Admission, consent and certification for hospice
This feature records the step where an accepted referral becomes a patient. The admission visit, signed consent, medical director’s certification and first orders are filed on the patient record, each with its renewal date. Admitting nurses, the medical director and administration staff use it daily.
Documents filed at hospice admission
Admission produces a small set of papers that the whole service depends on. Each one is stored on the patient record, not in a drawer. A reader can see what exists, who signed it and when it was done. Four papers carry the weight.
From admission visit to renewal diary
A document is only as good as the day it is found. Following one patient from admission shows how the dates drive work for several people. Each step leaves a trace in the record. The next person picks it up from there.
Who handles admission papers and what they see
Admission papers are clinical and legal in nature, so access is narrow by design. Each person sees the part they need to do their job. Edits are dated with a name.
Admission rules to agree before go-live
The wording of forms and the length of intervals belong to your service and its advisers. The system holds what you decide. Settle these points with the medical director and the clinical lead before set-up.
How admission links to other hospice features
Admission is the hinge between intake and care. It receives a case that has been accepted and releases a patient who can be visited, medicated and billed. Several other features wait for it, and none of them can start until consent and certification are on the record.
- Receives accepted cases from referral intake
- Opens care plans by discipline once consent is recorded
- Gives visit scheduling a patient who may be visited
- Passes signed orders to billing by level of care
- Puts renewal dates on the team review list
Where admission records stop
This feature stores documents and dates. It does not decide whether a patient is eligible, whether a consent is valid or how frequently a certification must be renewed. Those questions belong to the medical director, the service’s advisers and the rules that apply to your country. It files nothing with an authority. A very small service with two or three admissions a year may find a signed folder enough.
Frequently asked questions
Can consent be signed on a tablet in the home?
Yes, on a handheld device where your service decides to allow it. The signature is saved to the record with the date and the name of the signer. Paper forms can be scanned and attached instead.
Does the system tell us when a certification is due?
Each document carries a renewal date, and patients with dates coming due appear on a list. Dates drive the list. Coordinators sort it at the start of the day. The intervals themselves are set by your service and its advisers.
Can we use our own admission and consent forms?
Your forms and wording are used. Their content is decided with your clinical leaders and advisers. Staff at GullySystem set up the layout, and a later change to wording is made on request, with the old version kept for reference.
What if a document is missing at admission?
The record shows an empty line for each expected document. Administration sees which patients have gaps. The coordinator phones the nurse or the medical director, and the missing item is added with its own date when it arrives.
Who can see the signed certification?
Clinicians and administration staff see it. Aides and volunteers do not. Access follows the role, and your service decides whether social workers and chaplains see the page itself or only the fact that it exists.
How this feature fits the system.
Hospice Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Visit scheduling
The day’s nurse, aide and social work visits are placed against staff by area and need, and missed visits are flagged to the coordinator.
Technician SchedulingAdmission, consent and certification
Signed consent, certification and first orders are stored on the patient record, each with the date it must be renewed.
Document ManagementEquipment loans
Every bed, mattress and oxygen unit has its own entry showing which home it is in, when it was delivered and when it was last inspected.
Fixed Asset RegisterTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements