Skip to main content
GullySystem

Technician time and work in a repair shop

Technician time and work records the hours each person spends on a motor, pump or gearbox, whether stripping, rewinding or balancing a rotor. Hours sit against the job and are priced at the workshop’s labour rate. The owner knows the labour cost on the day the job closes, not after the invoice has gone.

What a time entry records against a job

A time entry is small. It carries the labour half of the job cost. It says who worked, on which unit, at what task and for how long. Four fields make it useful to an owner on the day the job closes.

Hours by technician and task

Each entry names the technician, the task and the hours spent, such as stripping a gearbox, rewinding a stator or balancing a rotor. Two people on one job produce two entries. Nothing is pooled under a single name.

Date and job number

An entry carries the date and the job number printed on the tag, typed or picked at the bench. Time cannot drift onto a neighbouring unit. A pump and its twin from the same plant keep separate labour totals.

A short note on the work

A line of text says what was done, for instance that the drive-end journal was sleeved or that the rotor was balanced a second time. Keep it brief. The estimator reads it when a similar unit comes in.

Labour priced at the set rate

Hours are multiplied by the labour rate loaded into the workshop’s lists, the same rate the quotation used. Labour cost builds up as entries arrive. On the day the job closes the total is already known.

How hours get logged through a repair

Late time is guessed time. An entry is only useful when it is made close to the work, on the floor. Four moments show where technicians log hours and where others read them, from the strip bay to the day a job closes.

At the end of a strip

A technician finishes stripping a gearbox and logs the hours before picking up the next job. The entry takes seconds. Waiting until the end of the week would mean guessing which day went to which unit.

Two people on one rotor

One technician rewinds a rotor while a second balances it at the next bench. Each logs their own hours against the same job number. The record shows who did what. The total shows what the job really took.

A supervisor checks the day

Near closing time the supervisor looks over the day’s entries on screen. An unusually long strip, or a job with no hours, is queried while the technician still remembers. Corrections are made the same day.

The job closes

The last test passes and the job closes. The labour total is ready. The owner sets it beside the quoted labour in the approved quotation and sees at once whether the rewind ran over or under.

Who logs hours and who reads them

One group types the hours and three groups read them. Technicians need entry to be quick. Everyone else needs the totals to be dependable, because decisions on price follow from them.

For technicians at the bench

Technicians open their assigned jobs and add time from the bay. The tag in hand matches the job number on screen. Parts and test readings go in from the same place. Nobody leaves the bench.

For owners reading job cost

Owners see job cost against the quoted figure, with labour as one part of it. A rewind that took longer than priced is visible while the repair is fresh and the customer is still waiting. The gap is plain.

For inspectors and estimators

Estimators compare logged hours with the labour they quoted on the same kind of unit. A motor frame that keeps running long is easy to spot. The next quotation starts from the true figure. Hours become evidence.

For accounts reviewing the job

Accounts review job cost before the invoice goes out, line by line. Parts and hours sit together on the job. A difference between cost and the approved quotation is spotted before the customer sees the bill.

Decisions to settle before technicians log time

Time records are only as honest as the habits behind them. Settle four things with the supervisor and a few technicians before the first entry.

Who may correct an entry for Technician time and work

Decide whether a technician may edit their own entry or must ask the supervisor. A wrong figure distorts cost. Same-day correction by the person who made the entry is the simplest rule, and a closed job needs the supervisor.

What time is left out for Technician time and work

Cleaning, waiting for parts and walking to the stores can be recorded as job time or left out as shop time. Settle which. Either choice works if every technician follows the same one. Then jobs compare fairly.

How open jobs start

Jobs already on the floor at launch are read in without their earlier hours. The supervisor may key in an estimate, or the job may start from zero hours. Choose one rule. Apply it to every open job.

Which report matters first for Technician time and work

Start with job cost against quoted figure. Decide who reads it when a job closes and what size of overrun calls for a talk with the estimator. Hours alone do not tell that story, because parts and outside work sit in the same total.

How hours join the rest of the job cost

Labour is one of three costs the workshop carries on a job, with parts and outside work. One total, three inputs. Time entries feed the same total that the quotation promised and the invoice will follow. Everything lands on the job number from the tag.

  • Takes assigned jobs and stages from repair stages and bays
  • Reads labour rates from the quotation lists
  • Adds hours to the parts issued from stores
  • Adds outside work charges to the same job total
  • Gives accounts a labour figure before invoicing

Where time recording stops

This feature records hours against jobs. It is not an attendance register and it does not calculate wages, overtime or leave. Pay, contracts and employment rules stay with the owner and an adviser. A bench of one person who quotes a fixed price for every repair can skip the time log, and keep notes on paper.

FAQ

Frequently asked questions

Can two technicians log time on one job?

Each person logs their own hours against the job number. The job shows every entry and the total. A rotor rewound by one technician and balanced by another has two lines, each with a name.

Does this replace our attendance or payroll system?

It does not. Hours here belong to jobs. Wages, shifts and leave stay in whatever your workshop uses today. The two can be compared by the owner, but they are separate records, kept for separate reasons.

When do we learn the labour cost of a job?

On the day the job closes. Hours are priced as they are logged, at the labour rate, so the total builds through the repair. Nobody waits for month end to learn that a rewind ran over.

What if a technician forgets to log time?

A late entry keeps its true date. Agree during set-up how late is acceptable. Gaps are then caught while memory is fresh.

Can I compare hours with what we quoted?

Job cost against quoted figure is one of the reports. It sets logged labour beside quoted labour. Large differences show which kinds of repair are being priced too low or too high, so rates can be reviewed.

Where it fits

How this feature fits the system.

Industrial Repair Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Teardown reports

Each unit has a job card where the inspector records measured wear, parts to replace and the likely cause of failure.

Job Cards

Quotations and approvals

A quotation is priced from the teardown lines using your labour, machining and part rates, with every revision kept and the approval noted.

Quote & Proposal Management

Repair stages and bays

A repair moves through strip, repair, machining, assembly and test, and the board shows which bay and technician hold it now.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements