Customer sites and unit register for refrigeration firms
The unit register holds each customer site with every cold room, cabinet, evaporator and condensing unit on it. Serial numbers, refrigerant types and install dates sit on the unit, not in an engineer’s memory. Dispatchers, engineers and accounts open the same entry before a call, a visit or an invoice.
What the refrigeration unit register records
Each customer site is an entry, and every cold room, cabinet, evaporator and condensing unit under it has a record of its own. It keeps what a visiting engineer needs to identify the plant before opening a panel. Fields are short, so they get filled in.
Using the unit register across a working week
A register earns its place on ordinary days. A call comes in, a visit is planned, a van is loaded and an invoice is raised, and each step opens a unit record. The moments below show where the entry gets read and changed.
Who reads the refrigeration unit register
Four roles read the register closely, and each looks for something different on the same unit entry. The entry is one record. What differs is the question the reader brings to it.
Decisions before loading the unit register
The register is only as good as its first load. Four choices come first. Settle them with the service manager and a senior engineer before any record is keyed in, because they decide who owns the data.
Unit register links to calls, visits and gas
The register is the record that other features read from, and it takes entries back from them. A fault call, a planned visit, a gas entry or an invoice each points to one unit. That single link keeps the history in step.
- Fault calls open against a chosen unit
- Planned visits are generated for each unit under contract
- Refrigerant log entries name the unit and cylinder used
- Service reports are filed on the unit’s history
- Invoices read contract cover from the unit record
Limits of the refrigeration unit register
A register describes plant. It does not inspect it, and it cannot tell whether a data plate was read correctly. Legal rules about refrigerant, and any duty to keep particular records, stay with the owner and their adviser. A firm with a handful of units and one engineer may find a notebook enough. Where several engineers share the work, a shared register is worth the effort.
Frequently asked questions
Can two rooms share one condensing unit record?
Each cold room or evaporator is entered on its own record. Both rooms point to one condenser. The dispatcher can then see which rooms depend on a shared condensing unit when it develops a fault.
What if the data plate is unreadable?
Enter what can be read and leave the rest open. A note says the plate was worn. The next engineer who gets a clear look adds the serial number. The unit is usable on a call meanwhile.
Can a unit move to another customer site?
A unit that is relocated can be re-entered under its new site with the old record kept as history. Ask for this to be set up during implementation. The serial number links the two entries.
Does the register show units we no longer service?
Units that leave a contract stay on record with their history, marked as uncovered. Nothing is deleted. The history stays for any later query. Calls on them can still be logged and billed as call-outs, so the history stays whole.
Who types the first load of units?
Your office supplies the files. Implementation loads them. A senior engineer then reviews a few sites on screen against the originals. Engineers add what the files lacked as they visit each site, one cold room at a time.
How this feature fits the system.
Commercial Refrigeration Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Maintenance contracts and renewals
Each contract holds its covered units, visit count and renewal date, so a lapse is flagged before a cold room fails.
Asset AMC TrackingFault calls and dispatch
A breakdown becomes a numbered call with the unit, the symptom and stock at risk, and it stays open until the engineer closes it.
Ticket ManagementPlanned maintenance calendar
Planned visits from contracts are placed against engineers by day and area, with urgent faults able to displace a routine service.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements