Fee stages, revisits and invoices for surveys
Survey fees are earned in steps, so they are billed in steps. This feature sets fees by stage for each job type, adds revisit charges and extra copies, raises invoices and records payments against the job. Accounts sees what is owed. The principal sees what was done but never billed.
What a fee stage and an invoice record
A fee has three layers. The stage fee is set for the job type. Added charges sit on top for revisits and extra copies. Invoices and receipts record what was billed and what came in. Four items hold the detail. Each hangs from one job.
A job billed from first visit to last copy
Billing follows the work from the first quotation to the last certified copy. At each step a different person acts. Four moments from one job show where money is claimed or missed. The job is a layout for a builder. Take them in turn.
Who raises, approves and reads the fees
Money matters are split between a few seats. Accounts raises and records, the principal approves and reads, and reception answers the client. Four seats are described.
Settling fee stages before set-up
Fee stages should match how the firm quotes. Sit with the principal surveyor and accounts, with the rate card in hand. Four questions need an answer. The system holds the figures but does not choose them.
How fees link to other survey records
Fees read from nearly every other part of the job. Visits, drawings and copies each lead to a billable stage, and payments flow back to the job record. The ledger export hands the figures on. Five links are worth naming. Accounts and the principal read the same balance.
- Job type selects the stage fees to apply
- Completed visits on the calendar prompt stage invoices
- Extra copies logged at sign-off become charge lines
- Drawing stage completion marks the next fee stage due
- Ledger export and payment links connect to outside tools
Where fee billing stops
This feature prices stages, records charges and tracks payments against a job. It does not prepare accounts, file tax returns or decide how a tax line should read. Those belong to the firm’s accountant. Payments arrive by bank transfer or through a provider’s own link, so nothing is held here. A one-person surveyor who bills a few jobs a month may manage with an invoice template.
Frequently asked questions
Can fees differ between a boundary and a layout job?
Yes, each job type has its own stages and amounts, set when the system is arranged. A boundary job may bill the visit, the drawing and the copies, while a layout job bills by round of staking. That choice is the firm’s.
How is a revisit charge decided?
The firm sets the rule at the start. A revisit caused by a client’s change can carry a charge, while one caused by the firm’s own error may be marked free. The person who waives it is named on the line.
Can one invoice cover several stages at once?
Yes, accounts can raise one invoice for the visit and the drawing together, with each stage kept on its own line for the client to read. Part payments are recorded against what they settle. Each line keeps its own balance.
Does the invoice show the firm’s registration details?
Yes, invoices, quotations and covering letters carry the registration details and wording the firm supplies at set-up. The layout is arranged once. Stamp text is handled the same way.
What if a client pays only part of an invoice?
The part payment is recorded against the invoice with its date, its method and the name of the person who entered it. What remains stays outstanding. It shows in fees billed, received and outstanding by job. A reminder can follow by message.
How this feature fits the system.
Land Surveyor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Document checklist and village records
Deeds, extracts and sketches are stored on the job, and missing papers show before the field party leaves.
Project Document ManagementField crew and instrument calendar
Surveyors and instruments are assigned by day, so two jobs do not claim the same set.
Technician SchedulingDrawing revisions and review
A drawing moves from draughtsman to reviewer to client, and each step is dated.
Workflow and ApprovalsTrades that use it
Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements