Skip to main content
GullySystem

Casing, Pipe and Bit Stock for Well Drillers

Casing, drill pipe, bits, hammers and grout are received into the yard and issued against a borehole job. Before another rig leaves, the store keeper sees what the yard holds by size and length. Stock already out on other sites is visible too, and so is anything below its set level.

Who touches the yard stock and who asks

The yard is busy when rigs are loaded and quiet when they are away. Drillers ask for casing and bits, the store keeper issues them, and the owner wants to know what is sitting in the yard. Each request names a borehole.

For store keepers issuing by job

Store keepers receive casing and consumables, then issue them against a borehole job in lengths. Pipe coming back from a finished site is booked in again. Stock counts follow each movement. Returns are booked the same day.

For drillers asking for casing and bits

A driller requests casing sizes, bits or a hammer from the phone. The request names the borehole. Before the truck is loaded, the store keeper sees it. A short supply is known while the rig is still in the yard.

For owners watching stock levels

Owners read casing and drill pipe issued borehole by borehole, and the yard against the level set for each size. A size running low is flagged before it stops a rig.

For the office and accounts costing wells

Office staff read what each well took from the yard when the bill is raised. Casing left in the hole is charged as an item. Accounts match purchases received against supplier bills. Stock feeds both.

Stock the yard keeps, size by size

Casing, drill pipe, bits, hammers and grout are not alike, so each is kept its own way. Casing and pipe are counted by size and length, bits and hammers one by one, grout by quantity.

Casing by size and length

Each casing size is held as a stock line with its lengths, such as 165 mm pipe in joints. Counts rise when a delivery is received. It falls when a length is issued to a borehole job. Sizes sit on separate lines.

Drill pipe and its returns

Drill pipe goes out to a site and comes back when the borehole is done. Each issue and each return is booked against the job. What did not return is easy to see. A lost length is a cost.

Bits, hammers and grout

Bits and hammers are issued one by one with the borehole they went to. Grout and other consumables are issued by quantity. Each line has its own reorder level, and below it the line is flagged.

Casing fitted and casing left over

When casing is set in the hole, its length is recorded as fitted and charged to the borehole. What remains returns to the yard and rejoins the stock. The completion report reads the fitted figure. Only the remainder returns.

A day in the yard before the rigs leave

At first light the trucks are loaded. Staff read what the next site needs, check it against the yard and issue it to the borehole. Whatever falls short is known before the rig moves, not on the track. The check comes first.

Loading for a new site

A rig is booked for a site where the quotation assumed 165 mm casing. Stock follows the quotation. Casing, grout and spare bits are issued to that job by the store keeper. The sums show what remains in the yard for other wells.

A driller phones for more casing

The driller finds the hole needs one more length of casing and asks on the phone. On the borehole record, the store keeper sees the request and sends it. Extra casing is charged to that well.

Pipe coming home from a finished site

A crew returns from a completed borehole with drill pipe and unused bits. Back at the yard, they are booked in against the job and any damage is noted. Casing left in the hole is not returned. It stays recorded as fitted.

A delivery from the supplier

A load of casing arrives from the supplier. Sizes are checked against the purchase by the store keeper and received, and the count rises. Accounts match the supplier’s bill to the receipt later. Receipt comes before the bill.

Casing sizes and reorder levels to settle

A store count is only trusted when staff agree what it counts. Before the first receipt is keyed in, the firm settles which sizes are stocked, which levels raise a flag and who signs a return. These are practical choices.

Which casing sizes get a stock line

List the casing sizes you really stock and the length of a joint. A size bought for one job only can be entered as an item on that job, so it does not clutter the list. Fewer lines mean cleaner counts.

Reorder level for each size

Set the level at which a size is flagged, based on how long a delivery takes you to get. A level set too low flags after the rig is stuck. A level set too high flags every day. Set it from experience.

Who signs for a returned bit or pipe

Agree who accepts drill pipe and bits back from a finished site, and who decides that a damaged length is written off. Store keeper and owner may share the decision. A damaged bit still costs the job something.

Counting the yard at changeover

Count the yard once before the first entry. Casing, pipe and bits are keyed in by size from that count, and open purchases are added. Then every later change goes through a receipt or an issue.

When the yard and the screen disagree

Receipts, issues and returns are what the store holds. It does not buy casing. Pricing a delivery and choosing a diameter are outside it. Purchasing and supplier terms stay with the owner, and stock values in the books are the accountant’s matter. A yard with one rig and a small stock can keep a stock book.

Where store issues reach wells and bills

Every issue is tied to a borehole job, so the store talks to the records around it. It takes casing assumptions from the quotation and depth reached from the log. Casing fitted and consumables go on to the bill and the completion report.

  • Casing sizes in the quotation show what to load
  • Casing fitted is billed under billing by metre and item
  • Bit and hammer hours arrive from the daily drilling log
  • Issues to rigs are timed by the rig and crew schedule
  • Casing fitted and final depth appear in the completion report
FAQ

Frequently asked questions

How does the yard show a size running low?

You set the level for each line. When the count falls below it, the line is flagged to the store keeper and the owner. The flag appears before the next rig is loaded, so the store keeper can reorder in time.

What happens to casing left in the hole?

It is recorded as casing fitted against the borehole and charged on the bill. It leaves the stock for good. Only the unused remainder goes back into the yard count. Fitted casing appears in the completion report.

Can a driller request pipe from the phone?

The driller names the borehole and the item, and the store keeper sees the request before loading. The issue is booked to the job. A request is not stock out of the yard until it is issued.

Are bits and hammers counted the same way?

Bits and hammers are issued one at a time, with the borehole they went to. Casing goes out in lengths. Grout goes out by quantity. Hours run on a bit or hammer come from the drilling log.

Does the store record supplier purchases?

Receipts are recorded when goods arrive: what came, in which size and length. Supplier bills, payments and stock values are for the accountant to handle in the accounts. An accounting package export carries the receipts across.

Where it fits

How this feature fits the system.

Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.

Lead Management

Quotations by metre and item

A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.

Estimate/Quotation Management

Rig and crew schedule

Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements