Refrigerant and gas log for refrigeration engineers
The refrigerant and gas log links every kilogram of gas to a unit, a cylinder and an engineer. Gas added, recovered and returned is recorded with leak test results and tare weights. When an auditor or a customer asks for the record, it is printed on request, not dug out of paper.
What the refrigerant and gas log records
Each gas movement is one line in the log. Each line is dated. It names the unit, the cylinder, the engineer and the weight, and says whether gas went in or came out. Fields your regulator expects are agreed with you during implementation.
Recording gas through a refrigeration day
Gas moves in small amounts across several jobs, so the log is kept as the work happens. The moments below follow a cylinder and an engineer from the store to a cold room and back to the store again. Entries follow the work.
Who reads the refrigerant and gas log
Four roles meet the gas log, and each needs a different line from it. Engineers write the bulk of it. The others read it to check stock, to bill gas and to answer an auditor.
Gas log decisions before go-live
Gas records carry weight with auditors, so the rules are worth fixing early. Four decisions belong to the owner, the service manager and the stores keeper. Take them together before any cylinder is entered.
Gas entries hand to stock, reports and bills
A gas line is written once and read in several places. It takes its unit from the register and its cylinder from the stock records. It hands the quantity onward to the visit report and the invoice. The five links below show where it goes.
- Unit register holds the refrigerant type for each unit
- Van and store stock tracks cylinders by location
- Service reports carry the gas added on a visit
- Invoices bill gas used alongside parts and labour
- Planned visits and fault calls prompt the gas entry
Where the refrigerant log stops
The log records gas. It does not certify an engineer, decide what a leak test must show or file anything with an authority for you. Legal duties on handling, recovery and record keeping stay with the owner and their adviser. A single engineer with one cylinder and a notebook may find paper enough. The record shows what was logged, which is only as good as the entries made.
Frequently asked questions
Can the log show gas used by one engineer?
Each line names the engineer who held the cylinder, so gas can be read by engineer as well as by unit and cylinder. The owner can see who uses what. Differences between engineers become a conversation, not a guess.
How is a part-used cylinder handled?
The cylinder is weighed on return. Its remaining gas is recorded against its tare weight. It stays on the store list until it is issued again, so stock of gas is read from real weights.
Can a record be printed for an auditor?
A record is printed on request. It lists gas added, recovered and returned by unit, cylinder and date, with leak test results. You choose the unit and the dates. Fields beyond that are agreed with you.
What if an entry is made against the wrong unit?
The named corrector amends the line and the original stays visible. The right unit then shows the gas, and the wrong unit loses it. The change is dated. An auditor sees both, which is the point.
Can leak tests be reviewed by unit over time?
Every test is held against its unit, with date and result. Failures stand out. Reading them in order shows a unit that keeps failing, and results by unit and date are listed for the owner to review.
How this feature fits the system.
Commercial Refrigeration Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Maintenance contracts and renewals
Each contract holds its covered units, visit count and renewal date, so a lapse is flagged before a cold room fails.
Asset AMC TrackingFault calls and dispatch
A breakdown becomes a numbered call with the unit, the symptom and stock at risk, and it stays open until the engineer closes it.
Ticket ManagementPlanned maintenance calendar
Planned visits from contracts are placed against engineers by day and area, with urgent faults able to displace a routine service.
Technician SchedulingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements