Daily well readings and production volumes
Pumpers key tank levels, tubing and casing pressures, run hours and exceptions for each wellhead and battery on a tablet or handset. The office reads daily volumes by well and facility from those entries. Gaps are visible. A well without a reading stays on the route sheet until someone enters it.
What a reading sheet records for each site
A reading sheet is built for the type of site, so a pumper is asked only for what that site has. A wellhead, a tank battery and a compressor station each get their own. Units stay as entered. Barrels, thousand cubic feet and psi are not converted.
A route through the pads, from first light
A route is the list of wells and facilities one pumper visits in a round. The sheet follows that list. The office watches it fill. Four moments from a day in the field and the office show it at work.
Who keys the figures and who reads them
The people who enter readings are rarely the people who study them. Each group gets its own view. All of them are built from the same entries made at the wellhead.
Decisions to settle before readings start
The reading sheet is only as good as the questions it asks. Four decisions are best made with the pumpers themselves, since they know which gauges stick and which pads are hard to reach. Make them before the first route goes live.
What readings hand to the rest of the product
Readings are not a stand-alone log. The figures keyed at the wellhead are read again by other features in the product. Each hand-off removes a piece of retyping at the office, and each starts from the same entry. Five of them are listed in the lines below.
- Run hours move equipment servicing due dates
- Exceptions become service jobs with a crew
- Daily volumes sit beside costs charged to each well
- Partner statements read volumes for each well and period
- Gauge and sensor feeds can supply entries by arrangement
Where daily readings stop
This feature records and reports. It does not control equipment, and it does not run allocation calculations or reservoir models. Your SCADA, historian and engineering tools keep that work. It also cannot take entries while a handset has no connection. A single owner who checks one gauge a week may be content with a notebook.
Frequently asked questions
Which units does a pumper enter readings in?
Your engineers’ own units, as used in the field today. Barrels, thousand cubic feet and psi stay exactly as entered. Each site type’s sheet is set up in that language. Nothing is converted behind the pumper’s back.
What shows when a pumper skips a well?
The route sheet lists the well as outstanding. Operations staff also read a report of wells and routes with readings missing. Someone out of range simply enters the figures later, once reconnected. The gap is visible to everyone.
Do run hours entered here set maintenance dates?
Yes, run hours do. Hours come from the daily reading, so the due date for a compressor moves with the machine. Servicing set by a calendar interval, as for a separator, does not depend on the reading at all.
Can sensor readings replace keyed entries?
Gauge and sensor feeds are an optional integration, priced as separate parts and agreed during scoping. Sites without a feed keep keyed entry. Both kinds can sit on the same route sheet without any special handling.
Can we see one well’s history of pressures?
Yes, by date. Entries are kept against the well with their dates, so a planner or manager can read the sequence. A drifting tubing pressure is then noticed sooner than it would be from paper sheets.
How this feature fits the system.
Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Wells, pads and facilities
Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.
Fixed Asset RegisterField tickets and service jobs
A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.
Work Order ManagementEquipment and preventive maintenance
Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements