Skip to main content
GullySystem

Press Brake Bend Programme Control by Revision

A bend programme, its tooling list and its bend sequence are linked to one revision of the part. The press brake queue shows the programme for the current revision only. Older programmes are locked, and an override needs a supervisor. Operators bend what the print says.

Who opens a bend programme and what stays shut

Wrong bends spoil good sheet. Everyone around the machine needs one answer: which programme belongs to the print on the bench today. Each person finds that answer in a different place, and none of them has to guess.

For programmers filing the programme

Programmers file each bend programme against the part revision it was written for, with the tooling list and the sequence. A revised part waits for its own programme. Nothing is carried over until it is linked.

For press brake operators at the queue

Operators open the press brake queue and see only the programme linked to the current revision of each job. Their tooling list tells them which punches and dies to set. The bend sequence is read in order.

For planners checking the brake queue

Planners see the jobs waiting at the press brake and whether each has a linked programme. A job without one is flagged. It is better found at the desk than at the machine, with a customer waiting.

For owners reading rework by cause

Owners read scrap and rework by cause and work centre. A lot lost to an old bend sheet shows as a revision fault, not as bad luck. The cost then sits against a named cause.

Programme, tooling and sequence kept against a revision

One bend programme file says little about when it may be used. The record ties it to a part, a revision and a set of tools, and it keeps a history of every earlier link. Operators rely on that tie.

Bend programme linked to revision

Each programme is linked to a part number and a revision letter, so the queue can match it to the job. The link shows the filing date and who filed it. A programme for revision A is not offered against revision B. Mismatches stay hidden.

Tooling list for the setup

The tooling list names the punches, dies and any special tools the programme needs, in the order of the bends. Setters read it before the job reaches the queue. A missing tool is found early.

Bend sequence and programmer notes

The sequence says which bend comes first, which edge sits against the back gauge and where the part is turned over. Notes from the programmer sit beside it. Operators read both before the first bend.

Lock status of older programmes

Once a newer revision is live, earlier programmes carry a locked status. They stay in the file for reference. An override needs a supervisor. Nobody else can put a locked programme back into the queue.

From revised print to first good bend

A customer revises a hinge bracket late in the week. By the next morning, the brake queue must show the new programme and hide the old one. Several quiet steps make that true. Each leaves a record that anyone with access can read later.

Filing the revised drawing

The estimator files revision D of the hinge bracket as the live print. The old programme was linked to revision C. It is now locked. The bracket shows in the queue with no programme to open yet.

Writing the new programme

The programmer writes a new bend programme, lists the tooling and sets the sequence. All three are linked to revision D. The job now has a programme that matches the print on the bench, and the old one stays shut.

Running the first part

At the brake, the operator sees the programme for revision D and sets the tools from the list. The first part is checked against the drawing. A bend angle that is out is logged as rework or scrap.

A supervisor overrides the lock

On a rush order, the customer asks for the older revision C bracket once more. The planner asks the supervisor. The supervisor approves the override. The locked programme runs for that lot, and the reason is written on the job.

Press brake rules to fix before programmes go in

Control only holds when the rules are plain. Agree these points with the programmer and the brake lead before the first programme is filed. Rules written later mean every locked programme gets checked again.

Supervisor override of a locked programme

Names matter here. Name who counts as a supervisor for an override, and whether a customer’s critical part needs a second approval. Decide what must be written on the job when a lot runs on an older programme.

Programmes already running on the brake

Existing bend programmes are linked to part revisions from your current lists. Decide which become live first. Each is checked against a trial part by a named person before it replaces the bend sheet at the machine.

Tooling names across the shop

Settle one name for each punch and die. The tooling list then reads the same to the programmer, the setter and the operator. A tool called two ways invites a wrong setup at the machine.

Small edits to a live programme

Decide whether a small tweak, such as a changed back gauge value, needs a new version of the programme or an edit under the same link. Pick one rule.

Limits of bend programme control

This feature decides which programme is offered and which are locked. It does not write bend programmes, drive the press brake or measure an angle. Programming software stays as it is today. Whether a programme file passes straight to the machine depends on the machine, and that is checked before any promise. A shop with one brake and one operator can keep a printed bend sheet with each job.

Bend programmes beside routing, quality and stock

Bend programme control sits in the middle of the shop. It takes the revision from the drawing, takes cut parts from the laser and passes bent parts to the weld bay. Anything that goes wrong here is logged against the same part and revision. Each link follows.

  • Drawing revision decides which programme is current
  • Nesting release hands cut parts to the brake queue
  • Work centre routing shows jobs waiting at the press brake
  • Weld and fit-up inspection receives the bent parts
  • Scrap and rework by cause records bend faults
FAQ

Frequently asked questions

Who writes the bend programme for a new part?

Your programmer does, in the software already used for it. The record then holds the programme file, the tooling list and the sequence against the revision. The system controls who may open them. It does not write programmes.

Can an old programme be kept for reference?

Locked programmes stay in the file. Anyone with access can read them next to the new one, which helps when a customer asks what changed. Only a supervisor override puts one back in the queue, and then for the lot in question.

How does an operator know which tools to set?

The list linked to the programme names the punches and dies in the order of the bends. The operator reads it at the queue before loading the first blank. A setter can read it earlier.

Does it count good parts and scrap at the brake?

Operators record the quantity passed and any scrap as work moves from sheet to frame. Scrap carries a cause, such as an angle out or a wrong flange, so rework can be read by cause and work centre. Causes are named.

What if the customer revises a part mid-batch?

The new revision becomes live. The earlier programme locks. Parts already bent stay on the job under the old revision. A supervisor decides whether the rest of the lot is finished on the old programme or held for the new one.

Where it fits

How this feature fits the system.

Sheet Metal Fabricator Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotation from the flat pattern

Quotes are costed from blank size, bends and weld time, with bought-in hardware added and every revision kept beside the drawing it was priced from.

Quote & Proposal Management

Sheet and remnant stock

Sheets and offcuts are held by grade, gauge and size, so a planner can pick a remnant before ordering a full sheet.

Stock Tracking and Alerts

Bill of materials with hardware

Each assembly lists its cut parts, fasteners, hinges and gaskets, so purchasing orders the loose items alongside the sheet.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements