Skip to main content
GullySystem

Pre-Delivery Inspection and RV Handover Checklist

Each unit gets its own checklist before it leaves: gas, electrical, water, seals and slide-outs. Technicians tick the lines and note what they fix. Fitted options are installed first. The buyer’s orientation walk-through is signed off before the keys are released, and the sign-off stays on the unit’s record.

What a pre-delivery sheet holds for each coach

Handing over a coach with a leaking fitting is how a first trip goes wrong. The sheet exists to prevent it. Each line is a system, each tick carries a person’s name, and each failed line becomes a job with an owner.

Gas, electrical and water lines

Separate lines cover the gas, electrical and water systems. Each takes a result and a note. A technician who finds a weeping connection records it on that line, and the next reader sees exactly where it was.

Seals, roof and slide-outs

Seals around windows and doors are checked, along with the roof and every slide-out through its full travel. Results sit in the same list. Wording follows your own checklists, loaded for each unit type, so the lines read as your technicians say them.

Fitted options installed and confirmed

Options sold on the deal, such as an awning, hitch or solar kit, appear as lines to install and confirm. Each is ticked when fitted. Nothing the buyer paid for leaves the lot as a promise.

Buyer sign-off and key release

A signature closes the sale. The orientation walk-through is signed off on the record. Only then are the keys released. The signature, the date and the technician’s name stay with the unit for any later question.

One coach through inspection and handover day

Thursday is quiet on the lot. A newly sold motorhome moves into bay 3. By evening the checklist is complete and the fitted options are on. The buyer is booked for Friday morning, and nothing is left to find or fix.

Morning, the gas and water checks

The technician works through the gas lines with a note beside each result, then fills the water system and looks for drips. A loose fitting under the sink is found and tightened. It is logged.

Midday, the awning goes on

The deal sheet listed an awning. Its line sits on the checklist, and the fitter ticks it when the bracket and fabric are mounted. What was sold is fitted.

Afternoon, a failed line becomes a job

A slide-out seal fails its line. The failure is noted and a repair order is opened against the same unit. Handover waits. Nobody tries to remember the fault overnight.

Friday, the walk-through and the keys

The buyer walks around the coach with the technician, who explains each system. Orientation is signed off. Then the keys are released, and the date and name are on the record.

The people who sign, book and watch a handover

A handover has several hands in it. Technicians do the checks, advisors book the time and sales staff meet the buyer. Principals watch the count of coaches waiting. Each sees its own part.

For technicians working down the checklist

The technician sees the units assigned for the day and the lines to complete on each. Results and photographs go in from a phone. Closing the last line tells everyone else.

For service advisors booking the bay

Advisors place the inspection on a bay and a technician’s day, and tell the sales desk when a unit is ready. A failed line sends a new job to schedule. The queue stays honest.

For sales staff meeting the buyer

A salesperson confirms the handover time with the buyer and checks the balance due. The signed walk-through is already there to see. Keys leave the cabinet only after that.

For dealer principals watching units awaiting inspection

Principals look at the number of sold units still waiting in the queue. A coach sitting uninspected is a coach not delivered. Pressure falls on the bay, not on guesswork.

Handover rules to fix before the first sign-off

A checklist that anyone can tick is a checklist nobody trusts. Settle who signs, which failures hold the keys and how each unit type differs. Take these up with the technicians themselves.

Who signs for the buyer’s walk-through

Decide whether a technician, an advisor or a salesperson leads the orientation, and who records it. Settle it for each unit type. One name goes on the record, not three.

Which failed lines hold the keys

A scuffed trim line and a leaking gas fitting are not equal. Decide which lines must pass before keys are released. Others may be noted for a later visit. Settle the split with technicians.

Checklist lines for a Class A and a towable

Pre-delivery lists follow your own wording for slide-outs, roofs, gas and water systems. Agree separate lines for each unit type. A towable has no dashboard to check, and a Class A does.

Sold units already waiting at go-live

Some sold coaches will be on the lot when the system starts. Decide whether each is inspected afresh or carried over with its old sheet. Walk the lot to count them.

How inspection links sale, bay and claim

Inspection sits between sale and keys. It reads what was sold from the deal sheet and what was paid from the receipts. Failed lines turn into repair work. Some of that work may become a manufacturer claim, and the pack starts from the same record.

  • Unit stock supplies serial number and fitted options
  • Quotations and deal sheets list the options to install
  • Deposits and receipts show the balance before keys go
  • Repair orders open for any line that fails
  • Warranty claim packs start from defects found in the bay

What the handover checklist cannot do

The checklist records what was checked and who signed. It does not perform the check, certify a coach as fit for the road or meet any inspection rule an authority sets. Those duties sit with the dealership and its adviser. It replaces no technician. A dealer handing over one used trailer can use a printed sheet.

FAQ

Frequently asked questions

Can checklists differ for motorhomes and towables?

Pre-delivery checklists follow your own lists for slide-outs, roofs, gas and water systems. Each unit type can carry its own lines. A fifth wheel and a Class A are not checked the same way, and the sheet does not pretend they are.

What happens when an inspection line fails?

The failed line is noted, and a repair order is opened for the fault against the same unit. Handover waits until then. It resumes once the technician has cleared the line, and the record shows when and by whom.

Who signs the buyer’s orientation walk-through?

Your dealership decides who leads the orientation and who records it. The sign-off is stored with the unit. Keys are released only after it is on the record, so the order of events is plain to see.

Are fitted options part of the checklist?

Options sold on the deal sheet appear as lines to install and confirm. The fitter ticks each one. A hitch or awning the buyer paid for is therefore checked before handover day, not after the buyer has driven off.

Can we see which units still await inspection?

Sold units not yet signed off are counted on the units screen, so the principal sees the queue. Service advisors use the same count to book bays and technicians. Six waiting is a different day from none.

Where it fits

How this feature fits the system.

RV Dealer Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and showings

Each walk-in, rally show visitor and web form becomes a logged enquiry with the units shown, so the follow-up call has something to refer to.

Lead Management

Quotations and deal sheets

A quotation lists the unit, fitted options and accessories, keeps every revision, and turns into the deal sheet once the buyer approves it.

Quote & Proposal Management

Deposits and receipts

Deposits and stage payments are posted to the deal as they arrive, and the balance due before delivery is always visible.

Receipts Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements