Yield Test Sheets and Borehole Completion Reports
After development the crew runs a yield test. Static level, pumping level and flow readings are stored with final depth and casing details. The completion report is printed from the borehole job, in the layout your customer or permit office expects. Nothing is rebuilt from loose sheets.
Who fills the sheet and who gets the report
Drillers run the test. Staff print the report, and the customer or a permit office reads it. Between them sits a sheet of readings that everyone relies on. Until the test is on the record, a well is not complete.
Readings and details a completion report holds
A completion report is only as good as the figures behind it. The job keeps the test readings, the final depth and what was left in the ground. Each figure is entered once, by the person who has it. Printing replaces rebuilding from loose papers.
From development to a printed completion report
Drilling ends, then testing begins. Drillers develop the well, run the yield test and key readings at the wellhead. Back at the office the job moves to tested and the report is printed in the layout the customer asked for. Each well waits for its test.
Yield sheet choices before the first well
A yield sheet is a form the customer and the permit office will judge. Before the first test is keyed in, the firm settles what the sheet holds, who signs it off and what happens to a bad reading. Each is a short conversation.
What a completion report cannot certify
Only what was recorded is printed. It does not interpret the yield, certify water quality or promise that a well will keep its flow. Hydrogeological opinion, laboratory testing of the water and any sign-off for the permit office stay with the surveyor, the owner and the authority. A firm with a few wells can type the report in a document.
Where the report draws from and goes to
The completion report is the last page of the borehole file. Depth reached and strikes come from the daily drilling log, casing fitted from the store and permit numbers from the job. Once printed, it sits ready for the final bill and for any later service call. It is the last page of the file.
- Final depth and water strikes arrive from the daily drilling log
- Casing fitted comes from the casing, pipe and bit store
- Permit numbers are read from borehole jobs and permits
- A printed report supports billing by metre and item
- Later pump installation and service calls open this report
Frequently asked questions
Can the yield sheet match our permit office form?
Test sheets follow the forms your customers and permit offices ask to see. Staff at GullySystem set up the columns during implementation. Send them a sample form. Sample completion reports show them your layout, and the form is set up once.
What if the yield test has not been done yet?
The borehole stays on the list of wells awaiting a yield test. The report has to wait. It is printed once the readings are stored. Staff can still see final depth and casing on the job in the meantime.
Can a report be reprinted after a correction?
Print again from the job. Corrections to depth or casing are made on the job first, with the reason noted, and the new print reads the corrected figure. Keep the earlier copy marked as superseded.
Are test readings entered at the wellhead?
Drillers can key readings on a phone or tablet while the test runs. Without a signal, the phone holds them. The office sees the sheet fill once the crew reaches coverage, and nothing needs keying again.
Can the report show casing and final depth?
Depth reached comes from the drilling log and casing fitted from the store record, so the report carries the figures the crew actually recorded. What is printed is what was recorded.
How this feature fits the system.
Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and site surveys
Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.
Lead ManagementQuotations by metre and item
A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.
Estimate/Quotation ManagementRig and crew schedule
Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements