Technician time and work in a repair shop
Technician time and work records the hours each person spends on a motor, pump or gearbox, whether stripping, rewinding or balancing a rotor. Hours sit against the job and are priced at the workshop’s labour rate. The owner knows the labour cost on the day the job closes, not after the invoice has gone.
What a time entry records against a job
A time entry is small. It carries the labour half of the job cost. It says who worked, on which unit, at what task and for how long. Four fields make it useful to an owner on the day the job closes.
How hours get logged through a repair
Late time is guessed time. An entry is only useful when it is made close to the work, on the floor. Four moments show where technicians log hours and where others read them, from the strip bay to the day a job closes.
Who logs hours and who reads them
One group types the hours and three groups read them. Technicians need entry to be quick. Everyone else needs the totals to be dependable, because decisions on price follow from them.
Decisions to settle before technicians log time
Time records are only as honest as the habits behind them. Settle four things with the supervisor and a few technicians before the first entry.
How hours join the rest of the job cost
Labour is one of three costs the workshop carries on a job, with parts and outside work. One total, three inputs. Time entries feed the same total that the quotation promised and the invoice will follow. Everything lands on the job number from the tag.
- Takes assigned jobs and stages from repair stages and bays
- Reads labour rates from the quotation lists
- Adds hours to the parts issued from stores
- Adds outside work charges to the same job total
- Gives accounts a labour figure before invoicing
Where time recording stops
This feature records hours against jobs. It is not an attendance register and it does not calculate wages, overtime or leave. Pay, contracts and employment rules stay with the owner and an adviser. A bench of one person who quotes a fixed price for every repair can skip the time log, and keep notes on paper.
Frequently asked questions
Can two technicians log time on one job?
Each person logs their own hours against the job number. The job shows every entry and the total. A rotor rewound by one technician and balanced by another has two lines, each with a name.
Does this replace our attendance or payroll system?
It does not. Hours here belong to jobs. Wages, shifts and leave stay in whatever your workshop uses today. The two can be compared by the owner, but they are separate records, kept for separate reasons.
When do we learn the labour cost of a job?
On the day the job closes. Hours are priced as they are logged, at the labour rate, so the total builds through the repair. Nobody waits for month end to learn that a rewind ran over.
What if a technician forgets to log time?
A late entry keeps its true date. Agree during set-up how late is acceptable. Gaps are then caught while memory is fresh.
Can I compare hours with what we quoted?
Job cost against quoted figure is one of the reports. It sets logged labour beside quoted labour. Large differences show which kinds of repair are being priced too low or too high, so rates can be reviewed.
How this feature fits the system.
Industrial Repair Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Teardown reports
Each unit has a job card where the inspector records measured wear, parts to replace and the likely cause of failure.
Job CardsQuotations and approvals
A quotation is priced from the teardown lines using your labour, machining and part rates, with every revision kept and the approval noted.
Quote & Proposal ManagementRepair stages and bays
A repair moves through strip, repair, machining, assembly and test, and the board shows which bay and technician hold it now.
Work Order ManagementTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements