Skip to main content
GullySystem

Well, pad and facility records for oil operators

Each well, pad, tank battery and compressor station is held as one record with its status, equipment list, location label and ownership interests. Pumpers, planners and joint interest accountants all start from it. Every job and reading hangs from it. A cost or a volume always belongs to a named asset.

What each well, pad and facility record holds

A well record is more than a name. It carries the details that a pumper, a planner and an accountant each look up, from the current status to the partners who share its costs. Each asset keeps all of them together.

Status and location label

Each well, pad, tank battery and compressor station has a status and a location label written in the naming your engineers already use. A named person changes the status. The office and the pad then read the same word for the same well.

Equipment list per asset

Pumpjacks, separators, heater treaters, compressors and tanks are listed under the asset they stand on. A planner opening Well 14 sees what is installed there, down to the separator and the heater treater. Each repair then has a named machine.

Ownership interests per well

Working interest shares are entered per well, with each partner named beside their share. Partner statements read these shares later. The figure on the record is the figure used at billing, so check it against your agreements first.

The tree above each well

Fields, leases, pads, wells and facilities sit in one tree. A well belongs to a pad, a pad to a lease, and a tank battery to its field. Volumes and costs roll up the same way.

A working week with the asset register

Some look up one wellhead on a tablet. Others read a whole lease at the head office before a partner meeting. Four moments in a working week show how it gets used.

Pumper before the route

Before leaving the yard, a pumper opens the route and sees each pad and well on it, with its location label and equipment. A pumpjack added last month appears on the sheet. Nothing on the route goes unread.

Planner raising a job

A planner picks the well, then the machine on it, and raises a pump change against that exact pumpjack. The job carries both names forward. The signed ticket later needs no retyping at the office.

Manager reviewing a lease

An operations manager opens one lease and reads the pads and wells under it, each with its status. Shut-in wells stand apart from producing wells. Wells under workover do too, before the planning talk with the field team.

Accountant checking interests

Before a billing run, the joint interest accountant opens a well and reads its working interest shares. A partner whose share looks wrong is raised with the production team before anything is billed. They compare it with the signed agreement.

Who opens the well register and what shows

Each role sees the same assets but looks at different parts of the record. Nobody is shut out of a well. It simply brings forward what each person came to read.

Operations managers read status

Operations managers read status by pad and lease, the equipment installed on each asset and the cost carried by each well. The view answers which wells are producing and which are shut in. It shows open work too.

Pumpers on their own route

Pumpers and field operators see the wells and facilities on their own route, with location labels and the equipment at each wellhead. A pumper who finds an unlisted tank or separator reports it. The planner then adds it to the tree.

Planners reading equipment

Maintenance planners read the equipment list under each asset and use it to raise jobs and set servicing. A machine that moves from one pad to another is updated. Its service history travels with it.

Accountants reading interests

Finance and joint interest accountants read ownership interests per well and the costs charged to it. Partner names and shares are the starting point for every statement they prepare each period. Errors here travel far.

Settling the asset tree before set-up

The tree is built first and is the hardest part to rearrange later. A short meeting between operations, maintenance and joint interest accounting settles four questions. Hold it before any well is entered.

Who may change a record for wells pads and facilities

Decide who may add a well, change a status or edit an ownership interest. Interests deserve the tightest control. A changed share alters every later partner statement, while status changes may sit with the production team.

What is left out for wells pads and facilities

Decide which assets are not entered. A plugged well with no cost to carry, or a pipeline segment owned by a third party, may stay off the tree. Write the choice down so nobody searches for those assets later.

How existing wells come across

Your spreadsheets supply wells, facilities and equipment. The production team compares each list with the field before the first reading is entered. Corrections are made on the spreadsheet, not inside the finished tree, so the source stays clean.

Which view matters first for wells pads and facilities

Pick the first view the office will read, such as wells by status or equipment by pad. That choice decides which fields must be complete on day one. Others can wait until crews visit each site.

How the register feeds the rest of the product

The asset tree sits underneath every other feature. Nothing else in the product can be entered without a well, pad or facility to attach it to. That makes the register the first link in each workflow described on the product page. Five links show how far it reaches.

  • Daily readings are entered against a named well or battery
  • Field tickets and service jobs name the well worked on
  • Equipment servicing schedules attach to machines listed here
  • Partner statements take ownership interests from each well
  • Permits and inspections link to facilities in the tree

Where the register stops

The register describes assets and who owns them. It does not hold the legal title to a lease. It does not replace the signed joint operating agreement, and it does not model what lies underground. Your lawyers and land staff keep those papers. An owner with a single well and no partners can manage with a short spreadsheet.

FAQ

Frequently asked questions

Can one well belong to more than one partner?

Yes, and each partner is named beside their share. Working interest shares are entered per well. Partner statements read them, so they should match the agreements your accountants hold before billing starts. Check them once more at set-up.

Does a tank battery have its own record?

A tank battery or compressor station is a facility with its own status, location label and equipment list. It sits beside the wells in the same tree. Readings and costs can be read for it directly. Facility volumes are read from it.

Can equipment be moved from one pad to another?

Update the machine to its new location. Its servicing history stays attached to the machine itself, not to the pad it left. The planner reading it next sees every earlier repair, wherever that repair was done.

How do we name assets in the tree?

Use the names your engineers already use for fields, leases, pads and wells. GullySystem enters the tree in that naming during set-up. Nobody has to learn new labels. Pumpers and the office keep speaking the same language.

Do plugged or sold wells need to stay in the register?

Operations and accounting decide before set-up. Keep a well if costs, tickets or statements still refer to it. Otherwise leave it off, and note the decision for later readers who might ask why it is missing.

Where it fits

How this feature fits the system.

Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Wells, pads and facilities

Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.

Fixed Asset Register

Field tickets and service jobs

A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.

Work Order Management

Equipment and preventive maintenance

Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements