Skip to main content
GullySystem

Pit, bench and stockpile records for mines

Sites, benches and stockpiles gives a mine or quarry one record for every working location. The owner sets up each pit with its benches, ramps and stockpiles, then reads output, stock and material moved by grade. Supervisors, clerks and the office all work from that same layout.

What a pit and stockpile record holds

A site is recorded from the ground up. The pit comes first, then the benches cut into it, the ramps that join them and the stockpiles where material waits. Every level carries the name that crews already say aloud at handover.

Pits, quarries and workings

Each working gets its own record, whether open-cast, a quarry face or an underground section. The record holds the site name, the materials it yields and the machines allowed to work there. Underground sections keep their own entry.

Benches and connecting ramps

Benches are listed under their pit, with the ramps that join them. Output is read bench by bench. Stripping on an upper bench stays apart from ore taken lower down the face, and the manager sees both.

Stockpiles and their grades

A stockpile carries a material and a grade, such as fines, six-millimetre chips or overburden. Stock is shown pile by pile. A weighed dispatch from the gate lowers the exact pile it came from, grade by grade.

Material moved by location

Output, stock and material moved are read for every location and split by grade. Compare one bench with another. Or set pit against pit, using entries made at the face rather than figures typed in the office.

A supervisor’s week across benches and piles

Records earn their keep when work moves. Say a bench is stripped, a ramp is extended, a pile grows at the crusher and shrinks at the gate. These four moments show who touches the record, and what each person needs from it.

Planning the shift at the office

The supervisor picks the benches that will work this shift and the machines that go to each, including the dozer on the ramp. Drilling and stripping are planned per bench. Operators see their assigned machine for the day.

A bench closes and another opens

When a bench is worked out, a new one is added beneath it. Old entries stay under the old bench. Nothing needs retyping, and next week’s output simply starts to appear under the new name.

Loads leaving a stockpile

The weighbridge clerk books each load against a buyer and a pile. The pile falls by the net weight. Gross and tare stay on the ticket. At evening handover the supervisor reads what is left of each grade.

Walking the piles for stock

Someone from the store walks the stockpiles and compares the ground with the figure on screen. A gap is written beside that pile. Then the manager asks the supervisor of that shift what happened to it.

Who reads the site record, and what they see

Everyone sees the same pits, benches and piles, but each person opens them for a different reason. The screens are arranged around the job. A driver is not shown stock values, and a manager is not asked for a bench name.

For owners and managers

Owners see output, stock and material moved by site and by period. Two pits can be set side by side. A bench that moves little material for the machines working it is easy to spot.

For shift supervisors

The supervisor plans the shift against benches and sees which machines are working, waiting or under repair on each one. Handover notes name the bench and the pile. The next supervisor starts from those notes, with no phone call to the last shift.

For operators and drivers

A driver sees the machine assigned for the day and the bench to work. Trips are logged against it from a phone. No slip needs decoding later, and no bench name is guessed by the office.

For the mine office

The office reads stock by grade before quoting a buyer. It also checks that the pile named on a weighed ticket held that material. A mismatch is raised first. Only then does an invoice go out.

Decisions to settle before setting up pits and piles

A site layout is cheap to enter and awkward to rename later. A few choices are worth settling first. These four are best agreed with the owner and the senior supervisor in the room together.

Who may change a record for sites benches and stockpiles

Decide who can add a bench, close one or rename a stockpile. Give that to the manager and one supervisor. Operators only choose from the list. Changes are then made on purpose, not by accident.

What is left out first

Not every heap needs a record. Decide whether temporary dumps, waste rock or a small sample pile are tracked or left off for now. A shorter list is easier to keep right during the first weeks.

How present stock comes across for sites benches and stockpiles

Your stockpile counts are loaded from the existing sheet. The site clerk reads them over. Only after that is the first shift logged. Agree which date the opening count is taken and who signs it off.

Which report matters first for sites benches and stockpiles

Pick one view to read at each handover from the start, such as stock by grade for each pile or output by bench. Get that right first. Add the others once the figures are trusted.

How site records join the product

The site layout is the frame for every other record. Trips, loads, tickets and machine hours all name a location. So what is entered here appears again in the shift log, the weighbridge and the reports, without being typed twice. One entry serves them all.

  • Shift output and haul log takes its benches from here
  • Weighbridge and dispatch lowers the stockpile named on each ticket
  • Equipment register and hours lists machines allowed on each pit
  • Reports and dashboards read output and stock by location
  • Invoices follow the material and grade sold from each pile

Where site records stop

This feature records where material sits and how much of it moved. It does not design the pit. Mine planning, geological modelling and survey volumes stay with specialist engineering software and the people who run it. Stock counts on the ground remain a human job, and the figure on screen is only as good as the entries behind it. A very small quarry with one face and one pile may manage on a sheet.

FAQ

Frequently asked questions

Can one site hold several pits and quarries?

Yes, each pit, quarry or working has its own record with its own benches and stockpiles. The manager can read them one at a time or compare two side by side. Machines are listed against the location they work.

Does the system calculate stockpile volumes by survey?

No, it does not. Stock here comes from entries: output added to a pile and weighed dispatches taken off. A survey volume belongs to your surveyor or planning software, and its result can be compared with the figure shown.

Can grades be named the way our crews say them?

Yes, materials and grades are entered using the names supervisors already use, such as overburden, fines or six-millimetre chips. Reports show those same names. Nobody has to translate a code back into a heap, and the grade on a ticket matches the grade on the pile.

What happens to a bench once it is worked out?

It is marked closed. The bench stays in the history. Earlier output, hours and loads remain under that bench, so past comparisons still read correctly. Only the new bench receives entries from the next shift onward.

Do we need every small dump set up as a stockpile?

Not every one. Set up the piles you sell from, count or report on. Temporary dumps and waste rock can wait. Add them later, once the main stockpiles are being kept right and the crews trust the figures.

Where it fits

How this feature fits the system.

Mining Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Equipment register and hours

Each loader, truck, drill and crusher is held with its operator, hours and service due date, so planners see what is available.

Fixed Asset Register

Maintenance and breakdown jobs

A job card records the fault, the mechanic, parts fitted and hours spent, and the repair history stays with that machine.

Job Cards

Fuel, spares and store

Diesel, tyres, bits and lubricants are booked in and issued against a machine, and an alert shows when a fast-moving spare falls low.

Stock Tracking and Alerts
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements