Crew Attendance, Advances and Wages by Borehole
Each driller and helper is marked present for the days worked on site. Advances and food allowance are tracked against each person, and the crew’s wages are totalled by borehole. A well then carries its own labour cost beside its fuel, casing and bits, and the owner reads it.
Who marks the day and who pays the crew
Crews work away from the yard for days, and attendance has to travel back with them. The day is marked on site, the office reads it, and the owner sees what each well cost in labour. Each day is marked on site.
Crew entries behind each borehole’s wage total
Each person on the crew has a record of where and when they worked. Days, advances and food allowance are entered against the borehole, so the wage total for a well is a sum of lines, not an estimate. Each line names a borehole.
Following a crew through a drilling stint
The rig leaves for a site with a driller and helpers. Each evening the day is marked. An advance asked for at the start of the stint is on the record. When the crew returns, the office has what it needs. Totals are ready on return.
Attendance rules to settle before the first stint
A wage total is only as fair as the rules behind it. Before crews start marking days, the firm settles what counts as a day, how advances are recovered and who may correct a mark. These are matters of trust.
Where crew records stop and payroll begins
The record keeps days, advances and allowances and totals them by well. It does not pay anyone. Nor does it set a wage law, work out statutory deductions or file a return. Pay rates, deductions and filing are for the owner, the accountant and the rules where you work. A crew of one or two can run on a wage book.
Wage totals that join borehole cost
Crew names come from the schedule. Attendance takes them from the rig and crew placements and sends wage totals by borehole to the cost view the owner reads. Fuel, casing and wages then sit together for each well, and accounts take the same totals out to accounting software.
- Crew names and site dates come from the rig and crew schedule
- Wage totals sit beside fuel from rig maintenance and fuel
- Casing and bit cost from the store sit on the same well
- Owners compare labour cost with what billing by metre and item brings
- Wage totals export to the accounting package for the accountant
Frequently asked questions
Can attendance be marked on a phone at the site?
Drillers mark days for themselves and the helpers on a phone at the rig. Marks are kept until a signal returns. The office reads them back at the yard, and nobody copies a paper sheet into the system.
How are advances set off against wages?
Advances sit beside the days worked. The office can set them off in full or in part. The balance still owed stays visible on the person’s page.
Can wages be seen for one borehole?
Days worked at a borehole, with food allowance, are totalled for that well, so labour cost sits beside diesel and casing. Crews that moved between wells appear under each one they worked. Each well shows its own total.
Can food allowance be tracked for each day?
Food allowance is recorded for each person and each day spent away from the yard, at the rate you set. It is totalled with wages for the borehole, so the labour cost is complete. Rates are changed on request.
What happens when a helper leaves mid-job?
The helper’s marks up to the last day stay on the record against that borehole, and any advance still owed stays visible. A replacement is placed on the schedule from the next day. Nothing already marked is lost.
How this feature fits the system.
Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and site surveys
Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.
Lead ManagementQuotations by metre and item
A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.
Estimate/Quotation ManagementRig and crew schedule
Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements