Skip to main content
GullySystem

Maintenance and contractor jobs for rental homes

Log a fault against the unit, such as a dishwasher, boiler or smart lock, and assign a contractor. The job records the quote and the cost, and says whether the owner or the guest pays. Maintenance coordinators run it, and owners see the cost on their statement.

What a repair job records against a home

Every repair job belongs to one unit. It follows the fault from the first report to the final cost, whoever raised it. Four records sit on each job. Together they answer who reported it, who fixed it and who pays.

The fault and its unit

The job names the unit, the fault and who reported it, whether a guest, an inspector or a housekeeper. A boiler, a dishwasher and a smart lock each have a job. The date is kept with the description.

The contractor assigned

One contractor is named on the job, taken from the contractor records with the trade and the units covered. A heating engineer is not sent to a lock. Without a name, the job shows as open.

The quote and the final cost

The quote is recorded before the work starts, and the cost after it ends. Both figures sit on the job. A gap between the two is visible to the coordinator, who then asks the contractor to explain it.

Who pays for the repair

Each job is charged to the owner or the guest. An owner charge goes onto the owner’s statement. A guest charge links to the stay, the inspection photographs and the deposit. The choice is made on the job.

Repair jobs through a rental week

Faults do not wait for office hours. They show how a report becomes a job and who is called. They also show where the cost lands once the work is done and the guest has gone.

A cold boiler on Friday evening

A guest messages that the boiler has stopped and the house is cold. The boiler message sits on the reservation. Staff log a job against the unit. A heating contractor is assigned before the weekend begins.

A dishwasher quote for approval

A contractor quotes for a new dishwasher pump. The quote is recorded on the job. That price is higher than the owner’s agreement allows without approval, so the job waits for the owner’s reply and shows as awaiting.

A smart lock that fails

An arriving guest cannot get in and tells the office. The fault is logged against the unit. The coordinator checks the calendar for the next arrivals in that home and sends the lock contractor first.

Damage found at an inspection

The inspector finds a broken lamp after a stay. A job is logged. It is charged to the guest, not to the owner. The stay, the photographs and the deposit are linked to it for the claim.

Who handles repair jobs and what each sees

Four roles touch a repair job, and each needs a different view. One person runs it. The manager watches the list. The owner sees only the cost that reaches the statement.

For maintenance coordinators

Read the faults reported by guests, housekeepers and inspectors, assign contractors, and record the cost against the right home. Each job shows its quote and who pays. Nothing waits in a personal inbox or on a phone.

For the operations manager

Check open repairs and see which ones await the owner’s approval. A job still open as an arrival draws closer stands out on the list. The manager decides which home gets the contractor first. The list settles the order.

For housekeepers and inspectors

Report a fault during a clean, such as a dead bulb or a leaking tap, and it becomes a job against the unit. A broken item is photographed first. Nobody has to relay the fault by phone.

For the owners of homes

Receive a monthly statement that shows each repair cost charged to the home, with the job behind it and the payout amount. Approval above the agreed limit is asked before the work starts. Nobody is asked afterwards.

Decisions to settle before repair jobs go live

Repair money belongs to owners and guests. The rules need agreeing in advance. Settle four choices with the maintenance coordinator and the operations manager. Keep each owner’s agreement in view.

Who may approve spending

Decide who may approve a repair and up to what amount. Repair approval limits follow each owner agreement, so the limit differs by home. Anything above the limit waits for the owner. Write the limits down.

Which small jobs are left out

Decide which small repairs become jobs and which stay with the housekeeper, such as a replaced bulb. A line that is too low fills the list with noise. Review the line after the first month.

How open repairs come across

Open repairs, current contractors and their rates are entered from the sheet you keep now. A few homes are checked line by line. Any repair with no named payer is settled first. The switch follows.

Which report matters first for Maintenance and contractor jobs

Start with repair jobs and costs charged to each owner, home by home. That is the page an owner asks about. Open deposits and damage claims by stay follow once the first guest charges are recorded against their stays.

How repair jobs connect to the product

Each repair job draws on guests and inspectors. It hands its cost to the folio and to the owner’s statement. These five links keep a fault from being tracked in four separate places by four separate people. That is exactly where jobs and approvals get lost.

  • Takes guest-reported faults from messages on the reservation
  • Takes inspection faults from turnover cleans and inspections
  • Reads contractor rates and units from contractor records
  • Charges owner costs onto the owner statement
  • Links guest charges to the stay and deposit

Where repair jobs and contractor work stop

This feature records the repair. It does not diagnose a fault or do the work. It does not certify a gas, electrical or safety inspection, which stays with the qualified contractor. Whether a guest owes for damage is a decision for you and your adviser. An owner with a single home and one handyman can use a notebook.

FAQ

Frequently asked questions

Can a repair job start from a guest’s message?

Yes, the message stays on the reservation, and so does the fault it reports. Staff log a job against the unit from there. The guest’s words and the contractor sit together. So does the cost.

Where does an owner’s approval sit on a job?

On the job itself, in plain view. Above the limit in the owner’s agreement, a repair shows as awaiting approval until the owner replies. Staff and the operations manager can see which jobs are held and why.

Can a quote be compared with the final cost?

Both figures are recorded on the job. They are read side by side. A repair that finishes above its quote is questioned with the contractor. Only then is the cost charged to an owner or a guest.

What happens to a repair charged to a guest?

It links to the stay, the inspection photographs and the deposit held for that guest. At check-out the claim is made against that evidence. The trail is ready. A disputed charge is answered from it.

Can one contractor serve several homes?

Yes, one record covers them. The contractor’s record lists the trade, the rates and the units covered. A plumber who looks after several cottages is one record, and each job still shows which home and which owner is charged.

Where it fits

How this feature fits the system.

Vacation Rental Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Unit calendar

Every home is held as a bookable unit, and reservations, owner blocks and open nights all appear on one calendar for the team.

Resource and Room Booking

Reservations from channels and direct

Guests book dates on your own page, and those bookings land beside channel reservations with the same guest and source fields.

Online Booking Portal

Guest messages and arrival pack

The confirmation, door code, house rules and check-out reminder go out from the reservation by message or email at set points.

WhatsApp, SMS and Email Notifications
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements