Design Approval and Advance for Modular Kitchens
Approval is the point where a kitchen stops being a proposal. The accepted revision, the advance and the work order are recorded together on the project.
What approval records
Three things are fixed at once, and all three are read later when a dispute comes up.
Opening the work order
Once the advance is in, a work order opens against the project and carries the approved unit list to the factory. It names the delivery window discussed with the client and the fitting team pencilled in. Production cannot begin without it. Where your showroom starts cutting on a part advance, the trigger amount is set at implementation and applied to every project the same way.
Who acts at this stage
Why approval is treated as a hard line
Production money is spent from this moment, so the record has to be complete.
Checklist before marking a revision approved
Run through it with the client at the desk.
Where the paperwork sits
A dispute is settled with documents, so keep them together.
Handling a client who wants to change after approval
It happens on most projects. A client sees the cutting begin and remembers a drawer they wanted deeper. The right response is calm and written down. The designer opens a new revision, notes the request and prices the difference. The factory in-charge checks whether the affected panels have been cut. If they have not, the change costs only drawing time. If they have, the cost of recutting is stated before the client says yes. Whatever the answer, the original approval stays on file, because a dispute is about what was agreed first. A short message trail beats a long phone call every time.
What stays outside this step
- It does not collect payment; it records what was received
- Contract wording and terms of sale remain your own documents
- How much advance starts production is your rule
- Tax treatment of an advance is for your accountant to advise
Advance receipts and balance stages for a kitchen
An advance is only the first payment. The balance falls due at stages the client can follow, such as material arrival, carcass fitting and handover, and the quote should list them so nobody argues later. Write them before the advance.
Questions to settle before rollout.
Use a representative scenario to decide what this part of the system must show and where review is still needed.
The accepted revision
Which version applies to work that has already started?
Use a revised example from “The accepted revision” in the demonstration. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Opening the work order
Is the plan based on demand that is still open?
Review “Opening the work order” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Frequently asked questions
Can production start on a part advance?
Yes, where your rule allows it. The amount that opens a work order is set once and used on every project.
Is the client signature stored?
Yes. A scan, photograph or message reply attaches to the approved revision and stays with the project.
What if the client later disputes the design?
The approved revision carries its date and the confirmation received. The client views both together, next to you.
Can an approval be withdrawn?
An approval can be reversed by a person with that right, and the change is logged. Work already cut is a commercial matter between you and the client.
Does approval lock the price?
The quote version attached to the approved revision stays fixed. A later change opens a new version and shows its own difference.
Who is allowed to mark approval?
Only people given that right. It is commonly a senior designer or the owner, and the choice is made at set-up.
What if the advance arrives before the design is final?
It is recorded as received against the project, and the work order stays closed until an approval is also marked.
Can the client approve over a message?
Yes, a reply to the message sent from the revision is stored. Some showrooms still insist on a signature as well.
How this feature fits the system.
Modular Kitchen Business Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Showroom enquiries and site visits
Showroom staff record the client, the flat or site, the kitchen shape discussed, the referrer and the measurement visit that has been booked.
Lead ManagementQuotations by unit and running feet
Quotes price each base, wall, tall and loft unit with finish and hardware, plus countertop, hood, hob and sink, and every version is retained.
Estimate/Quotation ManagementProduction job cards
Each unit gets a production job card following cutting, edge banding, drilling, assembly and packing, with the worker or machine noted at every stage.
Job CardsTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements