Skip to main content
GullySystem

Installation jobs for a garage door firm

Each installation is a job that carries its factory order, its site measure and its crew booking. At handover the installers record the balance, travel, photo eye and safety reversal checks. The signed handover stays on the job with its photographs. A later question is answered from the record.

What a door installation job records

An installation job gathers everything a crew needs for one door and keeps what the crew finds on the day. It is opened when the factory order is placed. The fields below sit on one record. Nobody searches three places.

Order and site measure attached

The factory order and the site measure from the sales visit are attached to the job. Installers read the selections beside the opening, headroom and side room. A mismatch shows early. The van is still in the yard.

Crew, date and parts list

The job names the installers and the booked date. Installers work from their own parts list, kept apart from the repair vans. Springs, rollers and hardware are issued to the job. Repairs keep their own.

Handover checks recorded

At handover the crew records the balance test, the travel of the door, the photo eye alignment, the safety reversal test and the force setting. Each result is typed against the job. A skipped check is visible.

Signed handover and photographs

The customer signs on the job, and photographs of the finished door are stored with it. The signed handover stays there. Questions about what was fitted, and in what state, are answered from that record.

An installation day from van to handover

An install runs from loading the van to the customer’s signature, and the record follows the crew all the way. Four moments show where the job sheet is used. A skipped step would cost a return visit. Each is described below.

Before the crew leaves

Staff confirm the door has been delivered and the job holds the measure. Installers open the job on a phone and check the parts list against what is on the van. Anything short is found at the yard.

On site, fitting the door

Installers compare the delivered panels with the order. A difference in colour or size is noted on the job before the door goes up. The track radius and the opening are checked against the measure.

Testing before leaving

With the door hung, the crew runs the balance test, checks the travel and the photo eye, and tests the auto-reverse and the force setting. Readings go in at the door. None is left to memory.

The customer signs

The customer looks over the finished door and signs the handover. The installer takes photographs. Then the job is closed. The closed job sheet goes to the office, where the invoice is drawn from it.

Who works from the installation job

Installation touches the crew, the office, sales and the owner. Each needs a different slice of the same job. What each may edit is set with you at the start. Other fields stay locked.

What installers see

Installers see their own booked jobs with the order, the measure and the parts list. They record readings, photographs and the customer’s signature. Jobs belonging to another crew stay hidden, unless you choose to show them.

What the office sees for Installation jobs

Staff see every install against its factory delivery date, with the crew booked and the status of the order. They move a crew when a door runs late or a date slips. Closed jobs flow on to billing.

What sales staff see for Installation jobs

Salespeople see whether the job they sold is booked, delivered, fitted or handed over. The site measure they took stays on it. That lets them answer a customer’s call without phoning the crew or the yard.

What the owner sees for Installation jobs

The owner sees installs scheduled against factory delivery dates, and the jobs closed with all handover checks recorded. A job closed with a check missing is easy to find. That is where to look first.

Decisions about installation jobs before set-up

Handover records are only as honest as the rules around them, so a few decisions belong in the first meeting. They settle who closes a job, what is required and which view the owner checks first. The owner and the lead installer settle them.

Who may close an installation

Decide whether a job can close only after every handover check is filled in, and whether the office may close one on the crew’s behalf. A strict rule is easier to defend later. Agree it now.

Which checks your firm records

Your installers already run a routine. Agree which checks appear on the job, such as balance, travel, photo eye, auto-reverse and force setting. The manufacturer’s own installation sheet stays with the manufacturer. A check you do not record cannot be reported later.

How open installs come across

Installs already booked, with their customers and doors, come over from your register or spreadsheet, along with their open jobs. The office reads the imported list first. Finished installs from past years can stay in your old files.

Which report matters first for Installation jobs

Installs scheduled against factory delivery dates is the first to watch. It shows which crews are booked ahead of their doors. That is the view to open first. Later, add the report on invoices raised for door jobs.

How installation jobs link to other features

An installation is where several features meet. It takes the order and the measure, draws parts from stock, and sends a finished job sheet on to the invoice. The new door then needs a record of its own in the register. Five links go in first.

  • Takes the selections and lead time from factory orders
  • Reads the site measure saved with the quotation
  • Issues crew parts from van stock and warehouse parts
  • Hands the closed job to invoices, receipts and balances
  • Adds the fitted door to door and opener records

Where installation jobs stop

This feature records what the crew did and what they found. It does not run the tests, judge whether a door is safe or confirm that a building complies with local rules. Those remain with the installer, the owner and an adviser. Warranty terms stay with the owner. A firm fitting a door now and then can use a paper handover form, signed at the door.

FAQ

Frequently asked questions

Which handover checks does the job record?

Balance, travel, photo eye and safety reversal checks are recorded, along with the auto-reverse test and force setting. Which of them appear on your jobs is agreed at set-up. Each result is stored against the job.

Can the crew see the site measure on site?

Yes. The measure taken by sales staff is attached to the job, so installers open it on a phone at the property. Opening, headroom, backroom and side room are there. The crew checks them against the door.

Are installs scheduled apart from repair calls?

Yes. Installer crews are scheduled separately from repair vans, and each has its own parts list. A repair call does not pull an installer off a booked job. Moving a crew is always dispatch’s decision.

What if the delivered door differs from the order?

The crew notes it on the job, with photographs, before fitting. The office sees the note and takes it up with the manufacturer, quoting the order reference and the delivery date. Any claim stays with the owner.

Where is the customer’s signature kept?

It is kept on the installation job itself, with the photographs. It stays there after the job closes. Anyone with access to the job can open the signed handover without asking the crew or digging through paper.

Where it fits

How this feature fits the system.

Garage Door Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Call intake and dispatch

Each repair call becomes a numbered ticket with an address, a door type, a fault and an owner, so dispatch knows which calls remain open.

Ticket Management

Call intake and dispatch

The day’s calls and installs are placed against technicians by area and availability, and each one receives a job sheet on the phone.

Technician Scheduling

Door and opener records

Each door is held as an asset with its make, size, spring type and opener model, and every service visit made to it is listed beneath.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements