Skip to main content
GullySystem

Field crew shifts and timesheets for oil operators

Hours are recorded for pumpers, roustabouts and service crews, each with a shift and a rotation. The hours are costed to the wells and jobs the crew worked. Labour cost lands on the right well. Managers read it beside the other costs that well carries.

What a crew member’s timesheet records

A timesheet is a short record with long consequences. It says who worked, when, where and on what. Every labour figure later charged to a well starts as one of these entries. Get the entries right and the cost follows.

Crew members and their roles

Each person is listed with a role, such as pumper, roustabout or service crew member, and the crew they belong to. Whoever assigns a job picks from that list. The list is kept current by the office.

Shifts and rotations

Everyone carries a shift and a rotation, which is the pattern of days on site and days away. The planner reads it before assigning work. Rest days are therefore visible when a crew is chosen.

Hours by well and job

Every entry names a well. Where there is a job, it names that too. That is what costs labour to the right place. A pumper’s round and a workover crew’s day both end on the correct well.

Totals for each period

Hours for each person are totalled for the period and read on one screen. Managers see who worked where. Finance sees the cost behind each total. The same entries serve both, with no second set of figures to reconcile.

Hours from the wellhead to the cost report

Crew hours are written by people who are tired at the end of a long shift. The record has to be quick to fill and hard to misread. Four moments follow. Each shows one part of a working week on the pads.

A pumper ends the round

At the end of a route a pumper enters hours against the wells visited. The route sheet already lists them. Entry takes a few taps on a tablet. The office does not retype figures from a notebook.

A foreman logs a workover

A workover on Well 09 takes the whole crew for the shift. The foreman records each roustabout’s hours against the well and the job. The cost lands where the work happened. It does not sink into an overhead pool.

A planner checks the rotation

Before booking a crew for next week’s pump change, the planner reads who is on rotation. Two roustabouts are away. The planner picks another crew, and nobody is sent out short of hands on the day.

An accountant costs the labour

At period end the accountant reads the labour cost by well and by job type for the whole crew. It sits with the stores issues and approved tickets for each well. Together they make the well’s total.

Who keeps the hours and who reads them

Timesheets are written in the field and read in the office. Each end asks a different question. Each screen answers the one that person is likely to ask on the day.

Pumpers entering their round

Pumpers enter the hours they spent at each wellhead and raise a job when a machine needs attention. Their screen shows their own wells and their own rotation. Nobody else’s hours appear on that screen.

Managers reading labour cost

Operations managers read cost per well by job type, with labour as one part. A well whose labour runs high against its neighbours on the same pad draws a question. The manager asks the foreman why.

Planners assigning crews

Planners read rotations and past hours when they assign a crew to a service or a repair. They avoid overloading a crew. The record shows who is available. It also shows who has just come off a rotation.

Accountants charging wells

Finance and joint interest accountants read labour charged to wells for the period. Those figures join the lease operating cost behind partner statements, where each line must be explainable. Labour must name a well, always.

Decisions to settle before hours are entered

Hours touch pay, so people care about them. Four decisions, agreed with the foremen and the accountants, keep the record fair and keep arguments short. Agree them before hours go live.

Who may edit recorded hours

Decide who may change an entry after it is saved. A foreman may correct a crew’s hours on the day. After the period closes, only a manager may. Write the rule so nobody edits a colleague’s hours quietly.

Whose hours are left out

Decide whose hours are not recorded here. Office staff may be left out. Contractor crews are left out too, because their hours arrive on their field tickets and orders. Say so, to stop double counting.

How crews and rotations come across

Your crew list and rotations come across from a spreadsheet, one person to a row. The foremen check each line against the real roster before use. Mistakes are fixed on the sheet. Each line is then entered once.

The first cost view

Start with lease operating cost per well by job type. Labour shows as part of it. Once managers trust that view, add the hours by crew for the period, so any odd figure can be traced to a person.

How hours connect to jobs, wells and partners

A timesheet is only the start of a labour cost. Its value depends on the wells and jobs it names and on who reads the result next. Five links turn a line of hours into a charge a partner can read. Each link is a hand-off.

  • Wells come from the asset tree the crews work in
  • Jobs come from service jobs raised by foremen
  • Field tickets record crew hours for work done on site
  • Labour cost joins lease operating cost for each well
  • Partner statements read labour charged to the wells

Where crew timesheets and rotations stop

Timesheets record hours and cost them. They do not run payroll, set pay rates or apply overtime and leave rules, which stay with your accountants and your employment advisers. They do not read clocks, badges or tracking devices at the pad. A team of three on one lease may find a paper roster and a notebook enough.

FAQ

Frequently asked questions

Does it calculate wages and overtime?

No, it does not. It records hours and costs them to wells and jobs. Pay rates, overtime and leave rules stay in your payroll process and with your accountants. The hours recorded here can inform that work when your accountants ask for them.

How are rotations recorded for each person?

A shift and a rotation are entered for each person at set-up from your roster. Planners read them before assigning work. A change in rotation is edited on the person’s record by whoever your rule allows.

Do contractor crews enter timesheets too?

No, they do not. Contractor hours arrive on their signed field tickets and are matched to orders. Timesheets are for your own pumpers, roustabouts and service crews. That avoids counting the same hours twice, which would raise labour cost wrongly.

Which well carries a pumper’s labour cost?

The wells named on the pumper’s entries. A round that visited four wells shows hours against those four. Labour for a job is charged to the well and the job named on it, in the same way as other costs.

Who corrects a wrong entry of hours?

Whoever your rule names, agreed before hours go live. On the day, a foreman may correct. After a period closes, a manager may. Corrections should carry a note saying what changed and why it changed.

Where it fits

How this feature fits the system.

Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Wells, pads and facilities

Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.

Fixed Asset Register

Field tickets and service jobs

A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.

Work Order Management

Equipment and preventive maintenance

Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements