Installation jobs and commissioning for refrigeration contractors

Installation jobs take a refrigeration quotation through to a handed-over plant. Each job runs in stages, with brazing, nitrogen pressure tests, commissioning readings, drawings and handover documents held on the job. The project lead, the fitters and the office all work from the same record, wherever they are standing.

What an installation job record holds

An installation job is a project record. It begins as a quotation. Once the customer accepts, the same lines carry into the job, and stages, tests, readings and papers are added as the plant goes in. The finished record is the file you hand over.

Quotation lines and revisions

A quotation lists equipment, pipework, lagging and labour from your price list. Each revision is kept. Once accepted, it becomes the installation job with its stages, so nobody retypes the scope of work from a paper copy.

Stages of the installation

The job is split into stages, such as pipework, brazing, pressure test, charging and commissioning. Each stage has a status. The engineer who did it is named. The project lead sees where the plant stands without ringing the fitters for news.

Pressure tests and commissioning readings

Nitrogen pressure test results are recorded against the job with the date and the engineer. Commissioning readings follow once the plant runs. Both stay on the job, ready for the customer’s file and for any later question about how the plant was proved.

Drawings and handover documents

Drawings and handover documents are held on the job, beside the test records, the readings and the equipment details. The customer receives them at handover. Later service starts from the same papers, so an engineer opening the unit later sees how it was built.

A cold room installation from quote to handover

A cold room installation is built by several hands over several visits. The moments below follow one job from the accepted quotation to the handover meeting. Each stage leaves a record behind, written by the person who did the work. Handover comes last.

The quotation is accepted

A restaurant group accepts the quotation for a new cold room. The office opens the installation job from it. Equipment, pipework and labour carry over, and the stages appear ready to be worked through in order.

Pipework is brazed

Fitters run the pipework between the evaporator and the condensing unit and braze the joints. The stage is marked done on a phone with the engineer’s name and the date. Nothing moves to testing before it.

The nitrogen pressure test

Before any gas goes in, the system is pressure tested with nitrogen. Gas waits for the test. The result is typed into the job with the date. A test that fails is recorded, then repeated after the repair.

Commissioning and handover

With the plant running, the engineer records commissioning readings. The drawings and handover documents are checked on the job. The customer receives them. The unit then goes onto the register, so future service starts from known details.

Who works from an installation job

Four roles touch an installation, and none sees the job quite the same way. One wins it, one builds it, one supplies it and one bills it. The record keeps their views in step.

Owners follow jobs by stage

An owner sees which jobs are quoted, which are accepted and which are mid-installation. A stalled stage is visible. The owner can then ask the right question of the right fitter, before the customer asks it.

Engineers record stages on a phone

Fitters mark stages complete, enter pressure test results and key in commissioning readings from the site, each under their own name. Drawings open on the phone. The paper pack stays in the van, in case the signal drops.

Stores supply parts and gas

Stores and purchasing issue compressors, valves, controllers and gas to the job’s van or to the site. Parts are used against the job. What was drawn is then plain to see, job by job, from the same stock records the vans use.

Accounts bill from the accepted quote

Accounts read the accepted quotation and the parts and labour recorded against the job. Invoices are raised from the record, with tax set for your country, so the customer sees what was quoted. Scope changes arrive as revisions.

Settling installation rules before the first job

Installations run for longer than a breakdown, so loose rules cost more. Four decisions belong to the owner and the project lead. Settle them before the first quotation is entered.

Who may revise an accepted quote

Decide whether a revision after acceptance needs the owner’s approval or only the project lead’s. Every revision is kept. The customer’s agreed version stays readable, so a dispute starts from what was accepted, not from anyone’s memory of a site meeting.

What the job record leaves out

Agree which work belongs to other trades, such as electrical supply or building work, and whether it appears on the job at all. Name an owner for each item. A short note keeps the record honest.

How jobs under way come across

Jobs already in progress are entered from your quotation and stage notes, starting at the stage they have reached. Someone in your office checks a few against the originals before fitters rely on them. Entry is by hand.

Which installation view matters first

Choose the first view the owner reads, such as jobs by stage or parts used against each job, and write down why it comes first. Start with stalled jobs. The other follows once enough jobs have run to give it meaning.

Installation jobs hand over to service and billing

An installation job takes parts, gas and price lines from other features, and when it ends it hands a finished plant to the service side. The new unit gets a register entry, and its first service is planned. The five links below show the hand-overs.

  • Customer sites and unit register receive each new unit
  • Van and store stock supplies parts and gas
  • Refrigerant log records the first charge
  • Maintenance contracts start cover on the new plant
  • Invoices bill the job from the accepted quotation

Where installation job records stop

The job record keeps what was quoted, built and tested. It does not design the plant, certify a pressure test or approve a commissioning. Those judgements stay with the engineer in charge and the customer’s adviser. Building and electrical approvals sit with other trades. A small one-off job may need only a quotation and a checklist sheet.

FAQ

Frequently asked questions

Can a quotation be revised after the customer replies?

A quotation can be revised. Each revision is kept, so the customer’s earlier version is not lost. Once one is accepted, it becomes the installation job. The accepted lines are the ones the stages follow.

Where are drawings and handover papers kept?

They are held on the installation job, next to the test records and readings. Anyone who opens the job sees them. The office and the site read one copy. After handover the same papers support later service of the plant.

Are nitrogen pressure test results stored?

Each result is recorded against the job with its date and the engineer who ran it. A failed test is kept too. The repeat that followed sits beside it. The customer’s file draws from this record, so nothing is retyped.

What happens to the new plant after handover?

The units are entered on the register with their serial numbers, refrigerant types and install dates. Service then starts from known details. A maintenance contract can be recorded against them if the customer signs one.

Can I see how far each installation has got?

Each job is split into stages with a status, so the project lead reads progress stage by stage. A stage not yet marked done stays visible. Fitters update stages from a phone at the site.

Where it fits

How this feature fits the system.

Commercial Refrigeration Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Maintenance contracts and renewals

Each contract holds its covered units, visit count and renewal date, so a lapse is flagged before a cold room fails.

Asset AMC Tracking

Fault calls and dispatch

A breakdown becomes a numbered call with the unit, the symptom and stock at risk, and it stays open until the engineer closes it.

Ticket Management

Planned maintenance calendar

Planned visits from contracts are placed against engineers by day and area, with urgent faults able to displace a routine service.

Technician Scheduling
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements