Quotations by Metre and Item for Drillers

A well is priced by the metre, formation by formation, with casing, development and a pump added from the firm’s own rate list. The estimator keeps every revision, the customer accepts, revises or drops the quotation, and an accepted one becomes the borehole job without retyping.

Who prices the hole and who answers for it

A quotation passes from the estimator to the owner and on to the customer. Each reads a different line. Depth is the one all three check, because the rock may not agree with a guess taken from nearby wells.

For owners reading won and lost quotes

Owners see quotations won, lost and still open, with quoted depth beside depth drilled. Wells that ran far past the quote show up in that comparison, whichever rig drilled them. Whether rates move is the owner’s call.

For estimators building the price

Estimators pick formations, enter assumed metres for each, then add casing sizes, development and a pump from the rate list. Calls to the customer are followed until a yes or a no.

For store keepers reading casing assumptions

Store keepers read the casing sizes and lengths that an accepted quotation assumes, so the yard can see what will be asked for. Issues start once the job exists. Until acceptance, it is only a forecast.

For the office and accounts after a yes

Office staff turn an accepted quotation into a borehole job and pass its rates on to the bill. Accounts compare quoted and billed rates. A revision that the customer never saw is easy to spot.

Rate lines behind a drilling quotation

A drilling quotation is a stack of lines, each priced from the firm’s own rate list. It keeps the formation, the metres assumed, the extras and the version, so that any later dispute can be read line by line. Each line stands alone.

Formation and rate per metre

Soft soil, weathered rock and hard rock each carry their own rate per metre, taken from your rate list. Assumed metres are entered against each formation. Quoted depth is the sum. The rock may change the split.

Casing, development and pump lines

Casing by size and length, development work, and a pump with rising main and cable are added as item lines. Each draws its price from the rate list. A customer can strike out the pump and keep the rest.

Revisions and their reasons for Quotations by Metre and Item

Every revision is kept as its own version, with the date and a note on why it changed. Reasons might be a deeper assumption, a different casing size or a dropped pump. Earlier versions stay readable beside the new one.

Status and the customer’s answer

Each quotation shows whether it is open, accepted, revised or dropped, with the date of the customer’s answer. Accepted ones are marked ready to become a job. Lost ones keep their reason. The won and lost list reads from these.

A quotation from site notes to a yes

An estimator sits down with the survey notes and the rate list. A first draft goes out, the customer asks about casing, and a revision follows. Each lap is kept. The loop ends when the customer says yes or drops the quotation.

Building the first quote

From the survey notes, the estimator picks the formations met in nearby wells and enters assumed metres for each. Casing and development lines follow. The total is read back to the customer over the phone. It is a first guess.

The farmer asks for a cheaper option

A farmer wants the pump left out and a shorter casing run. The revision is opened, those lines are changed and saves it as the next version. The first version stays. Both can be read later.

The owner checks a large quote

Before a large quotation leaves, the owner looks at the assumed depth beside what earlier jobs in the area reached. A low depth or a thin rate is changed first. Then the quotation goes out.

The yes on the telephone

When the customer accepts, the estimator marks the quotation accepted and it becomes a borehole job with its rates and lines carried over. The survey notes and pegged spot come along. Office staff take over from there.

Rate list choices before the first quote

Steady quotations need a steady rate list. Before the first one is issued, the firm agrees how formations are named, how revisions are labelled and what the customer is told about depth. Settle them first.

Formation names on the rate list

Agree the formations you price separately, such as sand, clay, weathered rock and hard rock, and what each is called. A name that staff use loosely makes the log and the quote disagree. Pick names the driller also uses.

How a revision is labelled

Decide what a new version must say: who asked, what changed and why. A line such as pump dropped is enough. A revision with no reason is hard to defend later when the bill is questioned.

What depth the customer is told

Agree how quoted depth is worded to the customer: one firm number, or a range with the rate beyond it. The bill later reads metres from the log. Say plainly that the rock decides the final depth.

Rates carried over from your price book

Your present rates sit in a price book or a spreadsheet. Decide which rates are loaded first, which casing sizes are included and which old quotations stay for reference. Open quotations come across with their versions.

Where a quotation stops and the rock decides

An estimate built on assumed depth is all a quotation is. It cannot know what lies below. Nor does it make the customer’s agreement binding on its own. Contract wording, terms of payment and legal advice stay with the owner and an adviser. Tax treatment of the quoted lines is for the accountant. A firm that quotes only a few sites can work from a printed form.

Quotation lines carried into the job and bill

In the middle of the chain sits the quotation. It takes survey notes in from the enquiry and, once accepted, hands rates, casing assumptions and the customer to the borehole job. The bill later reads the same rates against metres actually drilled. The lines are not retyped.

  • Survey notes and pegged spot arrive from enquiries and site surveys
  • An accepted quotation opens a borehole job with permits
  • Assumed casing sizes show the yard what may be needed
  • Billing by metre and item reads the same formation rates
  • Pump lines carry on into pump installation and service calls
FAQ

Frequently asked questions

Can one quotation price different formations separately?

Each formation carries its own rate per metre from your rate list, and the estimator enters assumed metres against each. The total is the sum of those lines plus casing, development and any pump. Each line stands on its own rate.

What happens to an earlier version when we revise?

It is kept. Each revision is saved as a new version with its date and reason, and the earlier one stays readable. The customer’s answer is recorded against the version that was actually accepted by the customer.

Does an accepted quotation start the borehole job?

An accepted quotation becomes a job, carrying the customer, rates and lines across. Permits, the rig and the crew are added after that. Nothing is retyped. The quotation stays attached to the job for comparison with the bill.

Can we add a pump as an optional line?

A pump, rising main and cable can be a line on the drilling quotation or a separate quotation. The customer can accept one only. Later repairs are logged against the same well, whichever way the pump was priced.

How do we see quotations that were lost?

Quotations won, lost and still open are listed together, with quoted depth beside depth drilled for jobs that went ahead. Reasons recorded on lost ones show where price or depth lost the work. Open ones show who needs a call.

Where it fits

How this feature fits the system.

Well Drilling Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site surveys

Each enquiry from a farm, household or developer is logged with its source, and the survey visit with rig access notes stays on the same record.

Lead Management

Quotations by metre and item

A quotation prices drilling per metre by formation, plus casing and development, from the firm’s own rate list, and every revision is kept.

Estimate/Quotation Management

Rig and crew schedule

Each rig, driller and helper is placed against a borehole with mobilisation days, so the office sees which rig and crew are free next.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.