Skip to main content
GullySystem

Field crew and instrument calendar for surveys

A survey party needs people, an instrument and an open gate on the same morning. The field crew and instrument calendar assigns surveyors, helpers and instruments to each visit. It shows a clash before the day arrives and flags a site not yet cleared for entry. Everyone reads the same calendar.

What a field visit record contains

Each visit is one entry on the calendar, tied to a job. It carries the people, the instrument, the date and the state of the site. Four parts are worth describing. Together they answer who is going, with what, and whether the gate will open.

Surveyors and helpers on the party

Each visit names the lead surveyor and each helper who will hold the staff or carry the prism pole. A party can be one person or several. A person already booked on another site that day shows that plainly.

The instrument assigned

Each total station or level is booked by day against the job it will serve. The instrument chosen for a visit is recorded on it, so later readings can be matched to the set that took them. A double booking shows as a clash.

Date and site details

The visit date, the village, the survey number, the owner’s name and a contact at the site are entered. Directions are added for hard plots. Nobody should drive to a gate with no one to open it.

Entry clearance flag

A site has to be cleared for entry before the party goes, whether by the owner, a tenant or a guard. The calendar flags a visit whose site is not cleared. Staff then call or message the owner.

A crew’s day from booking to return

Every visit passes through the hands of several people before the party returns. Booking is made at the office, checked the day before and carried out in the field. Four moments give a picture of it. Each moment starts from the calendar.

Fixing a date with a client

A client asks for a Saturday visit. Reception opens the calendar, finds a party and a total station free that day and books the visit. A message with the date and the papers still wanted goes to the client.

A clash caught early

Two jobs are booked on the same total station for the same morning, one by the principal and one by reception. A clash shows before the day. Staff move one visit or find another set before the client is told anything.

The party’s morning

Before leaving, the surveyor opens the day’s sites on a phone and sees the instrument assigned and the papers needed for each. A helper loads the assigned instrument. Both know which site comes first and who will meet them there.

A site found not ready

The owner’s message says the gate is locked. The key is away. Staff mark the site as not cleared and the visit moves to a later date. The party’s day is given to another job waiting for the same instrument.

Who books, travels and watches the calendar

Four seats use the calendar for different reasons. One books, one travels, one watches over all of it and one bills what was done. Each sees a view that fits its task.

Office and reception

Reception books visits, moves them and answers the client who rings to ask when the party is coming. It sees every party, helper and instrument on one screen. Visit dates go to clients by message.

Field surveyors and helpers

A surveyor gets the day’s sites in order, with the instrument assigned, the owner to meet and the papers needed for each. Helpers see the same visit and know which instrument to load. Both upload readings and photos from the site.

The principal surveyor

The principal reads field visits scheduled by crew and instrument and sees which visits need a second party. A shortage of parties shows before promises are made to clients. New requests are placed to match.

Accounts and revisit billing

Accounts looks at visits marked done and checks which of them have no stage fee raised against the job. That list shows visits without a bill. A second visit after an objection is spotted and billed as a revisit.

Decisions to settle before the calendar goes live

A calendar works when its rules are agreed. Settle four points with the principal surveyor and the office lead. Do this before the first visit is booked. Each one is a matter of habit more than software.

Who may move a visit for Field crew and instrument calendar

Decide who may change a booked date, swap a surveyor or release an instrument. If everyone may, bookings drift. Give that right to reception and the principal, and let surveyors ask for changes by telling the office.

What goes on the calendar

List every instrument that needs booking, such as each total station and level, and give each a name the field staff already use. Tapes, pegs and ranging rods need no entry. Leaving them off keeps the calendar short.

How old schedules come across

Visits already promised to clients are entered by hand before the first day. Past visits need no entry. Their readings are kept on each job. Check the paper diary line by line against the calendar before the old diary is put away.

Which report matters first for Field crew and instrument calendar

Start with visits scheduled by crew and instrument. It shows who is where and which set is free. After that, add the list of sites not yet cleared for entry. It is checked each morning by the principal.

How the calendar links to other survey records

The calendar takes jobs from the register and checks papers before the party leaves. After the visit it passes the date to measurement sheets and to the fee stages. Visit dates and changes reach clients by message. Five links tie it to the rest of the work.

  • Open jobs from the register wait for a visit
  • Pending papers flagged before the party leaves
  • Visit date stamped on the measurement sheets
  • Completed visits prompt the stage fee in invoices
  • Dates and changes sent to clients by message

Where the calendar stops

Treat the calendar as a booking board, not a route planner. It does not choose the order of sites, estimate travel time or follow a vehicle. Whether a site may lawfully be entered stays with the owner, the surveyor and their advisers. A firm with one party and one instrument may do well enough with a wall diary. Clashes only arise once a second party exists.

FAQ

Frequently asked questions

Can two jobs use one total station on different days?

Yes, the booking is by day, so one instrument can serve several jobs in a week. Only a booking on the same day shows as a clash, whichever jobs they belong to. Half-day splits are settled at set-up.

How does the office learn a site is not cleared?

The owner or tenant tells the office, and staff mark the site not cleared on the visit. The flag then shows on the calendar and on the surveyor’s list. Clearing it again removes the flag.

Can a party be booked for two sites in a day?

Yes, a day can hold more than one visit for the same party, up to what the crew can do. Their order is set by the office. Travel between sites is the surveyor’s judgement, not something the system works out.

What happens when a surveyor is ill on the visit day?

The office opens the visit and swaps the surveyor for someone the calendar shows free that day, or moves the visit. The change reaches the party and, where needed, the client by message. The new name then shows on it.

How does a visit needing a second party show?

The visit is marked as needing two parties, and the calendar shows whether the second is booked. That list is read first. A job waiting for its second party stays visible until one is named.

Where it fits

How this feature fits the system.

Land Surveyor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Document checklist and village records

Deeds, extracts and sketches are stored on the job, and missing papers show before the field party leaves.

Project Document Management

Field crew and instrument calendar

Surveyors and instruments are assigned by day, so two jobs do not claim the same set.

Technician Scheduling

Drawing revisions and review

A drawing moves from draughtsman to reviewer to client, and each step is dated.

Workflow and Approvals
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements