Skip to main content
GullySystem
Manufacturing

Business solutions for PCB assembly companies

Explore software for work such as “Prototype and pilot lots for hardware startups”. Review each business function below, including when it fits and what to check before implementation.

PCB assembly companies

How the business operates.

An assembly job is won or lost on small things. A reel with the wrong resistor value. Solder paste past its jar life. A moisture-sensitive BGA left out of the bake cycle. Each one is cheap to prevent and costly once boards are reflowed, tested and packed for a customer who expects them on Friday.

Bill of materials with approved alternates

Hold the customer’s list with reference designators, approved alternate parts and quantity per board, and flag substitutions that were not approved.

Reel and component lot register

Record the supplier, lot and date code of each reel received, and link the reel to the assembly lot that used it.

Kitting and shortage list

Compare the kit against the bill of materials, show the missing reference designators and stop the job from being released short to the line, with the shortage list sent to buying.

Paste, stencil and moisture-sensitive logs

Record paste jar open time, stencil print counts and the floor life of moisture-sensitive parts against each lot, so an expired jar or a damp BGA is stopped at the kit.

Line setup and feeder records

Save the feeder positions, reflow profile and program used for each board, so a repeat lot starts from the saved setup.

Inspection and test results

Log AOI findings, in-circuit and functional test outcomes by board serial, with the defect code, the part replaced and the rework station that did the repair.

Lot report and delivery

Print the lot report and packing slip showing boards built, scrapped and shipped, with the reel lots and test results that stand behind them.

Rework and repair log

Boards failing inspection go to the rework bench with a note of the fault. The log records the reference designator, the repair and the operator. Reinspection follows before the board rejoins the lot.

Firmware version record

Boards with a microcontroller ship with firmware loaded at the bench. The record holds the file name, the version and the checksum for each lot. Test staff compare them before packing.

Component lead time list

Buyers want to know when a part can arrive. The list holds each supplier’s quoted lead time, minimum order and last price. Purchasing checks it when quoting a new build.

The records that hold the operation together.

  • Enquiries and quotations. Price an assembly from bill of materials cost, stencil, feeder setup, line time, test and assumed first-pass yield, and keep every revision of the quote for the next repeat order.
  • Board BOMs and alternate parts. Hold reference designators, quantity per board, approved alternates and revision letter, and flag a substitution that the customer has not approved before the kit is pulled.
  • Component purchase and receipt. Raise orders for shortages, record reels received with supplier lot, date code and moisture class, and send sensitive parts to the bake oven before they reach a shelf.
  • Reel and lot traceability. Link each reel to the assembly lot that consumed it, so a field return leads to the exact supplier lots and date codes on that board.
  • Kitting and shortages. Count a kit against the bill of materials, show which reference designators are short, and hold the job until parts arrive or the customer signs off a short kit.
  • Paste, stencil and bake logs. Record paste jar open life, stencil print count and the out-of-bag hours of moisture-sensitive devices against each lot, with a warning as a limit nears.
  • Line setup library. Store feeder positions, placement program and reflow profile for each board, so a repeat lot loads the setup already approved instead of a fresh trial-and-error one.
  • Inspection, test and rework. Every AOI, X-ray and in-circuit result is filed under the board serial, next to the defect, the part swapped and the technician who reworked it.

Operational bottlenecks to check

Reels are not tied to the boards

A reel of 10 kilo-ohm resistors is loaded on feeder 14 with no lot number noted. When a board comes back dead from a customer, the paper trail stops at the feeder bank.

Paste and stencils are managed by feel

Solder paste has a shelf life and an open-jar life, and every stencil has a print count, yet neither is logged against the lot that used it. Squeegee wear goes unseen.

Moisture-sensitive parts miss their bake

A part sat on the shelf past its floor life, the kitting clerk could not read the humidity indicator card, and the oven run went ahead. Popcorning shows up later.

Shortages are found at the machine

Kitting counts parts by eye, so the job stops mid-run when a reel empties on the feeder while the missing item is still on order with the distributor.

Rework is invisible

Boards touched up with a soldering iron after inspection are not marked in the record, so a repaired board and a first-pass board look identical to the customer. Yield figures lie.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and quotation

    The customer’s bill of materials is loaded and priced with component cost, stencil, line time and test. Alternates are flagged for the customer’s approval before the quote goes out.

  2. 2. Purchase and receipt

    Missing parts are ordered. Reels are received with supplier lot, date code and moisture sensitivity level, and sensitive devices go to the bake queue before they reach a shelf or a feeder.

  3. 3. Kitting

    A job kit is counted against the bill of materials, line by line, and shortages are listed by reference designator. The job is released only when the kit is complete or the customer approves it short.

  4. 4. Print, place and reflow

    The stencil, paste jar, feeder setup, placement program and reflow profile are recorded for the lot. Boards pass solder paste inspection before placement. Automated optical inspection checks them again after the oven.

  5. 5. Through-hole, test and rework

    Hand-inserted and wave-soldered parts are logged against the lot. In-circuit and functional tests record results by board serial, and failures go to the rework bench with a record of the fault.

  6. 6. Pack and deliver

    Shipping paperwork states boards built, scrapped and shipped, and names the reel lots consumed. The certificate of conformance is printed from the same lot. Nothing is retyped.

Roles and responsibility boundaries.

For estimators

Load a customer’s list, check alternates against the approved vendor list, and quote from the first-pass yield of earlier lots of the same board.

For stores and kitting

Book in incoming reels, work through the bake queue, pick kits to the bill of materials and raise any missing part before the job goes to the line. Counting happens once.

For line leaders

Open the approved setup for a board, log the paste jar and stencil, and see the job queue for each line and shift.

For inspection and test

Record AOI and test findings, route failed boards to rework and sign the lot for packing once the defect list is clear.

For the owner

Watch jobs held for parts, yield by board type and margin on repeat builds, without asking a supervisor for a sheet.

Reports your managers need.

  • Kits short, by job and part
  • First-pass yield by board type and line
  • Reels consumed by assembly lot
  • Paste jars and stencils nearing limits
  • Moisture-sensitive parts by remaining floor life
  • Rework by defect type and operator
  • Consigned stock held, by customer

Connections to scope

  • Email
  • Component distributor quotation files
  • Test equipment result files
  • Accounting export
  • WhatsApp

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Bill of materials import

The layouts your customers send are mapped one by one, so a list with merged designators loads without being retyped.

Line and process fields

Your lines, reflow ovens, stencil types and paste brands are set as lists, and logs ask only for what you record.

Moisture classes and bake rules

Exposure hours out of the dry bag and oven bake times per moisture sensitivity level are entered to match your written handling procedure.

Stock and jobs migrated

Stock on the shelves, jobs in progress and customer part numbers are imported from the lists you keep today.

Limitations to settle before implementation

  • Makers of the bare boards themselves will find PCB Manufacturer Management Software closer.
  • Providers that also source components, build whole products and manage customer forecasts will find Electronic Manufacturing Services Provider Management Software closer.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Prototype and pilot lots for hardware startups
  • Turnkey assembly with component sourcing
  • Industrial controller and power electronics boards
  • IoT and smart meter assembly
  • Automotive and EV board assembly
  • Functional testing and programming
  • Box build with enclosures and wiring
  • Long-run production for repeat customers
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements