Weld and Fit-up Inspection for Fabricated Frames
Weld checks and overall dimensions are recorded against the drawing before a frame leaves for the coater. The welder, the fixture and the sheet batch are named. Each fault is logged with who found it and when. An inspector signs the lot. Faults are found before the paint goes on.
Inspection seen from the weld bay and the office
A welded frame is judged at the weld bay first, then by the inspector, and finally by the owner who pays for rework. Each needs the same record from a different side. A fault should have one history.
Fields on a weld and fit-up check sheet
A check sheet should be quick to fill. It names the frame and the drawing it was built to, and then the person who made it. Room is left for a result, and for a fault if there is one. Short sheets get used, and long ones get skipped.
From weld bay to coater, one frame’s checks
A control cabinet frame comes off the fixture after welding and goes through a series of checks before it is sent out for powder coating. Each check leaves a name and a time. Paint hides faults, so none can wait for later.
Inspection settings to agree with the weld bay
Inspection works when welders trust it. Agree these points with the welders, the fitters and the inspector before the first check sheet is used. A sheet nobody believes is filled in last, or not at all.
Limits of weld and fit-up records
The inspection record shows what was checked, by whom and with what result. It does not test welds, measure parts or certify a weld procedure. Qualified people and instruments stay as they are. Weld standards, test certificates and customer approvals stay with the owner and their adviser. A shop building a few simple frames can sign a paper sheet.
Where inspection results travel next
Inspection sits between the weld bay and the coater, so it hands over in both directions. It takes frames and the sheet batch from earlier steps and passes signed lots on to coating and packing. Faults go back to the owner’s reports. Each link is listed here.
- Work centre routing moves signed frames to coating
- Outside coating tracking lists the lots sent out
- Packing lists and invoices use only passed quantities
- Nesting release supplies the sheet batch for tracing
- Scrap and rework by cause counts each logged fault
Frequently asked questions
Can a frame fail once and still ship?
One frame can be reworked and measured again, and both readings stay on the record. Once the inspector signs the lot, it can go. The fault history remains. The cause is not forgotten, and the same note shows who made the call.
Does it keep weld procedures or test certificates?
It records the weld checks you define and who signed them. Procedure papers and test certificates remain with your quality adviser and your customer’s rules. A note can refer to them. They are not produced here.
How are dimensions entered on the shop floor?
Fitters key the readings on a shop terminal beside the drawing figures. The terminal shows the frame and the fixture. A frame outside the drawing’s figure is logged as a fault, with the fitter’s name.
Can we trace a fault to one welder or fixture?
Each check carries the welder and the fixture, and each fault carries who found it and when. Reading faults by cause and work centre then shows a pattern. Use it to coach, not to blame.
What happens to faults found after coating?
They can still be logged with who found them and when. Each one is linked to the same frame. Seeing them late is the problem this feature removes. The history shows whether the earlier check missed them.
How this feature fits the system.
Sheet Metal Fabricator Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Quotation from the flat pattern
Quotes are costed from blank size, bends and weld time, with bought-in hardware added and every revision kept beside the drawing it was priced from.
Quote & Proposal ManagementSheet and remnant stock
Sheets and offcuts are held by grade, gauge and size, so a planner can pick a remnant before ordering a full sheet.
Stock Tracking and AlertsBill of materials with hardware
Each assembly lists its cut parts, fasteners, hinges and gaskets, so purchasing orders the loose items alongside the sheet.
Bill of MaterialsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements