Skip to main content
GullySystem

Weld and Fit-up Inspection for Fabricated Frames

Weld checks and overall dimensions are recorded against the drawing before a frame leaves for the coater. The welder, the fixture and the sheet batch are named. Each fault is logged with who found it and when. An inspector signs the lot. Faults are found before the paint goes on.

Inspection seen from the weld bay and the office

A welded frame is judged at the weld bay first, then by the inspector, and finally by the owner who pays for rework. Each needs the same record from a different side. A fault should have one history.

For welders signing their own frames

Welders open the frame on the shop terminal, see the fixture it is meant for and the weld checks required, and record the result. The welder’s name stays with the frame. Good work is as visible as faults.

For fitters checking overall dimensions

Fitters measure overall dimensions against the drawing, such as length, width, diagonals and hole positions, and enter the readings. A frame out of square is held back. It never reaches the coater, so nobody pays to paint it.

For inspectors signing each lot

Inspectors review the weld checks and dimensions for a lot and sign it before it leaves for the coater. A signed lot is the one that goes out. Faults are logged as they are found.

For owners reading faults by cause

Owners read faults by cause and work centre. Distortion tied to one fixture or one sheet batch shows as a pattern, not a surprise. Rework hours are then charged to a cause that can be fixed.

Fields on a weld and fit-up check sheet

A check sheet should be quick to fill. It names the frame and the drawing it was built to, and then the person who made it. Room is left for a result, and for a fault if there is one. Short sheets get used, and long ones get skipped.

Weld checks against the drawing

Each weld on the drawing that needs checking is listed with a pass or fail. The inspector sees at a glance which seams were checked, and by whom. Blank means unchecked. It is never read as a pass.

Overall dimensions and fixture used

Overall dimensions are entered as measured, next to what the drawing says. The fixture used is recorded with them. A repeat distortion on one fixture can then be traced back to it. Fixture settings can be questioned.

Welder, inspector and sheet batch

This sheet names the welder, the inspector and the sheet batch the parts came from. When a frame fails, the people and the material can be looked up. Nobody has to guess where the fault began.

Fault note with who and when

A fault is logged with a description, who found it and when. Rework or scrap follows with a cause. The note stays on the frame’s record after the fix, so the history is not rewritten.

From weld bay to coater, one frame’s checks

A control cabinet frame comes off the fixture after welding and goes through a series of checks before it is sent out for powder coating. Each check leaves a name and a time. Paint hides faults, so none can wait for later.

Welding on the fixture

The welder fits the parts into the fixture, welds the frame and records the weld checks on the shop terminal. The fixture is named on the record. The frame is then marked ready for fit-up.

Measuring the overall dimensions

A fitter measures length, width and both diagonals and enters the readings. The diagonals differ. The frame is out of square, so it is held and the fault is logged with the finder’s name and the time.

Grinding the fault and checking again

The welder corrects a distorted corner and the frame is measured again. Both readings are kept on the record. The fault stays logged, even though the frame now passes, so the cause can be studied later.

Signing the lot for the coater

The inspector reviews the checks and signs the lot. Only then is the delivery note for the coater prepared. Any frame that failed and was reworked is listed with a note beside it. Reworked frames carry their history with them.

Inspection settings to agree with the weld bay

Inspection works when welders trust it. Agree these points with the welders, the fitters and the inspector before the first check sheet is used. A sheet nobody believes is filled in last, or not at all.

Which welds and dimensions get checked

List the welds and dimensions that must be recorded for each frame family. Cover the seams that carry load or seal a joint. A long list gets skipped. A short list misses the distortion that matters.

Tolerance on overall frame size

Decide the tolerance on length, width and diagonals for each frame type, using the figure on the drawing where there is one. Write each tolerance once. An argument at the dock costs more than a line in the set-up.

Who can release a lot with a fault

Decide who may pass a lot with a known fault, such as a cosmetic weld mark the customer accepts. Name the person. State what must be noted on the record before the lot goes out.

Fixtures and welders named on records

Decide how fixtures are numbered and how each welder is identified at a shop terminal. One fixture with two names splits its faults across two records. The pattern then disappears. Pick one name for each fixture.

Limits of weld and fit-up records

The inspection record shows what was checked, by whom and with what result. It does not test welds, measure parts or certify a weld procedure. Qualified people and instruments stay as they are. Weld standards, test certificates and customer approvals stay with the owner and their adviser. A shop building a few simple frames can sign a paper sheet.

Where inspection results travel next

Inspection sits between the weld bay and the coater, so it hands over in both directions. It takes frames and the sheet batch from earlier steps and passes signed lots on to coating and packing. Faults go back to the owner’s reports. Each link is listed here.

  • Work centre routing moves signed frames to coating
  • Outside coating tracking lists the lots sent out
  • Packing lists and invoices use only passed quantities
  • Nesting release supplies the sheet batch for tracing
  • Scrap and rework by cause counts each logged fault
FAQ

Frequently asked questions

Can a frame fail once and still ship?

One frame can be reworked and measured again, and both readings stay on the record. Once the inspector signs the lot, it can go. The fault history remains. The cause is not forgotten, and the same note shows who made the call.

Does it keep weld procedures or test certificates?

It records the weld checks you define and who signed them. Procedure papers and test certificates remain with your quality adviser and your customer’s rules. A note can refer to them. They are not produced here.

How are dimensions entered on the shop floor?

Fitters key the readings on a shop terminal beside the drawing figures. The terminal shows the frame and the fixture. A frame outside the drawing’s figure is logged as a fault, with the fitter’s name.

Can we trace a fault to one welder or fixture?

Each check carries the welder and the fixture, and each fault carries who found it and when. Reading faults by cause and work centre then shows a pattern. Use it to coach, not to blame.

What happens to faults found after coating?

They can still be logged with who found them and when. Each one is linked to the same frame. Seeing them late is the problem this feature removes. The history shows whether the earlier check missed them.

Where it fits

How this feature fits the system.

Sheet Metal Fabricator Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotation from the flat pattern

Quotes are costed from blank size, bends and weld time, with bought-in hardware added and every revision kept beside the drawing it was priced from.

Quote & Proposal Management

Sheet and remnant stock

Sheets and offcuts are held by grade, gauge and size, so a planner can pick a remnant before ordering a full sheet.

Stock Tracking and Alerts

Bill of materials with hardware

Each assembly lists its cut parts, fasteners, hinges and gaskets, so purchasing orders the loose items alongside the sheet.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements