Rig and Crew Scheduling for Borehole Firms

With two or more rigs on different sites, the office needs one board. Each rig, driller and helper is assigned to a borehole job, and mobilisation days and travel are counted. The schedule shows which rig is free next when another customer says yes to a quotation.

Who reads the rig board and why

Rigs sit on different sites, and crews travel between them. The owner wants rigs working, the office moves them, and the driller needs to know where the next job is. Everyone reads the same board.

For owners counting idle rigs

Owners see which rigs are on site, which are travelling and which are waiting, with rig downtime beside metres drilled. Parked rigs stand out. That date helps the owner decide whether to accept another quotation.

For drillers learning the next site

On a phone, the driller reads the next borehole, the mobilisation day and who rides with the rig. Days on the road are marked. A change made in the office shows there. No call is needed to find the gate.

For store keepers loading before mobilisation

Store keepers read the mobilisation day for each rig and load casing, pipe and bits to match. Tomorrow’s departure gets its issue slip today. Seeing the date early saves a second trip to the yard.

For the drilling office moving crews

Placing a rig, a driller and helpers on a job, setting the mobilisation day and adding travel all happen here. Anyone placed twice is easy to see. Accounts read the days later for wages, from the same entries.

What the rig board holds for each placement

Every placement ties a rig, a crew and a borehole job to dates. Beside each one sit the travel and set-up days, because a rig on the road earns nothing. Time on the road is real time. The schedule is only as honest as these entries.

Rig and carrier assigned

A placement names the rig, its compressor and the carrier truck that moves it, against one borehole job on one site. A rig with no placement is free. Free rigs are read from these placements.

Driller and helpers placed

Each rig has a named driller, with the helpers who ride along. A substitution, such as a helper on leave, is changed on the placement itself. Wages are later totalled from these names. Names matter for wages.

Mobilisation days and travel

The day a rig leaves, the travel to site and the day drilling can begin are recorded separately. A long haul between two plots is counted. The road is part of what a job costs, and wages follow them.

Planned finish and next free date

An expected finish sits on every placement, and the next free date for each rig is read from it. When a well runs past its date, the finish is moved and the next job shifts with it. The date is a plan.

A week on the rig board

Monday sets the plan. The office looks at which rigs are finishing and which accepted jobs are waiting for one. Placements are made, a driller is swapped when someone is away, and the board shows the next moves for each rig.

Monday: matching a job to a rig

An accepted quotation sits in the queue. It is placed on the rig that frees up first, with a crew and a mobilisation day. The customer is then told a date. That date comes from the board.

Wednesday: a driller falls sick

One driller is away sick. Staff swap in another, and the placement shows the change. The crew list for the site follows the swap, and so do the wage days later. The swap is on the board that morning.

Thursday: a well runs past its date

The log shows a well still drilling past the planned finish. The finish date is moved, and the next job’s mobilisation shifts with it. The customer waiting for that rig is called. Another job shifts too.

Friday: the haul to a far site

One rig must travel to a distant plot. The days to get there are placed on the board, so the rig shows as busy while it moves. The owner sees the haul as part of the cost, not as a gap in the diary.

Choosing how rigs and crews are placed

A schedule works when everyone agrees what a placement means. The firm settles how crews are named, how travel is counted and who may move a rig. These choices are made once.

Rigs as units or rig and crew pairs

Decide whether the board treats a rig and its regular crew as one unit, or places drillers and helpers separately. Fixed pairs are quick to read. Separate placement copes better with leave and with a helper swapped at short notice.

How travel days are counted

Agree whether travel is a separate placement or part of mobilisation, and who counts a half day on the road. Wages and fuel later read these days. Pick one counting method and apply it to every site.

Who may shift a mobilisation day

Agree who may move a mobilisation day once the customer has been told: the office, the owner or a senior driller. Each move carries a reason. Customers ask about changes, and the reason answers them.

Rigs and crews already out on sites

Rigs already on site on the day of change come across with their crews, job and expected finish. Decide which placements are keyed in first, and who checks them against the notebook the office keeps today. Check each one once.

What the schedule cannot do for the owner

What the board shows is the plan and what changed. It does not drive a rig. It cannot forecast the weather or know when a hole will strike hard rock. Service dates, permits and the customer’s own readiness shape the plan, and judging them stays with the owner and the office. A firm with one rig can run on a diary.

Placements that feed jobs, wages and fuel

Dates flow in from the borehole job and out to the records that follow. Crew placements become the days that wages are totalled from. Rig placements frame the fuel and service hours charged later, and the store loads against the mobilisation day. The board holds no figures of its own.

  • Mobilisation dates are read from the borehole job
  • Crew placements give the days for crew attendance and advances
  • Service due dates from rig maintenance affect which rig is free
  • Depth reached in the daily drilling log moves finish dates
  • Store issues are timed to each rig’s mobilisation day
FAQ

Frequently asked questions

Can I see which rig is free next?

An expected finish sits on each placement, and the next free date for every rig is read from it. When the finish moves, the date moves too. Service dates are checked by the office before a rig is promised.

Can a driller be moved between rigs?

A driller can be placed on a different rig or job for any set of days. The change is made on the placement. The crew list for the site follows it. Wages for those days stay with the borehole worked.

How are travel days to a site recorded?

Road days are entered with the mobilisation day, so they sit beside the days drilling on the same job. Wages and costs for the trip are read with the job. A road day counts like any other.

Does the schedule stop a double booking?

Anyone or any rig placed twice on the same days stands out on the board, and the office decides what to change. Nothing is moved by itself. That choice stays with a person who knows the customers.

Do drillers see the schedule on a phone?

Drillers open the day’s borehole on a phone. The next placement can be read from the same record. On a remote site the phone keeps entries until a signal returns. Ask for the screens you want in the first workshop.

Where it fits

How this feature fits the system.

Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.

Lead Management

Quotations by metre and item

A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.

Estimate/Quotation Management

Rig and crew schedule

Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.