Skip to main content
GullySystem

Cycle counts and damage write-offs on the floor

Cycle counts and damage write-offs let a fulfilment centre count a few bins each day instead of closing the floor. Differences are recorded with a reason, and a write-off reaches the seller’s statement only after a supervisor approves it. Supervisors, counters and sellers use it.

What a count and a write-off record

A count compares what a bin should hold with what a person finds there. A write-off removes units that cannot be sold. Four records sit behind both. Each one names the person who made it, and the time it was made.

The daily count list

A short list of bins is set for each day, chosen by the supervisor by seller, zone or last count date. Each line names the bin and the expected quantity. Every bin needs a result. Only then does the list close.

Counted quantity and difference

The counter scans the bin, enters what is there and saves it. The stock record is then compared with that figure. Zero differences are saved too. The history shows that the bin was checked, not skipped.

Reason for each difference

Each difference needs a reason from a short list, such as damaged, mis-picked, wrong bin or found. Counters add a note where useful. A missing reason blocks the count from closing. No gap stays silent.

Write-off request and approval

A damaged or lost unit becomes a write-off request, with SKU, quantity, reason and counter. Only a supervisor can approve it. Until then, the seller’s statement is untouched, and the request waits visibly on the supervisor’s list.

Counting bins without stopping the pick lines

The floor keeps working while counts run, because a count covers only a handful of bins each day. Four moments show how a supervisor spreads the work. Each difference then travels from a bin to a statement. The path is short.

Setting the day’s count list

At the start of the shift, the supervisor picks the bins to count. Bins that held a short pick the day before come first. The list is sent to the counter’s scanner. The floor does not stop.

Counting a bin

Scanning the bin label comes first, then counting the units and entering the figure. A match closes the line in seconds. A mismatch opens a reason screen. Work moves on to the next bin on the list.

Finding crushed units

At one bin, the counter finds a corner of cartons crushed by a heavier pallet above. Some units are unsellable. They are recorded as damaged, with a note, and a write-off request is raised. The bin is corrected.

Approving a write-off

The supervisor opens the write-off list, reads the reason and the note, and approves or rejects each line. An approved write-off reduces stock and appears on the seller’s statement. A rejected one goes back for a recount.

Who counts, who approves and who reads the result

Counting and approving are kept apart on purpose. One person counts, another approves, and the seller reads the result. Each role sees the part it needs, and the system records every name.

For pickers and packers

When a pick turns up empty, the picker flags the bin for a count. A trained picker may also carry out counts on the daily list. Approval screens are closed to them. Their job is to find and record.

For inbound and put-away teams

The inbound team counts bins that just received stock, because put-away errors show up first there. A misplaced pallet found in a neighbouring bin is moved by scan. The count line records the fix. Stock is not lost.

For centre managers

A manager reads count results and write-offs by seller and reason, and sees which sellers or zones show repeated differences. Write-offs above an agreed value can be routed to the manager. Sign-off follows. It is quick.

For sellers signing in

Each seller reads approved write-offs on its own statement, with the SKU, quantity, reason and date. Rejected requests and other sellers’ counts stay out of view. Queries to the centre are welcome. Any line can be questioned.

Decisions to settle before counting begins

Counting rules protect both the centre and the seller, so agree them before the first write-off appears on a statement. Sit down with the supervisor, the centre manager and one seller’s contact. Enter the answers as the count rules. Keep the rules short.

Who may approve a write-off

Decide whether a supervisor can approve any write-off or whether larger ones go to the centre manager. Name the people. Nobody approves a request they raised. The software blocks that attempt and records it, so the rule holds.

What the count leaves out for cycle counts and damage write offs

Decide whether packing material and the centre’s own supplies are counted here. Seller stock is the scope. Keep consumables and equipment out, so seller statements carry only units the seller owns. Mixed counts cause arguments.

Opening stock before the first count

Bin-wise opening stock is counted before go-live, and every later count compares against it. Count once on a quiet day. Differences found then are corrected in the opening balance, not written off. Nobody pays for a start-up error.

Which report to read first for cycle counts and damage write offs

Begin with differences by reason, seller and bin. Supervisors read it to choose tomorrow’s list. It shows where damage or mis-picks gather. The next counts then go where they are needed, not where they are convenient.

How counts and write-offs link to other features

Counting checks the stock record against the shelf, and it sends approved losses to the seller. It therefore sits between the floor’s records and the seller’s statement. Five handovers follow. Each one passes a record to or from the count, and none is retyped by hand.

  • Stock by bin supplies the expected quantity for each count
  • Wave picking flags bins where a pick came up short
  • Inbound receiving lists bins that took new stock
  • Seller billing carries approved write-offs onto the statement
  • Seller portal shows each seller its approved write-offs

Where counts and write-offs stop

A count finds differences and records them. It does not explain a loss beyond the reason chosen, and it does not value stock or decide an accounting write-down. Whether an auditor or insurer needs a full count is for the owner and the accountant. A small floor with few bins can count on paper. That works.

FAQ

Frequently asked questions

How big should each day’s count list be?

That is for the supervisor to set, based on the size of the floor and the people free to count. The system tracks the last count date for each bin. Skipped bins rise to the top. Nothing is forgotten.

Can a picker request a count when a bin looks wrong?

A picker can flag a bin as short or suspect, and it joins the next count list. The flag keeps the picker’s name. Supervisors can move a flagged bin to the top of the list.

What reasons can be given for a difference?

The list is short and agreed during set-up, for example damaged, mis-picked, wrong bin and found. Our team edits it on request. A reason is required. Every gap therefore carries an explanation, and nothing is left blank.

What happens when a write-off is rejected?

The request returns to the counter with the supervisor’s note, and the bin is counted again. Stock and the seller’s statement stay unchanged until a new result is approved. The rejected request remains in the history.

Can a seller question an approved write-off?

Sellers see the SKU, quantity, reason and date of every approved write-off and can raise a query with the centre. The count line and the approval name are there to answer it. Both are kept.

Where it fits

How this feature fits the system.

E-commerce Fulfilment Centre Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Stock by SKU, batch and bin

Stock is kept per seller by bin, batch and size, and each move between bins is scanned so counts match the shelf.

Warehouse Management

Order intake from channels

Orders from marketplaces and stores are matched to seller and SKU, and any order with short stock is held instead of released.

Order Management

Wave picking and pack bench

Pickers scan bins and items, the pack bench rejects an item that is not on the order, and the carton label prints on the spot.

Barcodes and Labels
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements