Preventive maintenance for pumpjacks and compressors
Each pumpjack, compressor, separator and heater treater carries its own servicing schedule, set by run hours or by calendar date. Overdue work shows first. Every repair is written on the machine, so the next planner reads its history instead of rebuilding it from memory. Spares and crews are reserved from the same screen.
What a machine’s maintenance record holds
Each machine has its own record. It sits apart from the well the machine stands on. Planners, crews and managers read it to learn what has been done to the machine, which tasks were carried out and what falls due next.
A planner’s week of pumpjack and compressor servicing
Maintenance planning follows a weekly rhythm of lists, parts and crews, and the record sits under each part of it. Planners rarely repair anything personally. Four moments across one week show how the record guides each step, from the first list to the last note.
Who plans, services and signs off the machines
Maintenance touches the field, the yard and the office. No two groups need quite the same slice of the machine record kept for each pumpjack and compressor. Each slice comes from the same entries.
Decisions to settle before servicing plans start
A maintenance schedule is only as good as its starting data. Four decisions, taken with the planners and the pumpers together, decide how clean that start will be. Decide them before the first plan is saved.
How servicing links to the rest of the product
Servicing takes from the asset tree and the readings, and gives to jobs, stores and cost. Because it sits in the middle, a change in one place moves the others in daily use of the product. Look at five links. They show how far the schedule reaches.
- Machines are taken from each well and facility record
- Run hours arrive from the daily wellhead readings
- Parts for each service are reserved from stores
- Servicing and repairs are raised as jobs with crews
- Repair cost is charged back to the well
Where equipment maintenance stops
The schedule records and reminds. It does not decide the right service interval for a machine, which belongs to the manufacturer and your engineers. It does not monitor vibration or diagnose faults. Warranty claims stay with the owner and the supplier. A single pumpjack on one lease may be well served by a diary on the office wall.
Frequently asked questions
What if a compressor has no working hour meter?
Use a calendar interval for that machine. Run hours reach the schedule from the daily wellhead reading, so a machine without a meter cannot be driven by hours. Dates still bring its service to the top of the list.
Does a contractor’s repair appear on the machine?
Yes, if the work is raised as a job against that machine. The signed ticket names the equipment. The repair is kept on its record. The next planner sees what was done, and when it happened.
Who sees the list of overdue servicing?
Planners and operations managers see it on their screens, with overdue work first. Pumpers see jobs raised for their own wells. The list is the same list for everyone, so there is one argument less.
Can we load our existing service history?
The equipment register comes across from your spreadsheets. Service history is a matter to agree at set-up. Recent repairs are worth keying onto each machine. Older paper cards can stay filed where they are for reference.
Can outside firms service our machines?
Yes, outside firms can service them. The foreman assigns a contractor and attaches the approved purchase order to the job. The signed ticket then lands on the machine record, beside the repairs done by your own crews.
How this feature fits the system.
Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Wells, pads and facilities
Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.
Fixed Asset RegisterField tickets and service jobs
A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.
Work Order ManagementEquipment and preventive maintenance
Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements