Skip to main content
GullySystem

Crew Attendance and Site Logs for Solar Sites

Solar engineers and cleaning crews move from plant to plant all day, and nobody sits at a gate with a register. Each person marks presence on a phone, with the time and the location. Daily wages and visit allowances come from that record, and the owner can see who was on site.

Marking in at the plant gate

A washing crew reaches a plant at first light, and the leader marks the crew present from a phone. Time and location are stamped. The same happens at every site, so by evening the day’s presence is already written and nobody has to remember it.

The crew leader marks in

At the gate each crew member is marked present, or the leader marks the crew. The phone adds the time. The location is kept with the mark. No paper register is passed from hand to hand across the van.

An engineer moves between plants

Engineers mark in at each plant and out on leaving. Time on site is the gap between the two. Plants stay separate. Two plants in one trip show as two logs, so each owner sees only its own visit.

A local engineer on sub-contract

Asset managers sometimes send visits to local engineers they do not employ. The engineer marks in like staff. The log is then proof of the visit, with time and place, and nobody has to take a phone call as evidence.

Pay day reads the record

At pay time the accounts clerk reads days present for each person. Wages and allowances are drawn from the logs. A dispute is settled by looking at the mark. It ends quickly, and nobody argues from memory.

Presence marks and site log fields held

A site log is a short line about one person at one plant on one day. It holds who, where, when and for how long, plus what pay follows from it. Lines stay short. They add up to a clear record without anyone writing a diary.

Person, plant and date

Every mark names the person, the plant and the date. Engineers and cleaning crew members are listed alike. Filtering by plant shows who was on site that week. Filtering by person shows where each one went.

Time in and time out

A mark in and a mark out give the time on site. A forgotten mark out is visible as an open line. That is easy to spot. The supervisor can ask about it the same evening, while the day is still clear.

Location kept with the mark

The phone attaches its location to the mark. One made at the plant looks different from one made miles away. Where maps and location are connected, the supervisor can see both on a map, side by side.

Wage or allowance drawn

Daily wages and visit allowances are drawn from the days and visits in the log. Rates are the company’s own. The figure reaching the accounts clerk carries the lines it came from, so it can be checked.

Who marks in and who reads the log

The people who work at the plants write the log. Those who pay, plan and answer for them read it. Each sees a screen that shows what that job needs. Nothing more is shown.

For crew leaders marking the team

The leader opens the day’s plants on the phone and marks in at each gate. Members who arrive late are marked when they do, and the time shows it. Leaders see the crew’s own record. Nothing else is open.

For engineers on the road

An engineer marks in at the plant, works the ticket and marks out. The record shows time on site and visits made. Disputes are short. A question about an allowance is answered by the engineer’s own log.

For supervisors checking presence

Supervisors see who is at which plant now and who has not marked in. A crew running late is known before the owner calls. Open lines from yesterday are queried on the morning round. Nothing is left to memory.

For the director reading wage cost

The director reads days and visits by crew and by region, and sees what wages and allowances follow. No region sends a sheet. Productivity and cost are read from one record, and the figures agree.

Linking attendance to rounds, visits and pay

Attendance proves presence, and the other features give it meaning. Presence at a plant matches a scheduled visit or a cleaning round. Time on site then supports the ticket, the report and the pay, whichever job the person was doing that day. One mark serves them all.

  • Engineer scheduling shows who was due at each plant
  • Cleaning rounds name the crew present on the day
  • Visit reports confirm time on site for each ticket
  • Fault tickets record attend time beside the mark
  • Accounting software takes wage and allowance totals where connected

Attendance rules to agree with your crews

Marking in is a small habit that touches pay. People care about the rules. Settle them with crew leaders and supervisors before the first pay run, and write them where the crews can read them.

Marking in for the whole crew

One leader can mark every member at once, or each person can mark on a phone. The first is quick. The second is more exact. Decide which your crews use, and whether the answer differs for cleaning and repair work.

Allowance rules for longer journeys

A far plant costs more time to reach than a near one. Decide how a visit allowance relates to distance and time on site. Facts come from the record. The rate and the rule are yours to set.

Marks made far from the plant

Sometimes a mark is made when the phone is not at the gate. Decide what the supervisor does with it. Accept it, query it or mark it as unverified, and note who decides. Consistency is the point.

Late and missing marks

A phone dies or a crew forgets. Decide who may add a mark afterwards and what reason must be written. A correction should be dated and visible, and it should never replace the original silently.

What an attendance log does not settle

This record shows presence, time and place. It does not work out statutory pay, deductions or leave, and it does not decide what a crew member is owed under the law. Those belong to the owner, the accountant and an adviser. It cannot prove that work was done well, only that a person was there. A team of three people can keep a paper register.

FAQ

Frequently asked questions

What does a presence mark record besides the time?

It records the person, the plant, the date and the phone’s location. Marking out closes the line. The gap gives time on site. Nothing else about the person is collected through the mark. Only what the log needs is kept.

Can a crew leader mark the whole team at once?

That is a rule to agree at set-up. Some firms let the leader mark the team. Others ask each person to mark on a phone. Either way the log shows who was marked and by whom.

How are visit allowances drawn from the log?

Visits are listed for each person, with time on site. Your allowance rates are applied to those lines. Staff check the result. The accounts clerk receives a figure together with the lines behind it, so questions are answered at once.

Can a missed mark be added afterwards?

A missed mark can be added by those permitted by role, with a reason and a date. The correction sits beside the gap it fills. The record never pretends the mark was made on time, so later checks stay honest.

Can sub-contracted engineers mark in too?

A local engineer working for an asset manager can mark in like staff. The visit then has a time and a place on record. Access is narrow. What that person sees is limited to their own visits.

Where it fits

How this feature fits the system.

Solar Plant Maintenance Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Plant and contract register

Each plant’s contract holds its response time, visit frequency and renewal date, so every ticket and visit is judged against the right terms for that owner.

AMC and Service Contracts

Fault tickets and response clocks

A tripped inverter or a call from the owner becomes a numbered ticket with an owner, a fault class and a response clock from the contract.

Ticket Management

Engineer scheduling and visit routes

Visits are assigned by area and skill, so the supervisor sees which engineer is at which plant and which tickets are still waiting for someone free.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements