Skip to main content
GullySystem

Stage Payments and Billing for Modular Kitchens

A kitchen is paid for in stages, and each stage carries its own invoice and receipt. The balance due is read from the project, not from a notebook.

Stages on a kitchen project

Your own practice decides how many stages you use. Three or four are common.

Advance at approval

Taken when the client accepts a drawing revision and quote. This stage opens the work order for the factory.

Before dispatch

Raised when units are packed and ready to leave the workshop, so material is not sent out against a project that has paid nothing since the advance. Dispatch waits on it.

At handover

The balance, raised when fitting is finished. Open snags can be shown beside it.

Extras after approval

Units or upgrades added in a later revision are billed on their own, with the revision number quoted on the invoice.

Invoices and receipts

A GST invoice follows the accepted quote, so the unit list and the bill describe one kitchen. Cash, UPI, cheque, card and bank transfer are all recorded against the project with a receipt number. A client ledger shows what was invoiced, what came in and what is still due. Reminders go out by message. How tax applies to your work is for your accountant to settle.

Who works on billing

Accounts staff

Raise stage invoices, enter receipts, send reminders and keep the client ledger current.

Owner

Reads the balance standing against every live kitchen and what has been collected this month.

Designers

See whether a client has cleared the stage that releases dispatch. They do not edit invoices.

Why kitchens are paid in stages

Money goes out early on a kitchen, because boards and hardware are bought before the client sees a finished wall.

Cash is needed before cutting

Plywood, laminate and hardware are bought on the strength of the advance. A weak advance leaves the showroom funding the client.

Orders cannot be reversed once cut

A panel with holes drilled for one client’s hinges is hard to resell. That is why showrooms tie the first stage to design sign-off.

Splits differ from showroom to showroom

Sample quotations seen online run from a heavy advance and a small final payment to a more even three-way split. No fixed norm exists, so the stage table is yours to set.

Questions to settle before the first invoice

These decisions are cheap to make early and awkward to change later.

Which stage releases dispatch?

Pick one stage, such as the one before dispatch, and mark it. The store then sees a warning when it is unpaid.

What happens to a part payment?

Decide whether a half-paid stage lets work continue. The software records the rule you choose.

How are extras billed?

Say whether a unit added after approval waits for the final bill or gets its own invoice.

Who may waive a balance?

Limit write-offs to one person and keep the reason on file.

Reading the client ledger

The ledger is the page an accounts person opens when a client rings to ask how much is left.

Invoiced

Every stage invoice with its revision number and date.

Received

Each receipt with its mode and reference, including several against one stage.

Due

The running balance, with overdue stages flagged and the next reminder date.

A worked order of billing events on one kitchen

Picture a straight kitchen of twelve running feet. The designer marks the revision approved, and accounts raises the advance invoice from the accepted quote. A receipt follows when the client pays by transfer. Weeks later the workshop packs the units, and the pre-dispatch invoice goes out with a link. The store sees the stage unpaid and holds the vehicle. Payment arrives, dispatch is released, and fitting begins. At handover the last invoice is raised, snags are listed beside it, and the ledger closes when the balance reaches zero. Each step is a record, so nobody reconstructs the story from a bank statement.

What billing does not cover

  • It is not an accounting package and does not file returns
  • Tax rates and treatment are confirmed by your accountant
  • Payment stages and reminder wording are decided with you
  • Figures reach Tally only through an export that is quoted separately

Stage payments across a kitchen project

A kitchen’s money moves over weeks, in step with the work. This page follows one project from the first advance to the final balance. It shows who raises each invoice and who checks the receipt. The pattern is regular. Each stage closes with a figure that both sides can read.

The advance at approval

When the client approves the design, the showroom manager raises the first invoice and takes the advance. A receipt is printed with the amount and the stage it covers. The work order opens only after this entry. The sequence cannot be skipped.

Billing as the factory finishes

When production is marked complete, the accounts person raises the invoice for the next stage. The invoice names the stage and the amount, and the balance is read from the project. The client need not recall the figures.

The client pays in two parts

A client pays part by transfer and part by cheque. The accounts person enters both against the same stage invoice. The balance shows what is due. A follow-up call then quotes a real figure, not a guess from memory.

The final bill at handover

On the day of handover the manager opens the client ledger and reads every invoice and receipt. Any extra work done on site is billed as a separate line. Keys change hands last. A small balance is never argued at the door.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Invoices and receipts

Can you explain the balance from its original documents?

Select a partly settled example in “Invoices and receipts”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

Before dispatch

Can a partial delivery be distinguished from a completed order?

For “Before dispatch”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

FAQ

Frequently asked questions

Can the number of stages differ by project?

Yes. A default set is loaded for your showroom, and a particular project can carry more or fewer stages.

Does dispatch wait for payment?

It can. A stage can be marked as the one that releases dispatch, and the store is warned when it is unpaid.

Are part payments recorded?

Yes. Several receipts can sit against one stage invoice, and the ledger carries the running balance.

Will our accountant be able to work from this?

Your accountant can read sales, receipts and purchase figures inside GullySystem. An export in a layout they ask for is priced on its own.

Can a stage be billed before the work is done?

Yes, if that is your terms of sale. The invoice simply carries the stage name, and your staff decide when to raise it.

How are cheque bounces handled?

The receipt is reversed with a reason, the balance rises again, and the stage shows as unpaid. A reminder can then go out.

Can the client see the ledger?

The project prints a statement or sends it on. Clients do not get a login unless you ask for that to be built.

Does the advance have a fixed share of the quote?

No. The share is a rule you enter once, and nothing in the software forces a particular split.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements