Skip to main content
GullySystem

Pump Installation and Service Calls for Borehole Firms

A submersible pump, its rising main and its cable are quoted and billed as lines on the drilling job, or as a job of their own. Later repairs and flushing visits are logged against the same well. The history of the pump stays with the borehole.

Who fits the pump and who answers the call

Fitting follows the water test, and the well is called back to later. An estimator quotes the pump, the crew fits it and the office bills it. Everyone starts from the borehole.

For estimators pricing a pump

Estimators choose a pump, the rising main length and the cable from the rate list, reading final depth and static level from the completion record. The lines sit on the drilling quotation or a second one. The customer picks the option.

For drillers fitting the pump

The crew opens the borehole, reads the final depth and casing, and lowers the pump on the rising main. The fitted items are entered against the well. A later visit starts from that record, not from memory.

For owners watching pump work

Owners see pump work as its own stream: pumps fitted, repair calls asked for and balances owed on them. Whether pump work earns its keep is read from bills, not from memory. Pumps get lines of their own.

For the office and accounts handling calls

Office staff log each call against the well: who rang, the fault, the visit made and the repair done. Accounts bill the repair as its own job and chase what is owed. The well keeps a running history.

Pump lines and repair entries kept for a well

The pump belongs to the well. It is not a separate sale. Its lines, the date it was fitted and each later repair are kept with the borehole. A customer ringing later is answered from the file, not from a search through old papers.

Pump, rising main and cable

A submersible pump is entered with its make and model, the length of rising main and the cable run, each priced from the rate list. These three lines can be listed together or apart. Customers see what was fitted.

Pump position on the job

The pump can be a line on the drilling job or a second job opened for it. Which one you choose changes the bill, not the record. Both keep the pump tied to the same borehole. The borehole stays the same.

Repair and flushing visits

Each later call is logged against the well: date, fault reported, work done and the person who went. A flushing visit is recorded the same way as a repair. Calls appear in date order. A flushing visit is a call too.

Parts and charges on each call

Parts used and labour charged go on the call, so a repair has its own bill, apart from the drilling bill. A customer asking why a charge appeared can be shown the entry. Each call is billed apart.

From a tested well to a working pump

The yield test is done and the customer wants water in a tank. One pump is chosen, quoted, fitted and billed against the well. Later the pump fails, a farmer rings, and the same file is opened again. The history is already there.

Choosing a pump from the test

An estimator reads the test sheet beside the final depth and picks a pump, rising main and cable. The quotation goes to the customer as an option on the drilling job, or as a second one. Prices come from the rate list.

Fitting day at the well

The crew lowers the pump and enters what was fitted against the borehole job: the pump, and the lengths of rising main and cable. The store notes the items issued. The bill gains its pump lines.

A complaint of low flow

A farmer rings to say the flow has dropped. Office staff open the well, read the pump fitted and the original test readings, and book a visit. The visit is logged as a call. Past readings show what has changed.

Flushing visit and repair bill

A visit to flush the well is done and logged. The repair, if any, is billed as its own job and listed with the customer’s dues. Drilling and pump work do not blur on the bill. Two kinds of work stay apart.

Pump pricing and call rules to settle

Fitting a pump can ride on the drilling job or stand alone, and each way suits a different customer. Before the first pump is quoted, the firm decides how it is priced, who answers calls and what a repair history keeps. Settle them before quoting.

Pump on the job or on its own

Decide whether a pump is added to the drilling job or opened as a second job. A second job suits a customer who buys later or pays separately. One job suits a single bill. Choose a default for the estimators.

Which pump items sit on the rate list

List the pumps, rising main sizes and cable you supply, with prices. Decide who may add an item and who approves its price. Unlisted items are typed in on the quotation. The list should cover what you sell.

What a service call records

Decide which fields a call must carry: who rang, the fault, the visit date, the work done and whether it is billed. A call with no fault noted is hard to bill later. Settle the list with the office.

Older wells and the pumps fitted to them

Wells and pumps fitted before the system started come across only where the customer still calls. Enter the pump against the borehole, with whatever is known of its make, when the first call arrives. Past bills stay in your files.

Pump work beyond what the record holds

The file records what was fitted, called and billed. It does not size a pump. It cannot design a rising main or diagnose a fault in the borehole. Technical advice, warranty terms with the pump maker and any electrical work stay with the crew, the maker and a qualified electrician. A firm that only drills can skip this part.

Pump lines that join the job and the bill

Pump work reuses the well’s own record. Final depth, static level and casing come from the completion report, prices from the rate list. The lines go onto the same bill as the drilling or onto a bill of their own, and later calls reopen the same borehole.

  • Final depth and readings come from yield tests and completion reports
  • Pump prices are read from the quotation rate list
  • Pump lines join the bill under billing by metre and item
  • Visits to the well are placed on the crew schedule
  • The customer record shows pump work next to drilling
FAQ

Frequently asked questions

Can a pump be quoted before drilling is done?

A quotation can offer a pump as an option, or a separate quotation can follow once the yield test is on record. The customer can accept the drilling and leave the pump for later. The choice sits with the customer.

Where are repair visits to an old well kept?

Each visit is a call logged against the well, with date, fault, work done and charge. Open the borehole and read them. The calls list in date order, and the pump fitted stays visible beside them.

Can a service call be billed on its own?

A call can become its own job and bill. Labour and parts are its lines. It then appears under the customer’s dues like any bill. The call stays in the history even when the bill is paid.

Does it record which pump is fitted in each well?

The pump, rising main and cable fitted are entered against the borehole, with their make, model and lengths. A repair call then starts from what was fitted. Entries are made on site. The record is only as good as those entries.

Can a customer be shown the repair history?

It can be read from the borehole record and given to a customer who asks. It lists each call with its date, fault and the work done, and the pump fitted at the time. You choose what is handed over.

Where it fits

How this feature fits the system.

Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.

Lead Management

Quotations by metre and item

A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.

Estimate/Quotation Management

Rig and crew schedule

Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements