Cut lists and bills of materials for cabinets
Cut lists and bills of materials turn an approved cabinet drawing into the panels, edge banding, dowels and hardware that an order needs. Stores issue from the same list that the saw cuts from. A change to one panel updates the whole list, so planners and operators work from the current version.
What a cut list and bill of materials hold
Each order carries one list. It names every panel, band, dowel and fitting, with a size and a quantity. Panels go to the saw, and stores read the same lines as material to issue. Both look at one document, not two.
A cut list from release to the saw
Between approval and the first cut, a list passes through several hands. The scenes below follow it through a working week. Each is short. Each shows the same lines read for a different purpose by a different person in the factory.
Who reads the list and what each sees
The cut list is read more on the shop floor than in the office. Each role below opens the same list. It takes only what it needs for the next task of the day.
Decisions before cut lists go live
Cut lists work best when a few rules are fixed before the first live job. Settle these with the lead designer, the planner and the storekeeper. Each answer shapes how the saw is fed.
How cut lists connect to other features
A cut list takes its content from the approved drawing and hands it to the people who cut, issue and pack. Several features read it, so a single correction reaches all of them at once. Five links are worth knowing. Each one is a handover of the same lines, not a retyped copy.
- Takes the approved drawing version from drawing and finish approvals
- Sends panel schedules to production planning and work orders
- Gives board, hardware and finish stock its issue quantities
- Tells purchasing and suppliers what a released job will consume
- Supplies the kit list used by delivery and installation crews
Where cut lists and bills stop
The list records what to cut and what to fit. It does not nest sheets, program the saw or decide the best way to cut a board. Those stay with the machine software and the operator. Rework decisions stay with the supervisor. A joiner who builds a few pieces a month can cut from a drawing and a notebook.
Frequently asked questions
Can we load a panel list from a file?
Panel lists can be keyed in or loaded from a file for each order. Reading one particular design or nesting program directly is separate paid work, agreed at the first workshop. Name your own software then.
What happens when one panel changes mid-job?
Edit that panel, and the whole list updates. Totals for board, edge tape and fittings move with it. Stores and the saw see the new figures, and the earlier revision stays on file beside it.
Does stores see the same list as the saw?
Both read one list. The saw takes the panels, and stores take the board, edge tape and hardware lines as an issue list. No second copy is kept, so the two cannot drift apart over a long job.
Are earlier revisions of a cut list kept?
Every revision stays on file beside the one before it. That settles the question when a customer asks what changed, or when a panel turns out to have been cut to an older list. The current revision is marked.
Does the list cover edge banding and dowels?
Edge banding, dowels, hardware and fittings are lines on the same list as the panels. Each has a quantity. Stores can therefore issue edge tape and fixings against the order, not only the boards, and the report of material used reads correctly.
How this feature fits the system.
Cabinet Manufacturer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and design requests
Each enquiry is logged with its source and site, and drawings, photographs and finish choices stay attached to the customer record.
Lead ManagementQuotations and rate lists
Quotes are built from board, hardware, labour and finish rates, every revision is kept, and open quotations stay in one list for follow-up.
Estimate/Quotation ManagementDrawing and finish approvals
Each drawing version is stored with the customer’s approval and the finish sample, so the cutting team works from the agreed one.
Project Document ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements