Daily Drilling Log for Water Well Rigs
The pencil sheet in the cab becomes a record for the borehole. At shift end the driller stands at the rig with a phone or tablet. Depth reached, formation met, water strikes, bit used, hammer hours and hole diameter go in. The office, the store and the bill all read it.
Who writes the log and who reads it
Drillers write the log at the rig, and others read it before the day is out. The office wants depth for the bill, the store wants bit hours, and the owner wants progress. Everyone reads the same entry.
Entries a shift leaves in the log
Each shift adds one block of entries to the borehole. They are short on purpose. A driller is typing at the rig with a phone, not sitting at a desk. Log columns follow the forms your customers and permit offices ask to see.
From the first run to the shift-end entry
Drilling starts in the morning with the compressor warming and the driller opening the day’s borehole on a phone. Runs are entered as they happen, or all at once when the rods stop. A shift ends with a full entry.
Fixing log columns before the first shift
A log is useful when every driller fills it the same way. Before the rigs start, the firm settles the columns, the units and who may correct an entry. Changes can be made later, by request.
Limits of a log kept on a phone
The log records what the driller enters. It does not read the rig. It does not measure depth itself, take a signal from a sensor or judge what rock has been met. Geological interpretation and the call to stop drilling stay with the driller, the surveyor and the owner. A firm that logs a few wells can keep a notebook.
Log entries that reach the bill and the store
The log is written every shift. Depth and formation go to the bill. Bit and hammer hours go to the store and the service plan. Final readings from the yield test go into the completion report, with the casing details. Each shift adds to all of them at once.
- Metres by formation feed billing by metre and item
- Bit and hammer hours reach the casing, pipe and bit store
- Hammer hours also reach rig maintenance and fuel
- Depth reached moves finish dates on the rig and crew schedule
- Final depth and strikes appear in the completion report
Frequently asked questions
Can a driller fill in the log offline?
On a remote site without coverage, the phone keeps the entries and sends them when the crew reaches a signal. Entries need no retyping at the office. The shift is complete when the last run is entered.
Can log columns match the form our customer wants?
Log columns, core or sample fields and test sheets follow the forms your customers and permit offices ask to see. Staff at GullySystem alter fields when you ask. A new form for a new customer is added on request.
Can the log be corrected after shift end?
By whoever you allow. Later edits are shown, so a changed depth is not hidden. Agree the rule for depth changes at set-up, because the bill reads the corrected figure and the customer may ask about it.
Is the log used to bill the customer?
Metres and formation come from the log, priced from the accepted quotation. Quoted depth sits beside drilled depth. Check the two depths before the bill leaves. The customer can be shown what lay below, run by run.
Does a driller need special equipment?
Keying happens standing at the rig. Nothing is fitted to the rig itself. The screens, columns and units are set up in the first workshop with your crews and your office.
How this feature fits the system.
Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and site surveys
Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.
Lead ManagementQuotations by metre and item
A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.
Estimate/Quotation ManagementRig and crew schedule
Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements