Installation jobs and commissioning for refrigeration contractors
Installation jobs take a refrigeration quotation through to a handed-over plant. Each job runs in stages, with brazing, nitrogen pressure tests, commissioning readings, drawings and handover documents held on the job. The project lead, the fitters and the office all work from the same record, wherever they are standing.
What an installation job record holds
An installation job is a project record. It begins as a quotation. Once the customer accepts, the same lines carry into the job, and stages, tests, readings and papers are added as the plant goes in. The finished record is the file you hand over.
A cold room installation from quote to handover
A cold room installation is built by several hands over several visits. The moments below follow one job from the accepted quotation to the handover meeting. Each stage leaves a record behind, written by the person who did the work. Handover comes last.
Who works from an installation job
Four roles touch an installation, and none sees the job quite the same way. One wins it, one builds it, one supplies it and one bills it. The record keeps their views in step.
Settling installation rules before the first job
Installations run for longer than a breakdown, so loose rules cost more. Four decisions belong to the owner and the project lead. Settle them before the first quotation is entered.
Installation jobs hand over to service and billing
An installation job takes parts, gas and price lines from other features, and when it ends it hands a finished plant to the service side. The new unit gets a register entry, and its first service is planned. The five links below show the hand-overs.
- Customer sites and unit register receive each new unit
- Van and store stock supplies parts and gas
- Refrigerant log records the first charge
- Maintenance contracts start cover on the new plant
- Invoices bill the job from the accepted quotation
Where installation job records stop
The job record keeps what was quoted, built and tested. It does not design the plant, certify a pressure test or approve a commissioning. Those judgements stay with the engineer in charge and the customer’s adviser. Building and electrical approvals sit with other trades. A small one-off job may need only a quotation and a checklist sheet.
Frequently asked questions
Can a quotation be revised after the customer replies?
A quotation can be revised. Each revision is kept, so the customer’s earlier version is not lost. Once one is accepted, it becomes the installation job. The accepted lines are the ones the stages follow.
Where are drawings and handover papers kept?
They are held on the installation job, next to the test records and readings. Anyone who opens the job sees them. The office and the site read one copy. After handover the same papers support later service of the plant.
Are nitrogen pressure test results stored?
Each result is recorded against the job with its date and the engineer who ran it. A failed test is kept too. The repeat that followed sits beside it. The customer’s file draws from this record, so nothing is retyped.
What happens to the new plant after handover?
The units are entered on the register with their serial numbers, refrigerant types and install dates. Service then starts from known details. A maintenance contract can be recorded against them if the customer signs one.
Can I see how far each installation has got?
Each job is split into stages with a status, so the project lead reads progress stage by stage. A stage not yet marked done stays visible. Fitters update stages from a phone at the site.
How this feature fits the system.
Commercial Refrigeration Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Maintenance contracts and renewals
Each contract holds its covered units, visit count and renewal date, so a lapse is flagged before a cold room fails.
Asset AMC TrackingFault calls and dispatch
A breakdown becomes a numbered call with the unit, the symptom and stock at risk, and it stays open until the engineer closes it.
Ticket ManagementPlanned maintenance calendar
Planned visits from contracts are placed against engineers by day and area, with urgent faults able to displace a routine service.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements