Skip to main content
GullySystem

Costing Sheet Metal Parts from the Flat Pattern

A quotation starts from the flat pattern. Blank size, gauge, grade, cut length, bends, weld time and finish each carry a rate, and hardware comes in from the bill of materials. Every costing version is kept, so an estimator can see what was priced, when and why a figure changed.

Who builds, checks and reads the margin

A cabinet quote passes through several hands before the customer sees a figure. One person builds it, another checks it, and the owner wants to know what margin sits behind it. Each sees the same costing.

For estimators building the price

An estimator starts from the blank size and cut length, then adds bends, weld time, finish and each secondary operation as its own line. Hardware arrives from the bill of materials. Nothing is rolled into a lump.

For planners checking what can be cut

Planners see the grade and gauge that were priced and set them against sheets and remnants on the racks. Before a price goes out, they can note that a remnant already covers the blank. Material choices stay visible.

For programmers reading the bend count

Programmers check that the bends priced match the bends the part really needs. A count that looks light is raised before the quote leaves. Bend counts get questioned early. Press brake hours then rest on the real sequence, not a guess.

For owners reading margin by job

Owners read open quotes by customer and value, with the costing versions behind each one on file. When a job closes, quoted hours sit beside actual hours by process. The gap shows where prices should move.

The lines inside a sheet metal costing

A costing is a price built up from the part itself. Each line points back to the flat pattern, a process rate or a bought-in item. The sheet is priced first. Cutting, forming, joining and finishing are added around it, line by line.

Blank size, gauge and grade

The flat pattern gives the blank size, and gauge and grade fix the sheet rate it is priced at. Change the grade and the line moves. The material line stays apart from every process line, so each can be questioned alone.

Cut length, bends and weld time

Cut length is priced per metre, each bend at its own rate and welding by the hour, using the rates entered at set-up. Hours and quantities sit on separate lines. A long weld seam is easy to spot.

Secondary operations as named lines

Deburring, tapping, riveting, labelling and masking each carry a rate and a time. They appear on the quote as named lines. A job needing masking no longer closes with a margin nobody can explain on the next job.

Hardware, finish and costing versions

Hardware is pulled in from the bill of materials, and outside finish is added as its own line. Each pass at the price is saved as a version. Versions are never overwritten. Earlier figures remain beside the drawing revision they used.

Pricing a control cabinet from enquiry to outcome

A panel builder asks for a batch of enclosures with a hinged door, a lock and a powder coat. Pricing begins at the flat pattern. The quote is built, revised and sent, and then the order is won or lost. Each stage leaves a version behind, and nothing is overwritten.

Reading the flat pattern

An estimator opens the flat pattern for the enclosure body and reads off the blank size, cut length and bend count. Gauge and grade come from the enquiry. A first costing is saved as version one.

Adding the hinge and the lock

The assembly’s bill of materials brings in hinges, locks and gaskets with their supplier prices. A missing lock is caught now, on paper. Left alone, it would be a cabinet waiting at the fitting bench.

Revising after a customer call

The customer asks for zinc plating in place of powder coat, and a thicker door. The estimator changes grade and finish and saves version two. Version one stays. Both prices can be shown side by side.

Recording the final outcome

Once the order is won or lost, that outcome is recorded against the final version of the costing. Quoted hours are later read against actual hours for the same part. The next quote starts from real spend.

Costing choices to settle with the estimator

Rates and rules come first. Before the first costing is saved, agree what goes into the price and who signs it off. Small choices here shape the margin on every job afterwards.

Rate per metre of cut and per bend

Enter the rates you quote from today, for cut length, each bend and an hour of welding. Decide whether one rate covers every gauge or thin and thick sheet are split. Your own price list is the starting point.

When a costing version is locked

Decide at which point a version stops being edited and the next one begins, such as the moment the quote is sent. A locked version is the one the customer saw. Changes after that become version two.

Which secondary operations get a line

List the small jobs that are priced apart, such as tapping or masking, and those folded into the bend rate. Pick a rule for each. A shop that hides everything in a lump cannot tell where margin went.

Who approves a quotation before it leaves

Choose whether any estimator can send a quotation or a second person signs above a set value. The owner decides the threshold. The version list then shows which version was sent, so a question from the customer has a clear answer.

Limits of a sheet metal quotation

The quotation prices from the flat pattern and the rates you enter. Judgement stays with people. It does not set a margin, fix the rates or tell you what a customer will pay, and those choices stay with the owner. Tax treatment and contract terms go to the owner and their adviser. A repeat part with a stable price list can be quoted from a spreadsheet.

What a costing takes in and hands on

A costing sits in the middle of the shop’s paperwork. It takes in the drawing revision, the hardware list and the stock position. It hands a price to the customer and a plan to the floor. Won quotes carry their figures forward. Lost ones stay in the file.

  • Drawing revision supplies blank size and cut length
  • Bill of materials with hardware adds bought-in items
  • Sheet and remnant stock shows what covers the blank
  • Won quotes pass quoted hours to work centre routing
  • Quoted against actual hours returns to the owner’s reports
FAQ

Frequently asked questions

Does a revised drawing change an old costing?

The old costing is untouched. It keeps the drawing revision it was priced from. If the customer sends a new revision, an estimator opens a new version and compares it with the earlier one. The earlier figures stay in the file.

Can one quote cover several parts and an assembly?

Each part is costed from its own flat pattern, and the hardware for the assembly comes from the bill of materials. The quote lists them together. The customer reads the parts and the bought-in items on one sheet.

Where do the cost rates come from?

You enter them: sheet cost by grade and gauge, cost per metre of cut, per bend and per hour of welding. They are the rates you quote from now.

How do we learn whether we priced correctly?

When a job closes, quoted hours are read against actual hours by process and part. A long bend line shows up. The next quote can then use a better rate, and the estimator sees why the old one fell short.

Can a lost quotation be reopened later?

Each costing version and the final outcome are kept. A customer returning with the same drawing finds the old price and its assumptions in the file. Old prices stay on file. The estimator can start a new version from them.

Where it fits

How this feature fits the system.

Sheet Metal Fabricator Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Quotation from the flat pattern

Quotes are costed from blank size, bends and weld time, with bought-in hardware added and every revision kept beside the drawing it was priced from.

Quote & Proposal Management

Sheet and remnant stock

Sheets and offcuts are held by grade, gauge and size, so a planner can pick a remnant before ordering a full sheet.

Stock Tracking and Alerts

Bill of materials with hardware

Each assembly lists its cut parts, fasteners, hinges and gaskets, so purchasing orders the loose items alongside the sheet.

Bill of Materials
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements