Batch and Serial Tracking for PCB assembly companies
Trace goods using batch identifiers or individual serial numbers.
Does this function belong in your operation?
Use when physical goods require lot history, expiry control or individual identification.
Traceable goods are received, produced or moved.
Each reel has its own lot and date code, and every board serial links back to the reels used on the line. A faulty capacitor lot found later points to every board carrying it. Affected shipments are listed.
Bring the records the workflow depends on.
- Item tracking rules
- Batch or serial identifiers
- Movement and expiry records
Outputs to check
- Lot or unit movement history
- Trace-forward and trace-back report
- Held or expiring stock list
Follow the batch and serial tracking workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
Traceability requires identifiers on the physical goods and their recorded movements. It can run from controlled imports, but goods receipt, production, stock and sales must preserve the same references. A trace report cannot recover identifiers that were never captured at a handoff.
Systems and records it connects with
- Goods receipt: Counted, accepted and rejected supplier-delivery quantities.
- Stock: Item-location quantities and authorised stock movements.
- Quality control: Inspection results and authorised hold or release decisions.
- Invoice management: Issued invoice references, line amounts and outstanding balances.
Configure, test and introduce the workflow.
- You tell us which items carry shelf life or serials. We write back how each will be numbered.
- The storekeeper shows how goods arrive. You get a goods receipt screen to try, with a field for the supplier’s lot. Send current stock. A trial import comes back with gaps listed for the team to fill, using whatever batch details exist.
- Counter and service staff practise. They issue by batch and look up a serial, and you get a trained group and a corrected import.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Tracked items cannot move without required identifiers.
- Serial references do not duplicate active units.
- A lot can be traced to its recorded recipients.
How the business operates.
An assembly job is won or lost on small things. A reel with the wrong resistor value. Solder paste past its jar life. A moisture-sensitive BGA left out of the bake cycle. Each one is cheap to prevent and costly once boards are reflowed, tested and packed for a customer who expects them on Friday.
The records that hold the operation together.
- Enquiries and quotations. Price an assembly from bill of materials cost, stencil, feeder setup, line time, test and assumed first-pass yield, and keep every revision of the quote for the next repeat order.
- Board BOMs and alternate parts. Hold reference designators, quantity per board, approved alternates and revision letter, and flag a substitution that the customer has not approved before the kit is pulled.
- Component purchase and receipt. Raise orders for shortages, record reels received with supplier lot, date code and moisture class, and send sensitive parts to the bake oven before they reach a shelf.
- Reel and lot traceability. Link each reel to the assembly lot that consumed it, so a field return leads to the exact supplier lots and date codes on that board.
Operational bottlenecks to check
Reels are not tied to the boards
A reel of 10 kilo-ohm resistors is loaded on feeder 14 with no lot number noted. When a board comes back dead from a customer, the paper trail stops at the feeder bank.
Paste and stencils are managed by feel
Solder paste has a shelf life and an open-jar life, and every stencil has a print count, yet neither is logged against the lot that used it. Squeegee wear goes unseen.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Enquiry and quotation
The customer’s bill of materials is loaded and priced with component cost, stencil, line time and test. Alternates are flagged for the customer’s approval before the quote goes out.
2. Purchase and receipt
Missing parts are ordered. Reels are received with supplier lot, date code and moisture sensitivity level, and sensitive devices go to the bake queue before they reach a shelf or a feeder.
3. Kitting
A job kit is counted against the bill of materials, line by line, and shortages are listed by reference designator. The job is released only when the kit is complete or the customer approves it short.
4. Print, place and reflow
The stencil, paste jar, feeder setup, placement program and reflow profile are recorded for the lot. Boards pass solder paste inspection before placement. Automated optical inspection checks them again after the oven.
5. Through-hole, test and rework
Hand-inserted and wave-soldered parts are logged against the lot. In-circuit and functional tests record results by board serial, and failures go to the rework bench with a record of the fault.
6. Pack and deliver
Shipping paperwork states boards built, scrapped and shipped, and names the reel lots consumed. The certificate of conformance is printed from the same lot. Nothing is retyped.
Industry reports to connect with
- Kits short, by job and part
- First-pass yield by board type and line
- Reels consumed by assembly lot
- Paste jars and stencils nearing limits
Questions before implementation.
When should pcb assembly companies consider batch and serial tracking?
Use when physical goods require lot history, expiry control or individual identification. Traceable goods are received, produced or moved.
What should we bring to the requirements discussion?
Bring anonymised examples of Item tracking rules; Batch or serial identifiers; Movement and expiry records. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Trace goods using batch identifiers or individual serial numbers. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
Traceability does not replace product testing, recall decisions or regulatory obligations.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Tracked items cannot move without required identifiers. Use this check when reviewing the first working version.
Related functions for pcb assembly companies.
Discuss batch and serial tracking for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements