Skip to main content
GullySystem

Harvest and grading records for a flower farm

Harvest and grading turns a morning’s cutting into counted stems. Crews report what they cut by bay, graders sort by variety, length and bud stage, and bunches are counted into boxes. Each box leaves the table with a label naming its bay. Crew leaders, graders and the head grower all use it.

What the cutting and grading record keeps

Cutting is recorded against the bay, and sorting is recorded against the grade. Both sets of counts sit on the same harvest record. That lets a short cut be seen where it began.

Stems cut per bay and crew

Bay and crew come first. A crew leader keys the cut for each variety on a phone in the greenhouse, with the date. Entries wait on the device and sync once a network is in range.

Grades by length and bud stage

Graders sort each variety by stem length and bud stage and enter the grade names used in your hall. A bay’s cut then splits into grade A, grade B and the rest. The names are yours.

Damage and rejected stems

Stem length, bud stage and damage are checked at the grading table by the grading team. Rejected stems are logged to the bay that produced them, with variety and count. A reject count is kept for each variety. Rejects keep their bay.

Counted bunches and box labels

Graded stems are bunched in counted units and boxed. Each box label carries the bay, grade and cutting time. Bunch size and carton are set per buyer, and so is the label layout. Labels come from a label printer.

A cutting morning from bed to box

A harvest day on a flower farm runs from the first cut at the beds to the last box set on a pallet. Each step leaves a record. Four moments below are ones that crews and the grading hall meet every cutting day.

A crew leader finishes Bay 3

A crew leader finishes cutting Bay 3 and keys the stem count for the variety on a phone. The figure is on record before the first bucket reaches the table. A short cut is visible early.

A grader sorts roses

At the grading table a grader sorts a bucket of roses by stem length and bud stage and enters the count for each grade. Damaged stems go to the reject count. Each pile is entered separately.

A packer closes a florist’s box

A packer bunches the counted stems, sleeves them and boxes them for a florist’s standing order. The grading lead then prints the label, which names the bay. The box is ready for the cold room.

Head grower checks Bay 7

Mid-morning the head grower sees Bay 7 running below plan and walks down to it with the crew leader. A crew, a spray or a late crop might explain the gap. The record points to the bay.

Who enters and who reads harvest figures

Harvest involves more hands than any other feature on the farm. Four roles meet it. Each sees a different slice of the same record, on a screen set to match what that role does.

Grading and packing leads

Grading leads enter grades and counts as bunches are made, then print box labels. Boxes are placed into the cold room by pallet from the same screen. This lead owns the table record. Questions about a count come back here.

For head growers

The head grower reads stems cut per bay against the planting plan and looks at the reject count by bay. A bay that cuts short is followed up in the greenhouse. Rejects are read the same way.

For farm owners

The owner reads stems cut, the grade mix and the week’s totals for every bay without walking the greenhouse. The grade mix shows how much of the crop reached the top grade. The owner changes nothing here.

Sales and dispatch desk

The desk does not enter harvest. It reads which grades and varieties have been cut and boxed, then allots them to orders from the cold room. A shortfall in grade A is visible before an order is promised.

Decisions to settle before harvest entry starts

Grading discipline sets the pace of everything that follows, so these choices are made with the head grower and the grading lead together. Settle them first. Each one changes how the harvest figures read later.

Who may correct a count for Harvest and grading

Decide who may correct a count once a box is labelled. Crew leaders enter cuts, and a grading lead might alone amend them. Every amendment should carry a name and a date. Fewer hands means cleaner counts.

What the cut figure excludes

Decide whether stems dropped before grading, vase life trials, display stems for buyers and samples given away are counted. Each choice changes the cut figure. Write the rule down and hand it to the crews.

How earlier harvest comes across

Bay plans and open orders come across before go-live and are spot-checked in the hall. Decide whether last season’s harvest totals are keyed in for comparison or the new record starts clean. Either is workable.

Which harvest report comes first

The harvest reports are stems cut per bay, variety and crew against plan, and grade mix by variety and by week. Pick the one the owner will read first. Build the entry habit around it.

Where harvest records pass to other features

Harvest is the middle link. It takes a bay from the register and passes graded boxes onward. Five links matter in running the packing hall and the sales desk. A box that is graded and labelled is ready for the step after it, whether that is the cold room or an order.

  • Bay and variety are taken from the bay register
  • Labelled boxes pass into the cold room by pallet
  • Graded stock is allotted to standing and one-off orders
  • Crew counts feed harvest crew attendance and pay
  • Rejects and box labels are read when a claim arrives

What harvest and grading leaves to others

The feature counts and labels stems. It does not judge quality for the grader, set the grade rules or grow the crop. Grade definitions come from the farm and its buyers. Residue checks that a buyer or authority expects are for the head grower and an adviser. A farm cutting one variety for one buyer may get by with a tally sheet.

FAQ

Frequently asked questions

Can a grade be renamed after harvest has started?

Grade and packing rule changes are handled by us whenever you ask. Tell us what changed. Send the new name and the date it applies from. Check earlier boxes with the grading lead before comparing weeks that straddle the change.

What does a grader enter at the table?

For each variety the grader enters counts by length and bud stage, plus a reject count for damaged stems. Bunches are counted units. Then the box label prints. The entry replaces the paper tally sheet.

How is a short cut spotted by bay?

Stems cut per bay are read against the plan the head grower entered. A bay running below plan stands out. The record does not say why. That is found in the greenhouse, with the crew and the bay’s feeds in view.

Can one box hold stems from two bays?

Labels carry a bay, so a mixed box would lose the trace a claim needs. Keep one bay to a box. Where a buyer insists on mixed boxes, settle the rule with us and the grading lead at set-up.

Do packers need a label printer?

Label printers are one of the integrations. Where one is fitted at the table, box labels print from the grade entry. Whether to fit one at the start or later is decided with your grading lead during set-up.

Where it fits

How this feature fits the system.

Flower Farms and Nursery Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Propagation and nursery lots

Each tray of cuttings takes a lot number tied to its mother plant, and the number follows it through hardening, potting and sale.

Batch and Serial Tracking

Cold room and stock

Boxes are received into the chiller by pallet, released against orders, and the oldest stock of each grade is flagged to ship first.

Stock Tracking and Alerts

Orders, standing buyers and dispatch

A florist’s standing order is filled box by box from the cold room, and any shortfall by grade is shown to the sales desk.

Order Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements