Skip to main content
GullySystem

Work Centre Routing for Sheet Metal Jobs

Each part is routed through cutting, deburring, bending, welding, grinding and finishing, and every step records the quantity passed. Planners see which work centre holds each job right now. Operators open their own queue on a shop terminal. Jobs no longer hide on the floor.

Work centre queues seen from four chairs

The same routing looks different from the laser, the weld bay and the owner’s desk. Each place sees its own jobs. Nobody walks the floor just to ask where a job is, and nobody trusts a whiteboard that went out of date.

For planners watching every work centre

Planners see which work centre holds each job right now, with the promised dispatch date beside it. A queue growing at one centre is visible. Work can be moved to another centre before a promised date is missed.

For operators opening their own queue

Operators open the queue for their work centre on a shop terminal and see waiting jobs in order, with part and revision. They record quantity passed and scrap. Then the job moves on to the next centre.

For welders and fitters on the next step

Welders and fitters see parts coming from bending before they land at the bench. A job still at deburring shows as on its way. They set the fixture meanwhile. Waiting time is put to use.

For owners reading jobs by work centre

Owners read jobs by work centre and promised date. A pile at one centre shows. The bottleneck is plain to see. Dispatch dates at risk appear before the customer rings to ask, and the owner can call first.

What a routing holds for each part

A routing is the list of steps a part must pass through, in order, with the centre that does each one. Each family gets its own route. Brackets and cabinet doors do not travel the same road, and the record should not pretend they do.

Steps in the order they run

Each step names a work centre, such as cutting, deburring, bending, welding, grinding or finishing. The order follows the route set for that product family. Brackets have fewer stops. A welded frame has more, and each one is a place to look.

Quantity passed at each step

Operators record the quantity passed at each step. A batch that enters a step full and leaves it short shows the gap at once. Scrap is entered beside it with a cause, so the loss has a name.

Rates and times for operations

Each operation on the route carries its own rate and time, whether welding, deburring, tapping or masking. The same figures feed the quotation. Actual hours are later compared with them, step by step, for each part.

Current work centre and due date

Every job record shows the work centre that holds it right now and the promised dispatch date. The location moves when a step is passed. Jobs stop disappearing between benches, and nobody has to hunt for a pallet.

One door panel across six work centres

Door panel DP-12 starts as a sheet on the laser and ends as a coated, packed frame. Between those points it spends time at six work centres. Each handover is a record. The route tells everyone where it should be next.

Cutting releases the parts

The laser finishes the nest and the cut parts are booked as passed. The job moves to deburring. Planning sees it leave cutting without a phone call to the machine, and the deburring bench sees it coming.

Deburring and the bending queue

At deburring, edges are cleaned and the quantity passed is recorded. The job then joins the press brake queue, where the operator sees it with its current revision and programme. A jam at the brake shows.

Welding and grinding on one frame

The welder opens the frame job on the shop terminal, welds to the drawing and records the quantity passed. Grinding follows on the same route. A lot held at grinding shows who has it and since when.

Finishing and the promised date

On the last steps the part goes for finishing, and the job record shows it is away or back. The promised dispatch date stays on the record. If a step slips, the planner sees the date at risk.

Routing choices to settle for each product family

A route that is too detailed gets ignored, and one that is too loose hides jobs. Start with how the floor already works. Settle each route with the planner and the work centre leads before any job is released.

Steps worth a recorded pass

Decide which steps need a recorded pass, such as bending and welding, and which fold into a neighbour. Each recorded step costs a tap at the terminal. Too few steps hide the job. Judge with the operators.

Routes for brackets, covers and frames

Give brackets, covers, cabinets and frames their own routes. A bracket may skip welding altogether. A cabinet visits every centre. Check each route with the lead of every centre it touches, before it is saved.

Who moves a job to another centre

Decide who may re-route a job to another machine or work centre when one is busy or down. Decide who is told, such as the planner and the next centre lead. Without a rule, jobs wander. Promised dates drift away from the plan.

Secondary operations as separate steps

Decide whether tapping, riveting, labelling and masking are steps of their own or part of bending and welding. A separate step costs a tap. It also gives a rate and an hour count to learn from.

Limits of routing on the shop floor

Routing shows where each job is and what step comes next. It does not schedule machines, balance loads or tell an operator how to bend or weld. Planners still decide the order of work. A step is only recorded when someone records it, so a missed entry leaves the job showing the old centre. A shop with one bench and two jobs at a time needs no board.

Routes link quotes, programmes and dispatch

Routing is the thread that holds the other features together. It takes its steps and rates from the quotation. Its queues come from the nest and the bend programme. Finished frames pass on to inspection, coating and dispatch. Other features read its status for each job.

  • Quotation from the flat pattern sets rates for each step
  • Nesting release feeds the cutting queue
  • Press brake and bend programme control fills the bending queue
  • Weld and fit-up inspection follows the welding step
  • Packing lists and invoices follow the last step passed
FAQ

Frequently asked questions

Can two jobs share one work centre queue?

A work centre holds all the jobs waiting for it in a single queue. Operators see them in the order the planner set, with part and revision. Customers’ jobs sit side by side. The planner’s order decides which comes first.

What if a part skips a step?

A route can be changed for one job, for example when a bracket needs no grinding. The planner or a lead makes the change, and the job then shows the shorter route. Your own rule says who may do it.

How do operators record a step on the floor?

On a shop terminal the operator opens the queue for the centre, picks the job and enters the quantity passed and any scrap. A barcode scanner can identify the job where the shop uses one. Next, the operator picks the following job.

How does routing show a late job?

Each job carries the promised dispatch date and the current work centre. A parked job is easy to see. The planner can then move work to another centre or call the customer early, before the date slips.

Can routes differ for repeat parts and one-offs?

Each product family gets its own route, so a repeat bracket can follow a short route and a one-off cabinet a long one. The route stays attached to the part. The next order starts there.

Where it fits

How this feature fits the system.

Sheet Metal Fabricator Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotation from the flat pattern

Quotes are costed from blank size, bends and weld time, with bought-in hardware added and every revision kept beside the drawing it was priced from.

Quote & Proposal Management

Sheet and remnant stock

Sheets and offcuts are held by grade, gauge and size, so a planner can pick a remnant before ordering a full sheet.

Stock Tracking and Alerts

Bill of materials with hardware

Each assembly lists its cut parts, fasteners, hinges and gaskets, so purchasing orders the loose items alongside the sheet.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements