Skip to main content
GullySystem

Design Approval and Advance for Modular Kitchens

Approval is the point where a kitchen stops being a proposal. The accepted revision, the advance and the work order are recorded together on the project.

What approval records

Three things are fixed at once, and all three are read later when a dispute comes up.

The accepted revision

The layout version the client signed off is flagged, along with who marked it and when. Other versions remain visible but inactive.

The accepted quote

The quote version that goes with that revision is locked to the project, so the unit list and the bill describe the same kitchen.

The advance

Amount received, the mode and the receipt number. Payment by UPI, cheque or transfer is noted the same way.

Client confirmation

A signed printout, an email or a message reply is attached as the record of consent.

Opening the work order

Once the advance is in, a work order opens against the project and carries the approved unit list to the factory. It names the delivery window discussed with the client and the fitting team pencilled in. Production cannot begin without it. Where your showroom starts cutting on a part advance, the trigger amount is set at implementation and applied to every project the same way.

Who acts at this stage

Designers

Mark the revision and quote the client accepted, and attach the confirmation received.

Accounts staff

Enter the advance against the project and issue the receipt the client asks for.

Factory in-charge

Picks up the work order, reads the unit list and plans cutting around the other orders already in hand.

Why approval is treated as a hard line

Production money is spent from this moment, so the record has to be complete.

Boards are bought against it

Purchase staff order sheets on the strength of the unit list, and a change afterwards can leave stock unused.

Factories treat it as locked

Once cutting starts, a design change means new panels, so firms charge for post-sign-off changes.

Cancellations get awkward

Some firms state that an order cannot be cancelled once material goes into production. If you do, the client should have seen it in writing.

Checklist before marking a revision approved

Run through it with the client at the desk.

Unit list read aloud

Walk through each wall, not the whole kitchen at once.

Finish and hardware confirmed

Shade codes and brands are named, since these are what a client later disputes.

Appliance models final

Cut-outs depend on them.

Delivery window understood

The client knows it starts from the advance, not from the design.

Where the paperwork sits

A dispute is settled with documents, so keep them together.

Printed sign-off

A signed copy of the drawing and quote, photographed and attached.

Message trail

Confirmation by message, with the time it arrived.

Receipt

The advance receipt, with mode and reference.

Handling a client who wants to change after approval

It happens on most projects. A client sees the cutting begin and remembers a drawer they wanted deeper. The right response is calm and written down. The designer opens a new revision, notes the request and prices the difference. The factory in-charge checks whether the affected panels have been cut. If they have not, the change costs only drawing time. If they have, the cost of recutting is stated before the client says yes. Whatever the answer, the original approval stays on file, because a dispute is about what was agreed first. A short message trail beats a long phone call every time.

What stays outside this step

  • It does not collect payment; it records what was received
  • Contract wording and terms of sale remain your own documents
  • How much advance starts production is your rule
  • Tax treatment of an advance is for your accountant to advise

Advance receipts and balance stages for a kitchen

An advance is only the first payment. The balance falls due at stages the client can follow, such as material arrival, carcass fitting and handover, and the quote should list them so nobody argues later. Write them before the advance.

Advance receipt details

Every payment gets a line. It shows amount, date, mode and receiver, and a part cash payment is entered as its own line, so accounts staff can match each payment to the project. The receipt number stays on file.

Balance on material arrival

Arrival can trigger payment. A second payment can be tied to boards and hardware reaching the factory floor, and the project shows what has arrived, so the client sees why the request came. The reason is on the page.

Payment before fitting

Fitting waits for money. Where your rule asks for it, the stage amount must be in before the job card opens, and the office tells a client who has not paid. The job card shows the status.

Final payment at handover

Handover closes the account. The last instalment is collected after the client inspects the finished kitchen and signs the handover note, and snag points go on a list with a date for each fix. Holding back a small amount is your rule.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

The accepted revision

Which version applies to work that has already started?

Use a revised example from “The accepted revision” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Opening the work order

Is the plan based on demand that is still open?

Review “Opening the work order” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

FAQ

Frequently asked questions

Can production start on a part advance?

Yes, where your rule allows it. The amount that opens a work order is set once and used on every project.

Is the client signature stored?

Yes. A scan, photograph or message reply attaches to the approved revision and stays with the project.

What if the client later disputes the design?

The approved revision carries its date and the confirmation received. The client views both together, next to you.

Can an approval be withdrawn?

An approval can be reversed by a person with that right, and the change is logged. Work already cut is a commercial matter between you and the client.

Does approval lock the price?

The quote version attached to the approved revision stays fixed. A later change opens a new version and shows its own difference.

Who is allowed to mark approval?

Only people given that right. It is commonly a senior designer or the owner, and the choice is made at set-up.

What if the advance arrives before the design is final?

It is recorded as received against the project, and the work order stays closed until an approval is also marked.

Can the client approve over a message?

Yes, a reply to the message sent from the revision is stored. Some showrooms still insist on a signature as well.

Where it fits

How this feature fits the system.

Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Showroom enquiries and site visits

Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.

Lead Management

Quotations by unit and running feet

Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.

Estimate/Quotation Management

Production job cards

Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.

Job Cards
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements