Repair quotations and approvals for workshops

Quotations and approvals turn a teardown report into a priced offer for a motor, pump or gearbox. The estimator picks parts, labour and machining from the workshop’s own lists. Every revision is kept. When the customer decides, the system records who approved the work and on which date, so the invoice has something to follow.

What a repair quotation keeps on record

A quotation here is more than a total. It is a set of priced lines tied to a job, with every version and every reply preserved. The record holds four things that a phone call or a loose sheet would lose.

Priced lines from your lists

Each line takes its rate from the workshop’s lists. Labour and machining come from set rates, and common parts such as a 6205 bearing or a lip seal come from the parts list. Only the quantity changes per job.

Every revision as sent

When a figure changes, the earlier version stays. Staff can show what moved between the first quotation and the approved one. A rewind added after teardown shows up as a new line, not a quiet edit.

The customer’s decision

The reply is recorded as approved, queried or scrapped. A queried quotation stays open with the question beside it, ready for the answer. A scrapped unit is marked so. The bench knows to stop work on it.

Approver, date and reference

The record carries the approver’s name and the date. A purchase order number can be added when one follows. If the customer disputes the work later, the answer is already on the quotation. Nobody reconstructs it.

A working week of quotes and replies

Quotations move at the pace of the customer’s reply. A plant waiting on a motor wants a figure fast, and a workshop wants to start only on work that is approved. Speed matters on both sides. Four moments from a normal week show how the record is used.

A figure built from the findings

The estimator opens a finished teardown report and builds the quotation from it. Parts to replace become priced lines. Rewinding, machining and balancing are added from the rate lists. The finished figure goes to the customer.

A plant queries one line

A maintenance planner rings to question the shaft sleeve. The query is noted on the line. The inspector replies with the journal reading. The answer sits on the quotation, not on a scrap of paper.

Approval arrives by phone

A customer approves a rewind over the phone. The office records the name and date against the quotation at once. The customer’s order number is attached when it arrives. The call leaves a trace of who agreed to what.

An older quote is chased

On Monday the owner opens the list of quotations awaiting approval and looks at the oldest. The office rings that plant. Quotations that lapse are marked as lapsed, so the bench never starts on them.

Who prices, approves and bills from the quotation

Several desks depend on the same quotation. Each needs a different slice of it, and none should have to ask another desk for a figure that is already on the record.

For inspectors and estimators

The inspector supplies the findings. Estimators turn them into priced lines and record the customer’s reply. A revised figure is entered as a new version. The old one is not overwritten, so the earlier price can always be shown.

For owners watching the pipeline

An owner sees quotations awaiting approval and lapsed ones, and later compares job cost with the quoted figure. A job running over its quote is visible before the invoice goes out. Overruns show early. That leaves time to talk to the customer.

For technicians in the bays

Technicians see the approved scope of work for the job in front of them, so they know what the customer agreed to pay for. If a technician finds extra damage, the estimator prepares a revision. The extra waits for approval.

For accounts raising the invoice

Accounts invoice against the approved quotation. An approved extra appears as a separate, labelled line. The clerk does not have to guess which figure the customer agreed, because the approval, with its name and date, is on the record.

Decisions to settle before the first quotation

Quoting works when its rules are written down. Four short rules cover it. Agree them with the owner and the estimator before the lists are loaded, and keep a copy beside the rate lists.

Who may change a quotation for quotations and approvals

Decide who may revise a figure and who may record a customer’s approval. An estimator might revise, while an owner alone records an approval above a stated amount. Fix this before the first quotation is issued.

What is priced as flat lines

Decide which small items, such as varnish, fasteners and crating, are priced as a flat line and which are priced one by one. Keep the rule simple. Quotations then stay quick to build and easy to read.

How open quotations come across for quotations and approvals

Pending quotations are read in from your files at launch. Decide which are still live. Lapsed ones are closed before the first day of use, so nobody starts work on a dead offer. Live ones keep their approval trail from then on.

Which report matters first for quotations and approvals

Begin with quotations awaiting approval or lapsed, the list the office will open first. Name who reviews it each morning. Set the age that triggers a call to the plant. Job cost against the quoted figure is the report to add next.

How quotations connect to the rest of the job

A quotation takes its lines from the teardown report and hands its approved figure to everything after it. The stages that follow read the same record. No desk re-enters a price. Billing in particular depends on the approval trail, because the invoice follows the approved figure.

  • Takes replace and repair lines from the teardown report
  • Releases approved work to the repair stages and bays
  • Lets stores see which bearings and seals will be needed
  • Passes outside work such as line boring into the quoted figure
  • Gives accounts the approved lines to invoice against

Where quotations and approvals stop

This feature prices and records. It does not decide what the workshop should charge, and it does not chase a customer on its own. Rates, discounts and credit terms stay with the owner. Tax treatment of the invoice is for the accountant. A single small repair with a fixed price can run on a template quotation.

FAQ

Frequently asked questions

What happens when a customer scraps the unit?

The quotation is marked scrapped, with the name of the person who decided and the date. The bench then stops work on it. What is owed for the teardown is for the owner to settle with the customer.

Can I see every earlier version of a quotation?

Every earlier version stays on the quotation as it was sent. The first figure and the approved one open side by side. A dispute about a changed price is then simple to answer. Versions are never overwritten.

Where do the labour and machining rates come from?

They are loaded from your own lists during implementation, along with common parts such as bearings and lip seals. If a rate changes later, you ask. GullySystem edits the list. Quotations then start from current prices.

Is there a way to spot lapsed quotations?

A report lists quotations awaiting approval or lapsed. Open it first each morning. Anything old is chased by phone, and the reply is recorded on the same quotation, with the name of the person who gave it.

Can the approval carry the customer’s order number?

The approval can carry the customer’s order number. Add it when it arrives from the plant. The invoice then matches the customer’s own paperwork, which helps their accounts clear it without a query or a second call.

Where it fits

How this feature fits the system.

Industrial Repair Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Teardown reports

Each unit has a job card where the inspector records measured wear, parts to replace and the likely cause of failure.

Job Cards

Quotations and approvals

A quotation is priced from the teardown lines using your labour, machining and part rates, with every revision kept and the approval noted.

Quote & Proposal Management

Repair stages and bays

A repair moves through strip, repair, machining, assembly and test, and the board shows which bay and technician hold it now.

Work Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.