Preventive maintenance for pumpjacks and compressors

Each pumpjack, compressor, separator and heater treater carries its own servicing schedule, set by run hours or by calendar date. Overdue work shows first. Every repair is written on the machine, so the next planner reads its history instead of rebuilding it from memory. Spares and crews are reserved from the same screen.

What a machine’s maintenance record holds

Each machine has its own record. It sits apart from the well the machine stands on. Planners, crews and managers read it to learn what has been done to the machine, which tasks were carried out and what falls due next.

Service plans by hours or date

A compressor can fall due at a set number of run hours, a separator at a calendar interval. Each plan lists the tasks, such as an oil change or a filter swap. The trigger is chosen per machine.

Run hours from the readings

Hours come from the daily reading entered at the wellhead, so a due date moves with the machine. Any compressor that ran harder than the plan assumed falls due sooner. Nobody recalculates dates by hand.

Repairs kept on the machine

Every repair is written against the machine, with its date, the crew and the parts used. It stays there when the machine moves. The next planner reads that history, and does not rely on someone’s memory.

Overdue and upcoming lists

Services due are listed by run hours and by date, with overdue work first. A planner opens one list for compressors and pumpjacks together. That is the working view. It carries the plan for the week ahead.

A planner’s week of pumpjack and compressor servicing

Maintenance planning follows a weekly rhythm of lists, parts and crews, and the record sits under each part of it. Planners rarely repair anything personally. Four moments across one week show how the record guides each step, from the first list to the last note.

Reading the service list

Early in the week a planner opens services due and sees overdue work at the top. Compressor C-02 comes first. Its history is read before anyone decides whether it needs a full service or only an inspection.

Reserving spares and crews

The planner reserves seals and filters from stores for each due service and assigns a crew. What is on the truck is on record. No crew goes to a pad until the part is confirmed.

The crew at the machine

A crew services the compressor and records what was done. The entry lands on the machine, with the date and the crew. Run hours at the time are noted. That sets the next due point.

After a breakdown

A pumpjack fails on a Thursday and a pumper raises a job against it. Before sending a crew out to the pad, the planner reads the machine’s earlier repairs. Repeated seal changes suggest a cause worth chasing.

Who plans, services and signs off the machines

Maintenance touches the field, the yard and the office. No two groups need quite the same slice of the machine record kept for each pumpjack and compressor. Each slice comes from the same entries.

Planners owning the schedule

Planners set the service plans, read what each compressor and separator has had done and assign crews. They hold the list of overdue work and clear it. Spares are reserved against each service they raise.

Pumpers reporting condition

Pumpers enter run hours and exceptions at each wellhead, and raise a job when a pumpjack, a tank or a line needs attention. Their notes decide which machine the planner looks at next. They need not know the plan.

Managers reading what is due

Operations managers read services due this week and the cost carried by each well. A tile points to the machine due first. Cost by job type shows whether servicing or repair is the heavier load.

Stores issuing parts

Stores hold the seals, valves and filters a service needs, counted by yard and by truck. They issue them to the job and reorder when stock falls to its reorder level. A reserved part stays reserved for that service.

Decisions to settle before servicing plans start

A maintenance schedule is only as good as its starting data. Four decisions, taken with the planners and the pumpers together, decide how clean that start will be. Decide them before the first plan is saved.

Who may change a plan for equipment and preventive maintenance

Decide who may alter a service interval or switch a machine from hours to dates. A planner may propose it. A manager may approve it. Write the rule down so intervals do not drift by quiet agreement.

Which machines get plans

List the machines that carry a plan and those that run until they fail. A small transfer pump may be left out. A compressor never is. Record the choice so nobody wonders why a machine is silent.

How the register comes across for equipment and preventive maintenance

Your spreadsheets supply the equipment register, and the production team compares it with the field before use. Old service cards may stay filed. Agree which recent repairs are worth keying onto each machine at the start.

The report to read first for equipment and preventive maintenance

Begin with compressor and pumpjack service due by run hours and date. It shows at once whether the plans are believable. One report is enough at first. Add cost per well by job type once servicing is steady.

How servicing links to the rest of the product

Servicing takes from the asset tree and the readings, and gives to jobs, stores and cost. Because it sits in the middle, a change in one place moves the others in daily use of the product. Look at five links. They show how far the schedule reaches.

  • Machines are taken from each well and facility record
  • Run hours arrive from the daily wellhead readings
  • Parts for each service are reserved from stores
  • Servicing and repairs are raised as jobs with crews
  • Repair cost is charged back to the well

Where equipment maintenance stops

The schedule records and reminds. It does not decide the right service interval for a machine, which belongs to the manufacturer and your engineers. It does not monitor vibration or diagnose faults. Warranty claims stay with the owner and the supplier. A single pumpjack on one lease may be well served by a diary on the office wall.

FAQ

Frequently asked questions

What if a compressor has no working hour meter?

Use a calendar interval for that machine. Run hours reach the schedule from the daily wellhead reading, so a machine without a meter cannot be driven by hours. Dates still bring its service to the top of the list.

Does a contractor’s repair appear on the machine?

Yes, if the work is raised as a job against that machine. The signed ticket names the equipment. The repair is kept on its record. The next planner sees what was done, and when it happened.

Who sees the list of overdue servicing?

Planners and operations managers see it on their screens, with overdue work first. Pumpers see jobs raised for their own wells. The list is the same list for everyone, so there is one argument less.

Can we load our existing service history?

The equipment register comes across from your spreadsheets. Service history is a matter to agree at set-up. Recent repairs are worth keying onto each machine. Older paper cards can stay filed where they are for reference.

Can outside firms service our machines?

Yes, outside firms can service them. The foreman assigns a contractor and attaches the approved purchase order to the job. The signed ticket then lands on the machine record, beside the repairs done by your own crews.

Where it fits

How this feature fits the system.

Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Wells, pads and facilities

Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.

Fixed Asset Register

Field tickets and service jobs

A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.

Work Order Management

Equipment and preventive maintenance

Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements