask.

Is a quotation kept after the job is invoiced?

Yes. Every revision is kept. A question about the original figure is answered from the quotation, not from memory. Nothing is rewritten. Your own rules for how long records are held stay with you and your adviser.

Where it fits

How this feature fits the system.

Pressure Washing Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and online booking

A booking page lists the cleans you offer and the open slots, and each request lands with the office carrying its address and surface.

Online Booking Portal

Surface and area quotes

Quotes pick from rates held per surface type and area unit, with sealing or stain extras added and every revision kept.

Estimate/Quotation Management

Route and job scheduling

Stops are placed on a route and a day, and a rainy morning moves the whole day with one change instead of many calls.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements