Skip to main content
GullySystem

Client sign-off and certified copies for surveys

A signed plan is the point at which a survey becomes a deliverable. This feature records who approved the plan and when, then logs every stamped copy issued from it. A request for another copy, months later, starts from a trail and not from memory. Reception and the principal both use it.

What a sign-off and a copy log hold

Two linked records sit here. One is the approval of a plan version by the client. The other is a log of stamped copies printed from that version. Both hang from the job and name the people involved.

Who approved the plan

The name of the approving client is recorded, with the name of anyone signing for a company, a bank or a family. A partition plan between relatives may carry several signatures. Each signatory is listed.

The version that was signed

The sign-off points to one drawing version, by number and date. Later copies are taken from that version alone. No earlier draft can be mistaken for it. Revision 3, for example, stays revision 3 in every record.

Date and manner of approval

The date is entered, with how the approval came, such as a signed printout, an email or a reply on a messaging app. The scan or message is attached. The firm can show what it holds as proof.

Each stamped copy issued

Every stamped copy is entered with its copy number, the date, the person who received it and the reason. A bank’s copy and a buyer’s copy appear as separate lines. Extra copies are counted. A reprint is a new line, not an overwrite.

From approved plan to stamped copies

Approval and copying come after the drawing is finished. Clients also come back at this stage, asking for one more copy. Four moments show how the records are made and used. The example is a boundary plan for a sale. Read them in order.

The client approves a version

A client visits the office, looks at the printed plan and signs it in front of the principal. Reception scans it, records the name and date and marks that version as the signed one. The job moves to delivery.

The first stamped copies

A buyer and the buyer’s bank each want a stamped copy. Staff print both from the signed version, the principal stamps and signs them, and two lines go into the log. Each line names who took the copy.

A request for another copy

A buyer returns, having lost a copy. Reception opens the job, finds the signed version and the earlier log, and sees which copies went to whom. A new copy is printed and logged as a reissue.

The extra copy on the bill

An extra copy is logged against the job. Accounts sees it there and adds a charge for extra copies, as the fee stages allow. Giving a copy free becomes a choice the principal makes, not an oversight.

Who signs, stamps and records

Four people stand in the chain from approval to copy. The client signs, the principal stamps, reception records and accounts bills. Each sees the part of the trail that concerns them. Roles are set when the system is arranged.

Office and reception

Reception records the approval, scans the signed paper and logs each copy handed out. When a client asks which version they signed, the answer is read from the job. Copies are counted as they leave.

The principal surveyor

Stamping and signing each certified copy falls to the principal, who sees the log of copies issued. Drawings awaiting client sign-off are listed, so a plan waiting for a signature is chased. Stamp use stays with the principal.

Accounts and billing

Accounts reads the copy log to see which extra copies carry a charge. A log line with no matching bill is a copy given away. Charges are raised on the same job as the other stage fees. Nothing is billed twice.

Draughtsmen and the drawing office

Draughtsmen see which version was signed, so any later correction or reprint starts from the right file. Changes become new versions. The old signed mark stays in place until the client signs the new version.

Settling approval and copy rules before set-up

These rules touch the firm’s stamp, so settle them with the principal surveyor. Four points need an answer. Write them into the roles and the plan header. Accounts should hear the answers too.

Who may record a sign-off

Decide who may record an approval or mark a version as signed, and who may change that mark afterwards. A wrong mark sends every later copy to the wrong drawing. Limit the right to reception and the principal.

What counts as approval for client sign off and certified copies

Agree what the firm accepts as approval, such as a signed printout, a message or an email. Whatever is chosen, the proof is attached. Whether it satisfies a bank or a court is for the client’s adviser to say.

How earlier copies come across

Copies issued before the system begins cannot all be listed. Enter signed plans for open jobs and add a note that earlier copies went out, with the best date the file allows. New copies are logged from the first day.

Which list matters first for client sign off and certified copies

Start with drawings awaiting client sign-off. It shows which plans are stuck for want of a signature. The copy log comes next, once accounts begins to use it. Pending signatures delay both delivery and billing.

How sign-off and copies link to other records

Sign-off sits at the end of the drawing step and the start of billing. It reads the version marked signed and gives the copy log to accounts. Five links join it to the other records. They are listed below. A client who calls is answered from the same records.

  • Signed version mark comes from drawing revisions
  • Extra stamped copies become lines on the invoice
  • Approval date closes the drawing stage on the job
  • Copy requests reach the archive through the same job
  • Plan header and stamp text come from firm forms

Where sign-off and copy records stop

The log records who approved a plan and which copies were issued. It does not stamp a copy, confirm a signature is genuine or decide whether a bank, a court or any authority accepts it. Those matters rest with the principal surveyor and the client’s adviser. A firm that issues a handful of copies a year may keep a plain register book. It suits firms asked for copies repeatedly.

FAQ

Frequently asked questions

Can a plan have more than one approver?

Yes, a plan for a family partition or a company can list each signatory with the date each signed. The version is marked signed once the last approval is in. Who counts as last is the firm’s rule.

What does the log show for a reissued copy?

A reissue is a new line with its own date, the person who asked and the reason, such as a lost original or a bank’s request. Earlier lines stay untouched. The office can see the count of copies issued and to whom.

Does the system apply the stamp or signature?

No, the principal applies the stamp and signature on paper or on the file in the firm’s usual way. The system records that it happened, on what date and for which version. It adds no stamp of its own.

How do we stop a draft being copied by mistake?

Each copy is logged against a version number, and the signed version is marked on the job for everyone to see. A line naming any other version stands out. Staff check that line before the stamp goes on.

Can reception tell a caller who holds copies?

Reception opens the copy log and reads the lines with the date, the copy and the recipient’s name. What may be said to a caller who is not the client is a rule the firm sets. Privacy stays with the firm.

Where it fits

How this feature fits the system.

Land Surveyor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Document checklist and village records

Deeds, extracts and sketches are stored on the job, and missing papers show before the field party leaves.

Project Document Management

Field crew and instrument calendar

Surveyors and instruments are assigned by day, so two jobs do not claim the same set.

Technician Scheduling

Drawing revisions and review

A drawing moves from draughtsman to reviewer to client, and each step is dated.

Workflow and Approvals
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements