Skip to main content
GullySystem

Engineer allocation and bench view for software teams

Team allocation and bench shows who is on which project at what percentage, and who frees up on which date. Clashes appear before an allocation is saved. When a new request arrives, sales and delivery heads read one list of free engineers with their skills and grades.

Sales and delivery reading one bench list

Free engineers used to be known from a delivery head’s memory. Now the list is shared. Sales asks about a start date, delivery decides who goes, and engineers see where they are headed next.

For delivery heads assigning engineers

A delivery head assigns engineers by percentage and dates. Any clash with another project shows before saving. Skills and grades sit on the same screen, so the right person is picked first time, not after a second call.

For sales checking a start date

Before promising a start, a salesperson opens the free-engineer list. It shows skill, grade and free-from date for each person. Dates come from the bench. A prospect hears one that the team can actually meet.

For engineers seeing their own load

An engineer opens a personal view of current allocations and the dates they end. The next project is visible. Leave can be applied for from the same phone or laptop, with the project dates in view.

For the founder reading idle cost

The founder reads which engineers sit on the bench and since when, with utilisation by month beside it, so the cost is read in one place. Idle cost is a figure, not a worry. A long bench prompts a call to sales.

Percentages, dates and skills behind each allocation

An allocation says that one engineer gives a share of working time to one project between two dates. Every other view is built from those rows. They are worth keying in with care. Get them right and the bench, the clashes and the utilisation all follow.

Engineer, project and percentage

Each row links an engineer to a project at a percentage of working time. A person may sit at full time on one project or be split across two. Added together, percentages expose over-booking. It shows at once.

Start and end dates

Every allocation has a start date and an end date, and the end date is what produces the free-from date. Extending a project changes the end date, and the bench list changes with it. Dates drive the bench.

Role, grade and skills

The engineer’s role, grade and skills are held on the profile, so a request for a senior mobile developer can be matched to names. Testers and designers are filtered the same way. Skills are searched, not remembered.

Leave and other time away

Approved leave is held against the same dates, so an engineer shown as free is not away. Engineers apply from a phone or laptop. Leave sits on the same calendar. Allocation and leave are read together by the delivery head.

When a new request lands on a Tuesday

A prospect writes on Tuesday asking for a team to start soon, and wants an answer the same day. Sales must answer without ringing round. Delivery must protect the projects already running. That list is where the two needs meet.

A salesperson reads the free list

The salesperson filters the bench for backend engineers free from the date the prospect wants. Two names appear, with grades. The answer to the prospect is a start date and a team, not a maybe.

A clash tried on the list

The delivery head allocates one of them to the new work. A warning shows that the same person is on another project until a sprint ends. The start date moves instead. The prospect hears the honest date.

A project ends on Friday

On Friday an engagement closes and three engineers have nothing booked from Monday. Their names appear with free-from dates and skills, so sales hears about them that same morning. Memory is not the source. A hallway chat is not either.

A question about leave

Leave is applied for on a phone. Dates are checked against the engineer’s allocation by the delivery head, who then answers. If the project is close to a release, that fact is in view when the answer is given.

Allocation rules to settle before set-up

Allocation is where sales, delivery and engineers pull in different directions. A few rules agreed early stop the list from becoming a battleground. Keep them short. Settle them with the delivery heads and the founder.

Warn or block on over-booking

A clash can stop the save or only show a warning. Blocking is strict. A warning leaves room for a short overlap at a handover. Pick one, and say who may override it when it matters.

How part-time bench is counted

Half free is still half free. Decide whether such engineers count as bench, or whether only those with no allocation do. Sales reads a very different list under each rule, so choose with sales present.

Who may reassign a running engineer

Pulling an engineer off a live project has a cost. Decide who may do it, and whether the lead of the losing project must agree first, in writing or on a call. Otherwise sales collects promises that delivery cannot keep.

Skill tags the bench list uses

A free-engineer list is only as good as its skill labels. Choose a short set, such as mobile, backend, test and design, and decide who keeps it up to date as people learn new stacks. Free text breeds duplicates.

Limits of an allocation list for engineers

The list shows who is booked. It also shows who is free. It does not judge whether a person suits a client, whether a team is the right size or whether a hire is needed. Those calls stay with the delivery head and the founder. Salary, hiring and notice terms stay with the founder and an adviser. A team of five on one product can plan on a whiteboard.

How allocation feeds the other screens

Allocations are read by almost every other part of the product. The accepted estimate asks for roles, the plan supplies dates, timesheets check logged hours against the allocation, and the margin report prices idle time. A change here shows up there. Nothing is copied by hand.

  • Roles requested arrive from Proposals and estimates
  • Sprint dates come from Project plan and milestones
  • Logged hours checked against allocation in Timesheets against the plan
  • Idle cost of bench time enters Project margin and cost report
  • Joining engineer’s allocation starts with Joining and exit access checklist
FAQ

Frequently asked questions

Can sales see the bench without seeing salaries?

Sales sees names, skills, grades and free-from dates only. Internal cost sits on the rate card and can be kept off that view through the access you set with the founder.

What happens when a project is extended?

The delivery head moves the end date of the allocation. The engineer’s free-from date moves with it. The change shows at once. If another request was counting on that date, the clash shows before saving.

Can one engineer be on three projects?

This works as long as the percentages make sense. Each allocation has its own project. Its share and dates are its own too. The list adds them up and warns when the total passes full time, so the delivery head can adjust it.

Does the bench include people on leave?

Approved leave is held against the same dates as allocations. Away means not free. Someone away next week does not show as free for that week, so the answer given to a prospect stays honest.

Who updates allocations when plans change?

Allocations belong to the delivery head. Engineers see their own rows, and sales reads the list but does not edit it. You can name a second person to cover absence. Set-up records who may change what.

Where it fits

How this feature fits the system.

Software Development Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Client and statement of work register

Each signed statement of work is stored with its billing model, rate card and renewal date, so contract terms can be searched across clients.

Contract Management

Proposals and estimates

An estimate is priced by role and week from the rate card, every revision is kept, and the accepted version opens the project.

Quote & Proposal Management

Project plan and milestones

Sprints and acceptance dates sit on one calendar per project, and each milestone shows the amount that falls due when the client signs it off.

Project Timelines with Gantt Charts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements