Skip to main content
GullySystem

Returns, quality holds and supplier claims

When incoming inspection fails, the lot is put on hold. When a customer sends parts back, the return is recorded with its reason. The claim on the supplier is raised from the same entry. The hold, the return and the claim stay linked, so the quality desk can follow all three.

What a hold, a return and a claim record

Three things can go wrong with a lot: it fails inspection, a customer sends it back, or the supplier has to answer for it. One entry can carry all three. Four kinds of record are kept, and they stay joined.

The hold on a lot

A hold is placed on a lot, with the reels involved and the reason. It carries a date and the user who placed it. Anyone reading the lot sees the hold. Stores and sales see it too.

The failed inspection note

The inspection that triggered the hold is noted against the lot. Quality records what failed and what was checked. That note is what the supplier is shown, so it needs to be specific and dated.

The customer return and its reason

A return records the customer, the parts and the lot sent back. The customer’s reason is entered in plain words. Later, a list of returns by lot shows whether one reason keeps coming up, and for which part.

The linked supplier claim

A claim on the supplier is raised from the same entry as the hold or the return. It points back to both. Claims stay linked, so the story of one lot sits in one place.

A failed lot from inspection to claim

A bad lot creates work for several desks. They act one after another. Four moments follow one failed lot through the house, from the dock to the claim. Each shows who acts, and what the record shows afterwards for the next person to read it.

A reel fails incoming inspection

Quality inspects a delivery. The parts do not match their certificate. The lot is put on hold, with the failed check noted. The hold is visible to stores and to sales, so nobody quotes or picks from it unaware.

A customer returns a reel

An assembly line sends back parts that failed on its board. Stores book the return against the lot. The customer’s reason is entered with it. The date code is already on file, so no one has to ask the customer for it.

Raising the claim on the supplier

From the hold or the return, the buyer raises the claim. The supplier is named. The inspection note and the certificate go with it. That claim keeps its link to the lot and to the customer’s return.

Releasing or closing the lot

After review, the quality head decides what happens. A lot may be released from hold, or it may be closed out as returned or rejected. The decision is recorded, with a name and a date.

Who holds, returns and claims on a lot

Work moves from quality to stores to buying. Each role sees the same lot and acts on a different part of it. Here is what each person does, and what the screen shows them.

Quality desk placing the hold

Quality holds a lot after inspection, attaches the failed-inspection note and traces the date code to the customers it went to. They also release a lot. Both actions carry a name and a date for later review.

Stores booking returns

Stores receive a returned reel. They book it against the lot with the reason. When they pick, they see the hold on the lot. A held reel is not taken for ordinary stock on the shelf, because the hold shows at the pick.

Buyers raising the claim

Buyers raise the claim on the supplier from the same entry. They see the inspection note, the certificate and the customer’s reason together on one screen. A claim is never rebuilt from emails. Claims stay linked.

Owners reading what failed

Owners read the lots on hold and the claims open on each supplier. A supplier whose lots fail again and again becomes visible. That gives the owner facts. The next buying conversation with that supplier starts there.

Decisions to settle before holds are used

A hold stops stock. The rules matter. Settle these four points with the stores head and the quality head before the first hold is placed. They decide who can stop a lot and who can free it.

Who may place and release holds

Decide who can put a lot on hold and who can release it. Keep the two lists apart where you can. How a hold is released is agreed with stores and quality, and written down.

Which return reasons are recorded

Agree a short list of return reasons that your desk will use, such as wrong part or failed on board. A fixed list makes the later review readable. Free text stays available for the detail.

How open claims come across for returns and quality holds

Claims already open with suppliers are keyed in with their lot and date code. Each is linked to the lot it concerns. Claims with no lot reference are listed for the quality head to resolve.

Which list to open first for returns and quality holds

Begin with lots dispatched per date code, for a lot on hold. It shows every customer who may hold the same parts. The quality head decides whom to tell and in what order. Contact is theirs to make.

How holds and returns connect to other features

Holds are only as useful as the entries around them. They rely on lots and dispatches made elsewhere. The result goes to buying and accounts. Holds follow the lot wherever it is read. Five links show where the same lot is read again, and what each reader needs.

  • Stock by date code marks which reels belong to the lot
  • Certificates and traceability list customers sent that lot
  • Supplier orders carry the claim back to the supplier
  • Bin locations show where each held reel sits
  • Invoices and dues take any credit that is agreed

Where holds and returns stop

The system keeps the record. It does not inspect a part, decide whether a lot passes, or settle a claim with a supplier. Credits to a customer and their tax treatment stay with the owner and your accountant. A distributor who sees one return a year can note it on paper, with no new system.

FAQ

Frequently asked questions

Can a lot on hold be released later?

Yes. The rule for release is agreed with your stores and quality heads. A release is recorded. It carries a name and a date, so the history of the lot shows when it was held and when it was freed.

Does a customer return need a reason?

Yes, the reason is recorded. It is entered in plain words with the return. A fixed list of reasons can be agreed at set-up. Either way the reason stays on the entry, beside the lot.

How is the supplier claim kept with the lot?

It is raised from the same entry as the hold or the return. The claim stays linked to both. Open the lot and the hold, the return and the claim all appear together. Nobody rebuilds the story from mailboxes.

How do we see who else got a held lot?

Search the date code. The list shows every customer sent that lot, drawn from dispatch entries. The quality head can then decide whom to contact and what to say about the parts, and in what order.

Who is told when a lot goes on hold?

The hold shows on the lot for everyone who opens it, including stores, sales and buyers. The system sends no notices. Customers and suppliers are contacted by your quality head and the owner themselves, in their own words.

Where it fits

How this feature fits the system.

Electronic Components Distributor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

BOM import and quotation

Each BOM line becomes a quoted line with stock, supplier lead time and rate, and a revised file keeps the earlier version on record.

Quote & Proposal Management

Stock by date code, lot and reel

Every reel received is numbered with its lot and date code, so a pick follows the code the buyer wrote on the order.

Batch and Serial Tracking

Bin locations and counts

Movements by bin raise a flag when a part falls under its reorder level or a count differs from the book balance.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements