Skip to main content
GullySystem
Telecom · Fibre Installation Company Management Software

Route segments, cable drums, splice sheets and test traces in one build record.

Manage tenders, route surveys, permits, segments, cable drums, closures, splice sheets, test traces, customer drops, crews and milestone invoices in one system. Each route segment carries its length, its method, its permit, its drum and its measured result from survey to handover pack. Installers close drop jobs on a phone, and the office stops rebuilding the record at night.

  • Route methods, permit types and drop job forms entered the way your crews work
  • Open routes, drum stock and subcontractor balances migrated
  • Changes to forms, rates and pack layouts made by GullySystem staff when asked

Fibre installation companies keep route surveys, permits, segments, cable drums, splice records, test traces and customer drops inside Fibre Installation Company Management Software from GullySystem. Each segment holds its length, method, crew, drum numbers and results. Installers close drop jobs on a phone, and the handover pack builds from what was recorded.

Where it breaks today

What goes wrong before the software.

As-built records are drawn from memory

A crew closes a trench and moves to the next street. The sketch of closure positions and duct depth is redrawn weeks later, and a repair team after a cable cut digs where the drawing says, not where the duct lies.

Drum balances are not written down

A drum leaves with a start mark and returns part-used. Nobody notes the end mark, so the remaining length is guessed. Offcuts are scrapped while a new drum is bought.

Test results stay on the instrument

OTDR traces and light-loss readings remain on the tester or in a technician’s folder. At handover the client asks for the pack, and spans without a trace have to be re-shot. That means a second visit.

Permits run out before the trench closes

Road opening, pole attachment and building permissions each have dates and conditions. One lapses with the trench open, and reinstatement photographs are missing when the authority inspects.

Subcontractor metres do not match the sketch

Crews are paid per metre or per drop, yet the foreman, the subcontractor and the office each hold a different total, so every pay run begins with an argument. Nobody wins it.

Drop installations fail quietly

A home drop is fitted, but the power reading at the socket is low and nobody records it. The customer’s provider logs a fault, and the installer is sent back unpaid. The second visit is unpaid.

How it runs

How the work flows through it, step by step.

  1. 1

    Tender and survey

    A build is quoted by segment from survey notes and cable rates. Once awarded, the route is surveyed and split into segments with a method and a permit list.

  2. 2

    Permits and mobilisation

    Road, pole and building permissions are applied for and tracked with dates. Crews, drums and ducts are allotted to the first segments that are cleared.

  3. 3

    Civil and cable work

    Trenching, duct laying, blowing or aerial lashing is recorded per segment with metres done, depth, photographs and the drum used.

  4. 4

    Splicing

    Standing at the closure, the splicer enters each fused core on a phone, with its cabinet, tray slot and colour recorded as the joint is made. The sheet fills itself.

  5. 5

    Testing and handover pack

    Light loss and OTDR traces are attached to each span. The handover pack lists spans, results, as-built photographs and permit closure documents for the client.

  6. 6

    Drops, measurement and billing

    Customer drops are closed with ONT serial and power reading. Measured segments and drops become subcontractor pay and a milestone invoice for the client.

Modules

What is inside.

Every module can be switched on, left out or changed to match how your team already works.

Tenders and route quotations

Price a build by segment and method from your own duct, cable, labour and permit costs, and keep each revision submitted to the network owner. Nothing is retyped.

Route survey and segments

Split a route into segments with length, method, permit needed and crew allotted. Survey photographs and notes stay on the segment.

Permits and reinstatement

Hold road, pole and building permissions with dates, conditions and fees. A segment closes only when reinstatement photographs are attached.

Cable drums and closures

Record drums by number with start and end marks, metres used per segment, offcuts returned and the closures or cabinets fitted.

Civil and cable work log

Capture trenching, duct laying, blowing or lashing by segment with metres, depth and photographs, so the as-built is made while the crew is on site. No redrawing later.

Splice sheets

Store fibre-by-fibre splice records per closure, with tray position, splice loss and the technician who made each joint.

Test traces and handover pack

Attach OTDR traces and light-loss readings per span, and assemble the handover pack from them with as-built photographs and permit closures.

Customer drop jobs

Give installers a daily list of drops. They record drop length, ONT serial, power at the socket and a customer signature on a phone.

Crew scheduling

Allot splice, civil and drop crews by segment and day, with a view of who is on leave and which segments wait on a permit.

Subcontractor measurement and pay

Measure completed metres and drops per subcontractor and compute pay from agreed rates, so the figure the foreman signs is the figure paid.

Milestone invoices

Bill the network owner by route milestone or completed drop, attaching the measurement sheet and test pack behind each invoice.

Solutions inside

The business modules it is built from.

Each one is also available on its own, or inside a system built for you.

  • Estimate/Quotation Management

    A tender is priced by segment and method from duct, cable, labour and permit costs, with each revision to the network owner kept.

  • Work Order Management

    Each segment becomes a work order with metres done, depth, photographs and the drum used, written while the crew is still on site.

  • Project Document Management

    Road, pole and building permissions are stored with their dates and conditions, and a segment closes only once reinstatement photographs are filed.

  • Stock Tracking and Alerts

    Drums are issued with start marks and returned with end marks, so the remaining length and offcuts are known before the next purchase.

  • Quality Control

    Each span carries its OTDR trace and light-loss reading, and a span without one is flagged before the handover pack is built.

  • Job Cards

    A job card per home records drop length, ONT serial, power at the socket and a signature, closed by the installer on a phone.

  • Technician Scheduling

    Splice, civil and drop crews are placed on segments by day, with leave and permit waits visible on the same board.

  • Invoice Management

    A milestone or completed-drop invoice goes to the network owner with the measurement sheet and test pack attached behind it.

Services

How we would put it in.

Setup, data migration, integrations and anything built on top.

Who uses it

One system, each person sees their part.

For owners and directors

Read segments finished, spans awaiting traces, subcontractor liabilities and receivables per client without phoning a foreman.

For project managers

Plan segments, watch permit dates and see which route holds up a milestone invoice.

For splicers and test technicians

Record joints and light-loss readings per closure and span, and attach traces from the instrument.

For drop installers

Open the day’s drop list, scan ONT serials, record power readings and collect a signature.

For store and accounts staff

Issue and receive drums, post subcontractor pay, and raise milestone invoices from measured work.

Reports

The numbers the owner asks for.

  • Segments by status, method and crew
  • Drum balance by number, with offcuts returned
  • Spans without a trace or with a failed reading
  • Permits expiring in the next fortnight, by authority
  • Drops closed, failed and repeated, by installer
  • Subcontractor metres and pay by route
  • Milestone invoices raised and received by client
Good fit

Who this is built for.

  • Contractors that build trunk and feeder fibre routes for network owners
  • Installers that run customer drops for broadband providers
  • Companies that blow micro-duct or lash aerial fibre on poles
  • Firms that splice and test fibre as a subcontractor to larger builders
  • Companies fitting in-building fibre in offices, estates and apartment blocks
Honest answer

When it is not the right choice.

  • A sole splicer taking on just a few small jobs each month is likely to manage with a phone camera and a folder of photographs.
  • A company whose main trade is selling broadband plans and billing subscribers every month is better served by Internet Service Provider Management Software, which is built for that.
Made to fit

Adapted to your business before it goes live.

You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.

Route methods and permit types

Trench, micro-duct, aerial and riser methods, and the permit types your local authorities issue, are entered as you use them.

Test pack layout

The handover pack follows the layout each network owner asks for, set up once and reviewed with your test lead.

Rates and pay rules

Per-metre, per-drop and day rates for direct staff and subcontractors follow your agreements.

Open routes and stock migrated

Routes under construction, remaining drum lengths, fitted closures and milestones not yet paid are keyed in from the spreadsheets you keep now.

Instrument files

How trace files leave the tester and reach the record is worked out with your technicians during implementation.

Hosted by GullySystem

GullySystem hosts the system, so office staff, crews and subcontractor leads read the same route record.

Works alongside

  • WhatsApp or other messaging
  • SMS
  • Email
  • Card and payment gateway
  • Mapping or CAD file links
  • Accounting export
Common questions

Questions owners ask before a demo.

Does it handle both trunk routes and single home drops?

Yes. A trunk route runs as segments with drums, closures and splice sheets. A single home drop runs as one small job card holding the drop length, the ONT serial and the socket power figure.

Where do OTDR traces go?

A trace file and its light-loss reading attach to the span they measured. Spans still missing a trace appear on a list before the handover date.

Can a segment stay open until reinstatement is photographed?

Yes. A segment cannot be closed while its reinstatement photographs are missing, so the authority’s inspector finds a complete file. The close button stays locked.

How are cable drums tracked?

Each drum carries a number and start and end marks. Metres pulled are posted per segment, and the part-used drum returns with its balance rather than a guess.

Can subcontractors use it?

A crew lead gets a phone login limited to the segments and drops allotted to that crew. Their measured work feeds pay but they do not see other crews.

Does it replace our design drawings?

No. Route drawings stay in your mapping or CAD tool. Segments here carry names, lengths, coordinates and photographs. They link to those drawings.

How do we move running routes across?

Each open route arrives from your spreadsheets with its remaining cable drum lengths, splice closures and milestones awaiting payment. Your project managers check each open route before go-live.

What happens when a permit is about to lapse?

Each permit has its date and conditions. A list of permits expiring soon sits on the project manager’s screen with the segments they cover.

Is pricing based on crews or jobs, and can we see a demonstration?

Crew count and the outside tools you want connected set the size of the quotation. We show a working demo using one of your own routes, then send a written proposal.

Who owns the records?

You do. Segment sheets, splice records, traces and photographs can leave the system in an agreed layout spelled out in the quotation, so a later client audit stays in your hands.

Wondering what it would cost? Share your requirements and an engineer will come back with a scope.

Book a demo

See Fibre Installation Company Management Software with your own data.

Tell us how you run things today. We’ll show you the parts that matter to you and say plainly what would need changing.

  • No obligation
  • A reply within one business day
  • Your details stay private

Start with your requirements

Seven short steps that tell us what you need. An engineer reads them before getting in touch.

Share your requirements