Skip to main content
GullySystem

Machine Hours and Servicing for Tree Equipment

A tree company runs on saws, chippers, ropes, trucks and cranes that wear with use. This feature records hours and fuel by machine and by job, and raises service and inspection reminders by hours or by date. The manager sees which job used each machine.

Machine records read by yard and office

Crews use a chipper in the field, the equipment manager services it and the owner pays for it. All three read the same machine record. Each looks at it for a different purpose, and none needs to ring another.

For equipment managers keeping machines fit

The equipment manager opens a machine and sees its hours, its fuel and the next service. Machines due for attention come first. Which job used a machine is shown on every entry, with the date.

For crew leaders logging use

At the end of the job the leader enters the hours each machine ran and the fuel put in. It is done on a phone at the site. A missing entry is easy to see later.

For owners reading machine use

The owner sees which machines are worked hard and which sit idle. That informs a decision to buy, hire or sell. Fuel cost per job is visible too. The owner does not need the yard notebook.

For the office planning around services

Before booking a crane truck, the office checks the hours remaining before its next service. Near its limit, a machine is kept off a long job. Planning stays honest. Booking follows what is actually available.

Hours, fuel and inspections kept per machine

Each machine has its own page, and each page grows with every job. Hours add up, fuel adds up, and the service plan counts down. A saw, a chipper and a climbing rope differ. Each keeps its own rules. The page is the machine’s whole history.

The machine list itself

Every saw, chipper, truck, crane and set of lifting gear is entered once, with a name and a type. The list is the base for everything else. A machine that is not listed cannot be booked.

Hours and fuel per job

Entries link a machine to a job and give the hours worked and the fuel used. Added together, they show the true machine cost of a removal. Fuel has a line of its own. Both feed the cost of the job.

Service plans by hours or dates

Each machine can be set to fall due for service after a number of hours, on a calendar date, or both. The plan is written when the machine is entered. Reminders follow the plan. A truck can have both.

Inspection dates for ropes and gear

Ropes and lifting gear carry inspection dates rather than hours. Each entry records the last check and the next one due. The gap since the last check is plain. Dates can be set for each item separately.

Chipper, crane truck and climbing rope

The yard works through a long list of small tasks: top up the fuel, log the hours, book the service, retire a worn rope. Here is how four such tasks look when the record is kept per machine and per job. Small tasks add up.

The chipper after a shift

A crew finishes clearing a garden. The leader opens the job and enters the hours the chipper ran. Later the equipment manager sees the chipper’s total move closer to its next service. Hours go on the job, too.

Diesel for the crane truck

The crane truck takes diesel on the way to a removal. Fuel goes against the machine and the job. Later the owner sees what that truck cost to run on the job. Month-end totals come from the entries.

A reminder before the saw service

A chainsaw nears the hours set for its service. A reminder comes up for the equipment manager before the limit is reached. The saw goes to the workshop on a quiet day. No job is booked against it.

A rope due for inspection

An inspection date approaches for a climbing rope. The record shows the date and the last check. The manager checks the rope, enters the result and sets the next date. The result is typed in by the person who checked it.

Equipment choices before the first hour is logged

Hour records are only as good as the first list of machines. Early choices keep the record clean. Each needs a named owner. A short meeting settles all of them.

Which machines carry their own record

Clearly a chipper needs a record. A spare hand saw may not. Decide which items are tracked one by one and which are grouped. Tiny entries in bulk make the list hard to keep up.

Service by hours or dates

Engines wear by use, so hours suit them. Ropes and lifting gear age by the calendar, so dates suit them. Choose the basis for each type and let the plan carry it. A chipper may need both.

Who may log machine hours

Crew leaders enter hours at the end of a job. Decide whether the equipment manager may correct them afterwards, and whether corrections are marked. Honest hours need a clear route for mistakes. Corrections should leave a mark.

Service history from the old books

Every machine arrives with a past. Decide whether earlier service dates and hours are keyed in, or whether the record starts from today with a fresh inspection. Keyed history is more work but gives a fuller picture. Either route works.

What machine records cannot do in the yard

The feature holds the hours and dates people enter. It does not read an engine meter by itself, and it does not diagnose a fault or approve a machine for use. Safety inspection rules for climbing and lifting gear come from the owner, the maker and an adviser. A mechanic’s judgement stays with the mechanic. A firm with a couple of saws and one chipper may manage with a notebook.

Hours that travel from machine to job cost

Equipment records do not stand alone. The hours entered here reach the cost of each job. The booking of each machine depends on its service dates. A figure typed once serves the crew leader, the equipment manager and the owner. Five links carry the traffic.

  • Hours per job flow into job costing
  • Fuel entries join machine cost on each job
  • Booked machines on the schedule show service dates
  • Crew leaders record machine use inside the job record
  • Subcontracted crane hire is costed apart from owned machines
FAQ

Frequently asked questions

Does the system read hours from the machine?

Hours are typed in by a person, normally the crew leader, at the end of a job. The software adds them up and works out when service is due. It has no link to an engine meter, so nothing is read from the machine. Entries are manual.

Can a reminder follow hours rather than dates?

A service plan can be set by hours, by date or by both. A chipper might fall due after a set number of hours while a rope falls due on a calendar date. Every machine follows its own plan.

How are ropes and lifting gear tracked?

Each item is entered with its type and its inspection dates. The record shows the last check and the next one due. The result of each inspection is typed in by the person who made it. Dates drive the reminder.

Can fuel be split across several jobs?

Fuel and hours are entered per machine and per job. If a truck serves two sites on the same day, the leader enters its use against each job. The cost then lands where it belongs. Nothing is lumped together.

Who sees a service reminder when it is due?

Who sees reminders is agreed when the machine list is built. Reading falls naturally to the equipment manager, and the office may also see them when booking. Nothing is sent without that arrangement. That choice is made once.

Where it fits

How this feature fits the system.

Tree Service Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and surveys

Each enquiry is logged with its source and address, the survey is booked, and tree records and photographs stay on the client record.

Lead Management

Quotations by tree and task

Every tree and task is priced from the firm’s labour, equipment and disposal rates, with each revision kept beside the open quotes.

Estimate/Quotation Management

Jobs and crew scheduling

Climbers, groundstaff, vehicles and cranes are placed against the day’s jobs, so a clash shows before a date is promised to a client.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements