Skip to main content
GullySystem
Manufacturing

Business solutions for Adhesive manufacturers

Explore software for work such as “A mason and tiler register with training sessions”. Review each business function below, including when it fits and what to check before implementation.

Adhesive manufacturers

How the business operates.

Adhesives are judged by whether they hold. A carton maker wants a glue that sets at line speed, a footwear factory wants a bond that survives flexing, and a woodworker wants an open time that fits the press. Each need leads to a different formulation. None is interchangeable.

Formulations and recipes

Hold each grade’s recipe with revision history, scaled to the kettle size, and its allowed raw material substitutions.

Raw material lots

Record resin, polymer, solvent and additive lots with their incoming viscosity and solids, and link them to each batch.

Kettle batch records

Capture charge order, temperature, mixing time and operator for every batch against the recipe.

Viscosity, solids and bond tests

Save viscosity, solids, pH, pot life, open time and peel or shear results per batch with limits for each grade.

Filling and lot coding

Record fill weights and container counts for pails, drums, tubes and cartridges, and print a batch code and use-by date.

Shelf life and expiry watch

List batches by remaining shelf life and flag slow-moving grades before they expire.

Data sheets and customer approvals

Attach the current technical data sheet and the customer’s approved grade to each order.

Kettle cleaning and changeover log

Operators record the cleaning method, solvent used and sign-off between two grades in the same kettle. Laboratory staff note any carry-over risk. The next batch is released after the entry is complete.

Customer complaint and bond failure

Sales staff log a complaint with the lot code, the substrate and the failure seen, such as peel or creep. The laboratory tests a retained sample. Findings go back to the customer.

Retained sample store

A labelled sample of every batch goes on the laboratory shelf with its lot code and shelf date. Staff pull it when a customer questions a bond. Expired samples are cleared on a dated list.

The records that hold the operation together.

  • Grades and formulations. Hold recipe revisions for every grade, with allowed substitutions of tackifier or plasticiser and quantities scaled to the kettle size.
  • Raw material lots. Record resin, polymer, solvent and additive lots with incoming viscosity and solids. Each lot links to every batch that drew from it.
  • Kettle batch records. Capture charging order, jacket temperature, dispersion blade speed, mixing time and the operator for each kettle batch.
  • Viscosity and solids. Save Brookfield viscosity, solids content and pH against the batch. Readings are compared with each grade’s limits before release.
  • Bond strength tests. Record T-peel, lap shear, open time and pot life with the substrate, press load and curing conditions used on the test strip.
  • Filling lines and changeovers. Log fill weights, container counts, purge steps, nozzle swaps and first-off checks on pail, drum, tube and cartridge lines.
  • Lot codes and shelf life. Print batch codes and use-by dates on every container. List batches by remaining life so slow hot melt slugs surface early.
  • Customer approvals. Hold the grade each customer approved, their peel and viscosity limits and the data sheet revision they were sent.

Operational bottlenecks to check

Viscosity drifts between batches

The same recipe gives a thicker batch when a resin lot changes. Readings sit in a notebook. The pattern is never seen.

Bond tests are not tied to the batch

A peel strength result is written on a test strip. Weeks on, nobody can say which pail in the customer’s store it describes.

Pot life and open time are guesses

The customer’s line needs a set open time. The plant relies on memory.

Shelf life runs out in the warehouse

Slow-moving grades sit in pails past their use-by date. Without an expiry list, they are found by chance.

Filling lines change over without a record

A cartridge line moves from one grade to another. Cleaning and first-off checks are done but not written down.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Order and plan

    A customer order, or a forecast for a repeat grade such as a case-sealing hot melt, opens a kettle batch. It carries the recipe revision and the quantity to make.

  2. 2. Weighing and charging

    Resins, tackifiers, plasticisers, solvents or water, fillers and additives are weighed in charging order, and each raw lot number is recorded as it goes into the jacketed kettle. Scale readings stay on file.

  3. 3. Mixing

    The operator notes jacket temperature, dispersion blade speed and mixing time, then a sample goes to the laboratory. The kettle waits.

  4. 4. Laboratory release

    Viscosity, solids, pH, ring and ball softening point and peel or lap shear results are saved. The batch is released, reworked or held.

  5. 5. Filling

    Pails, drums, IBC totes, tubes or cartridges are filled and checked on the scale, and a batch code and use-by date are printed on each. Short fills are caught at the scale.

  6. 6. Dispatch

    Orders are picked by remaining shelf life and ship with the technical data sheet revision and safety data sheet the customer approved. Paperwork matches.

Roles and responsibility boundaries.

For the technical manager

Maintain recipes and test limits. Compare kettle batches of one grade across polymer lots to see where the viscosity drift began.

For kettle operators

Open the recipe, weigh each charge, record raw lots and request a laboratory sample. Nothing else is asked.

For laboratory staff

Key in Brookfield, solids and peel results, then pass, rework or hold the batch. Grade limits show beside each reading.

For filling and packing staff

Fill containers, record scale weights and print codes with use-by dates. Log each purge and first-off check at a cartridge changeover.

For sales and stores

Confirm customer approvals, pick the earliest expiry first and attach the current data sheet to the delivery email.

Reports your managers need.

  • Brookfield viscosity and solids by kettle batch and grade
  • Peel and lap shear results against customer limits
  • Resin and polymer lots used in a chosen batch
  • Pails, drums and cartridges filled by batch code
  • Grades by remaining shelf life
  • Changeovers and purge steps logged on filling lines
  • Orders open by customer and grade

Connections to scope

  • Email
  • WhatsApp
  • SMS
  • Label printer
  • Laboratory instrument import
  • Accounting export

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Grades and recipes

Each adhesive grade, pail, drum and cartridge size and recipe is loaded the way your technical team writes it.

Test lists and limits

The Brookfield, solids, softening point and peel tests you run are set with limits for each grade.

Filling line settings

Line types, fill weights, purge steps and first-off checks are configured per filling line.

Label and code formats

Batch codes and use-by dates follow the label layout your converters and distributors expect.

Records migrated

Your customer list, grades, open orders and stock counts are copied in before the first kettle batch is booked.

Documents and messages

Delivery notes and data sheets go by email, and short updates by WhatsApp or other messaging.

Limitations to settle before implementation

  • A company that only buys glue to run its own gluing machines is better served by Manufacturing Production Management Software.
  • A maker of paints and coatings may prefer Specialty Chemical Manufacturer Management Software.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • A mason and tiler register with training sessions
  • A tile dealer and hardware list by town with the brand each carries
  • A usage guide by surface: vitrified, stone, wall tile, plywood
  • A coverage comparison that shows cost per square foot
  • A bag and batch check so duplicates can be spotted
  • A project pack for builders and consultants
  • A dealer scheme for towns where tile shops lead recommendations
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements