Skip to main content
GullySystem

Yield Test Sheets and Borehole Completion Reports

After development the crew runs a yield test. Static level, pumping level and flow readings are stored with final depth and casing details. The completion report is printed from the borehole job, in the layout your customer or permit office expects. Nothing is rebuilt from loose sheets.

Who fills the sheet and who gets the report

Drillers run the test. Staff print the report, and the customer or a permit office reads it. Between them sits a sheet of readings that everyone relies on. Until the test is on the record, a well is not complete.

For drillers running the test

Drillers enter the static level before pumping starts, then the pumping level and flow at each reading, on a phone at the wellhead. A gap in the readings is easy to see.

For owners holding back unfinished wells

Owners see boreholes awaiting a yield test before the completion report, and the reports due. A drilled but untested well stays on that list until its readings are keyed in. The owner decides whether the bill waits too.

For estimators reading results

Estimators compare static level and flow at completion with what the survey and the quotation assumed. The result feeds the next quotation near that plot. Surveyors read the same sheet for neighbouring plots. Results teach the next quotation.

For the office printing the report

Office staff open the borehole job, check final depth, casing and test readings, then print the completion report from it. The same report goes to the customer or the permit office. The layout is already set.

Readings and details a completion report holds

A completion report is only as good as the figures behind it. The job keeps the test readings, the final depth and what was left in the ground. Each figure is entered once, by the person who has it. Printing replaces rebuilding from loose papers.

Static and pumping levels

Static level before pumping and the pumping level reached are recorded in metres, measured from the point your form names. The drop between them is read from the two entries. Both carry the test date and time.

Flow readings through the test

Flow is read at set points through the test and stored in order, with the time and any note on how clear the water ran. Your yield sheet sets the columns. A rising or falling trend can be read down the rows.

Final depth and water strikes

The figure the log reached is the final depth, with the strikes noted on the way down. Both come from the drilling log. A depth typed again on the report is a depth open to error. Nobody retypes the depth.

Casing left in the hole

Casing sizes and lengths left in the ground are recorded as fitted, with any other fitting that your form lists. The store’s fitted figure and the report’s figure match because they are the same entry. They are the same entry.

From development to a printed completion report

Drilling ends, then testing begins. Drillers develop the well, run the yield test and key readings at the wellhead. Back at the office the job moves to tested and the report is printed in the layout the customer asked for. Each well waits for its test.

Developing the well

After the final run, the crew develops the well until the water clears. The driller notes the date and the development work done. The job’s stage then moves. The owner’s list shows the well as awaiting a test.

Taking readings at the wellhead

With the test pump in, the driller enters the static level, starts the test and keys each flow and pumping level reading on a phone. A reading missed stands out as a gap. It can be taken again.

The customer asks for the report

A customer rings to ask for the papers on a finished well. Office staff open the job and see final depth, casing and test readings together, then print the report from that record. The customer is sent a copy.

The permit office asks for its form

A permit office wants its own layout. The layout is set up once from a sample form that the permit office supplied, and the same readings fill it. A second layout for another office is added on request.

Yield sheet choices before the first well

A yield sheet is a form the customer and the permit office will judge. Before the first test is keyed in, the firm settles what the sheet holds, who signs it off and what happens to a bad reading. Each is a short conversation.

Which test readings the sheet asks for

Agree the columns on the yield sheet: static level, pumping level, flow, time and water clarity. Copy them from the form your permit office accepts. A column nobody fills is dropped. A missing column is added on request.

Test length and reading points

Decide how long a test runs and when readings are taken, as your customers and permit office expect, and who keys them in. The record stores whatever you decide. The reading points are yours to set, not the system’s.

Who signs off a completion report

Agree who checks final depth, casing and test readings before a report is printed: the office, the owner or the chief driller. A report that went out in error needs a reissue. Name the checker.

Reports for wells already finished

Wells finished before the change have reports on paper. Decide which are keyed in for customers who ask again, and which stay in a folder. New wells start on the printed form from the first test. Paper reports can stay in the folder.

What a completion report cannot certify

Only what was recorded is printed. It does not interpret the yield, certify water quality or promise that a well will keep its flow. Hydrogeological opinion, laboratory testing of the water and any sign-off for the permit office stay with the surveyor, the owner and the authority. A firm with a few wells can type the report in a document.

Where the report draws from and goes to

The completion report is the last page of the borehole file. Depth reached and strikes come from the daily drilling log, casing fitted from the store and permit numbers from the job. Once printed, it sits ready for the final bill and for any later service call. It is the last page of the file.

  • Final depth and water strikes arrive from the daily drilling log
  • Casing fitted comes from the casing, pipe and bit store
  • Permit numbers are read from borehole jobs and permits
  • A printed report supports billing by metre and item
  • Later pump installation and service calls open this report
FAQ

Frequently asked questions

Can the yield sheet match our permit office form?

Test sheets follow the forms your customers and permit offices ask to see. Staff at GullySystem set up the columns during implementation. Send them a sample form. Sample completion reports show them your layout, and the form is set up once.

What if the yield test has not been done yet?

The borehole stays on the list of wells awaiting a yield test. The report has to wait. It is printed once the readings are stored. Staff can still see final depth and casing on the job in the meantime.

Can a report be reprinted after a correction?

Print again from the job. Corrections to depth or casing are made on the job first, with the reason noted, and the new print reads the corrected figure. Keep the earlier copy marked as superseded.

Are test readings entered at the wellhead?

Drillers can key readings on a phone or tablet while the test runs. Without a signal, the phone holds them. The office sees the sheet fill once the crew reaches coverage, and nothing needs keying again.

Can the report show casing and final depth?

Depth reached comes from the drilling log and casing fitted from the store record, so the report carries the figures the crew actually recorded. What is printed is what was recorded.

Where it fits

How this feature fits the system.

Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.

Lead Management

Quotations by metre and item

A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.

Estimate/Quotation Management

Rig and crew schedule

Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements