Skip to main content
GullySystem
Manufacturing

Business solutions for Material handling equipment manufacturers

Explore software for work such as “Plant engineers and maintenance heads in nearby industrial areas”. Review each business function below, including when it fits and what to check before implementation.

Material handling equipment manufacturers

How the business operates.

A lifting machine has one job. It must carry a stated weight without failing, and everything in the workshop, from the profile-cut plate to the latched hook, exists to support that promise.

Capacity-based quotations

Quote by rated load, lift height, fork length and guarding option from your own model list, then keep every revision for the buyer. The final figure is never lost.

Structural steel and component records

Receive plate, tube, load chain, wire rope and hook blocks with certificate numbers, then link each to the unit it was fitted to. A buyer can ask which heat of steel carries the load.

Assembly stages

Follow each unit through profile cutting, welding, mast assembly, cylinder fitting and paint, with a lead hand signing every stage. A skipped stage shows.

Load test and proof records

Record test mass, hold period, deflection reading, result and tester against the serial, in whatever form your own safety staff define for a hoist, a stacker or a lift table.

Nameplate and dispatch

Print plate details from the unit record and attach the operator manual to the delivery papers. The stamped plate and the paperwork then agree, because both came from one entry.

Installation and inspection contracts

Schedule commissioning, hold yearly examination contracts, and hand the service desk a list of the units falling due. Overdue hoists stop being a surprise.

Special model drawings and approvals

Holds the general arrangement drawing, lift height and duty class agreed for each special model. The sales engineer attaches the customer’s signed approval. The workshop builds only from the approved revision.

Spare parts by model

Lists wheels, chains, hooks and seals by model and serial range, with a price. Counter staff pick the right part for a stacker bought years ago. Fast-moving spares are flagged for reorder.

Operator training records

Records who from the customer’s site was trained on a stacker or hoist, on which date and by which trainer. The service lead uses it when a warranty question follows misuse. Dates are held.

Warranty claims and failed parts

Logs each claim with the serial, the part returned and the finding. The quality lead pushes back on a bad batch of chain or castors. Supplier names are held.

The records that hold the operation together.

  • Enquiries and duty capture. Log each enquiry with capacity, lift height, floor type, aisle width and shift pattern, and keep the bay photographs and layout sketches the buyer sent.
  • Quotations by rated load. Price standard models and specials from your own tables for mast height, fork length, battery pack and guarding, and keep every revision on file. Buyers can compare rounds.
  • Drawings for specials. Hold the drawing and parts list of a non-standard unit under a revision letter, so the workshop builds the version that was quoted. Nothing drifts at the bench.
  • Steel plate and tube store. Receive plate, box tube and channel with mill certificate numbers, then issue them against the unit being cut, and return remnants to the rack with their length.
  • Chain, rope and hook records. Receive load chain, wire rope, hooks, shackles and sheaves with proof certificates, and link each to the serial that carries them. A recalled lot is traced to every unit it went into.
  • Assembly stages. Move each unit through cutting, welding, mast build, drive fitting and painting, with a lead signing every stage before the next one opens on the workshop board.
  • Load test records. Store test weight, hold time, tester and result against the serial, in the sheet layout your own safety staff set, and print it for the buyer’s inspector.
  • Nameplate and dispatch. Print serial, capacity and year from the unit record, and issue a delivery note and operator manual that match the plate. Nobody retypes a figure.

Operational bottlenecks to check

Capacity is quoted but never confirmed at build

The quotation says one tonne on a two-stage mast, but the unit leaving the bay carries a lighter fork arm because stock ran out. The buyer is never told.

Proof tests live in notebooks

Test mass, hold period and result sit on a sheet kept by the tester; a buyer’s auditor asks for it a year later and nobody finds it. The test is gone.

Mill and chain certificates are filed by purchase order

Plate, box section and chain arrive with material certificates and proof records; they are never linked to the serial, so the trail breaks at the stores door.

Nameplate data is typed twice

Serial, capacity and year are punched on the plate and typed again on the delivery note by a different person on a different day. The two disagree.

Yearly examinations are chased by memory

Buyers with hoists in several sheds need a yearly thorough examination; the service desk learns which ones lapsed only when a customer complains, which is late.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and duty

    The enquiry records capacity, lift height, floor type, aisle width and shift pattern, and a sales engineer is named against it. Nothing is left to the first phone call.

  2. 2. Quotation

    A model is picked from the list, or a special is sketched, and options such as chain guards, battery pack and delivery are priced. Every revision stays on file for the next round.

  3. 3. Order and release

    A confirmed order opens a unit record, and the drawing, parts list and component picks, such as load chain, hook block and lift cylinder, go to the workshop together.

  4. 4. Fabrication and assembly

    Plate and box tube are cut and welded, the drive and chain are fitted, and a lead signs off each stage. Painting comes last, after the weld inspection.

  5. 5. Test and nameplate

    The unit is loaded to its stated proof weight and held, the result and tester are saved, and the nameplate is printed from that same record.

  6. 6. Dispatch, installation and service

    Delivery, commissioning and the first inspection date are written against the serial, and yearly visits are then scheduled from the customer register.

Roles and responsibility boundaries.

For sales engineers

Pick the model for a stated duty, price chain guards and battery options, and follow each quotation through to an order.

For the drawing office

Release special masts and fork carriages under revision letters, and see which orders still wait for a drawing before the workshop is told to start cutting.

For workshop and assembly leads

See each unit at its stage, the plate and chain issued to it, and the proof loads still to be done, before the paint shop books the slot.

For test and safety engineers

Record proof loads, tester names, hold times and results. Print the sheet a buyer’s inspector asks to see.

For service coordinators

Open the customer register to see inspections due, and send an engineer to the right unit with its chain lot and last test weight in hand.

Reports your managers need.

  • Units in build, split by stage and model
  • Steel, chain and hook issues by serial
  • Load tests done, passed and awaiting
  • Quotations won, lost and still open, by duty class
  • Sold units with inspections due or overdue
  • Spares quotes by model, with unit age
  • Deliveries and installations scheduled

Connections to scope

  • Email
  • WhatsApp
  • SMS
  • Accounting export
  • Payment gateway

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Model list and prices

Standard models, special options and labour rates are loaded the way your estimator quotes today, so the first quotation looks familiar.

Test and nameplate formats

Load test sheets and nameplate fields are set up with your safety staff, in the layouts your buyers and their inspectors expect to see.

Component and certificate fields

Chain, rope and hook items carry the certificate numbers you record at receipt, and the fields follow what your goods inward clerk actually reads off the tag.

Records migrated

Units already sold, their owners and open orders are brought in from the spreadsheets you keep now, then checked by your service desk.

Messages and documents

Email carries quotations, test records and inspection reminders, while WhatsApp or another messenger carries brief updates from the bench to the sales desk and the customer.

Hosted by GullySystem

Sales, workshop and service staff open one unit record on a server that GullySystem looks after, including backups, software updates and recovery after a fault.

Limitations to settle before implementation

  • A reseller of finished trucks who builds nothing should look at Forklift Dealer Management Software instead.
  • A heavy fabrication shop with no lifting products can use Manufacturing Production Management Software, which covers cutting, welding and painting jobs without hoist paperwork.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Plant engineers and maintenance heads in nearby industrial areas
  • Warehouse developers and third-party logistics firms
  • Project consultants and layout designers
  • Annual maintenance contracts and inspection work
  • Open quotations tied to a named decision-maker
  • Repeat orders from existing factories
  • Export enquiries for standard equipment
  • A reference list of sites and loads handled
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements