Skip to main content
GullySystem

BOM import and quotation for component distributors

A buyer sends an Excel parts list, and the desk uploads it. Each line is matched to the part master, and the lines that are short of stock or unmatched are marked. The quotation then carries stock, lead time and rate for every line, and each revision stays on file for the buyer’s next question.

What a BOM and its quotation record

Two linked records are kept. One is the BOM as the buyer sent it. The other is the quotation built from it. Between them, four kinds of detail are held for every line that goes through the desk, from import to the final offer.

The buyer’s lines as imported

Each line of the uploaded Excel becomes a line on the BOM with the buyer’s own number, description and quantity. Lines are kept as sent. Corrections happen on the matched side, so the original stays readable.

Match status on every line

A line is matched, short of stock, unmatched or flagged for end of life. Status shows beside the line. No line is guessed, so a line with no credible match waits for the sales desk to resolve it.

Stock, lead time and rate

Three figures sit on each line. Stock in hand, the supplier’s lead time and a rate are shown together. The rate comes from your price list or the last landed cost. Approved alternates appear where the customer allows them.

Every revision of the quotation

When the buyer changes a quantity or drops a line, the quotation is revised. Earlier versions are not overwritten. They stay on file, so the desk can show exactly what was offered and when, even months later.

A BOM from upload to quotation

A BOM crosses the desk in steps. Each step is a person doing a particular job. Here are four moments from the life of one assembly line’s file. Each shows where the work lands, from the buyer’s email to the revised offer.

The email with two hundred lines

A buyer at an assembly line emails an Excel file of parts. Sales uploads it. Lines match against the part master in one pass, and a short list is left over for a person to look at.

Resolving what the file flagged

Unmatched lines, end-of-life parts and customer part codes are marked for the sales desk. Each one is settled by hand. A person decides, never a guess. A wrong suffix is spotted here, before it reaches a board.

Sending a priced quotation

Every line is resolved first. The desk reviews stock, lead time and rate, then sends the quotation to the buyer. Lines with no stock show the supplier lead time in place of a shelf quantity.

Revising after the buyer’s reply

The buyer’s planner drops a line and raises another quantity. Sales opens the quotation and revises it. The first version stays on file, and the second is the one the buyer now holds. Both can be shown later.

Who works on a BOM and what each sees

Several desks touch a BOM. Each role sees the same lines but looks for something different before an order is placed. Here is what each person reads on the screen.

Sales desk importing and quoting

Sales import the file and resolve flagged lines. They see stock, lead time and approved alternates beside each line of the file. Then the quotation goes out. A revision follows when the buyer changes the list.

Buyers checking short lines

Buyers open the short lines of a file. They see which need a supplier order and which already have one, with the date each supplier confirmed. Those confirmed lead times are what the desk quotes from.

Stores confirming the shelf balance

Stores do not edit a BOM. Their reel counts feed the stock shown on each quotation line. That is why a balance on the screen has to match what stands on the shelf. Split reels update it at once.

Owners reading quoted and lost

Owners read BOMs quoted, won and lost, by customer. The list shows which assembly lines send files that become orders and which stall at the quotation. Margin by customer sits beside it. Both are read before pricing rules are revisited.

Decisions to settle before BOMs are quoted

Quotations carry prices, so the first decisions are about control. Settle these four with the sales head and the owner before the first live file is uploaded. Rules written down early save arguments later.

Who may change a quoted rate

Rates come from your price list or the last landed cost. Decide whether a sales executive may override one, and whether a margin rule limits the override. Name the person who approves an exception. Write the rule down.

What the import leaves out

Buyers add columns of their own, such as reference designators or notes. Agree which are read. The rest are ignored, so the import stays predictable for every customer and nobody re-checks columns that carry no meaning.

How old quotation workbooks load

Your past quotation workbooks are mapped to the part master. The sales head checks the mapping before anything is loaded. Old quotations then sit beside new ones. Repeat files start from the rates the desk quoted before.

Which list opens the first review

Start with lines short of stock, with the supplier order covering each. It tells the buyers where to act today. BOMs quoted, won and lost is the next list for the owner, once a few files have gone through.

How BOM quotation connects to other features

A quotation is built from other records and hands its result to the next stage. Traffic runs both ways. It reads the part master, the stock and the cost, and a won BOM turns into an order. Five links show the traffic in both directions, from matching to the order.

  • Part master and customer codes decide how lines match
  • Stock by date code supplies the quantity shown per line
  • Supplier orders cover lines the quotation found short
  • Import costing supplies the landed cost behind a rate
  • Schedules and call-offs take over once the buyer orders

Where BOM quotation stops

Quoting follows what is on the file. It does not judge whether a part suits the buyer’s board or design, and it does not set your prices. Price lists, margin rules and terms of sale remain the owner’s decisions, and tax treatment stays with your accountant. Anyone sending five lines can be quoted from a message.

FAQ

Frequently asked questions

Where does the rate on a quotation line come from?

It comes from your price list or from the last landed cost for that part. Margin rules and minimum order values follow the way your desk prices a BOM today. Every rate follows rules your desk has set.

Can a quotation be revised after it is sent?

Yes. Revise it when a quantity or a line changes. The earlier version stays on file, so the desk can show what the buyer was offered at each point. Nothing is overwritten. Disputes about which price applied are settled from the record.

Does an end-of-life part stop a quotation?

No. The line shows a warning. The desk then decides whether to quote it, offer an approved alternate or tell the buyer. The warning informs the choice and never blocks it. That keeps a withdrawn part from being quoted unnoticed.

Are alternates offered on every line?

Only where the customer allows them. Alternates the buyer has approved for a part appear beside that line. Another buyer’s approvals are not shown, so a swap is never offered without consent. Each approval is kept on the part record.

How do we see which BOMs were lost?

Open BOMs quoted, won and lost, by customer. Each file keeps its status, so lost lists can be reviewed alongside the won ones. The owner reads the same screen as the sales head. Sort it by customer to see which assembly lines never convert.

Where it fits

How this feature fits the system.

Electronic Components Distributor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

BOM import and quotation

Each BOM line becomes a quoted line with stock, supplier lead time and rate, and a revised file keeps the earlier version on record.

Quote & Proposal Management

Stock by date code, lot and reel

Every reel received is numbered with its lot and date code, so a pick follows the code the buyer wrote on the order.

Batch and Serial Tracking

Bin locations and counts

Movements by bin raise a flag when a part falls under its reorder level or a count differs from the book balance.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements