Skip to main content
GullySystem

Joint interest billing and partner statements

Costs charged to a well are shared among its working interest partners by each partner’s stated share. A joint interest statement is issued for every partner for every period. Each line traces to an approved ticket. Partners who question a charge are shown the work behind it.

What a partner statement is built from

Every statement is the end of a long chain. It is only as sound as the records beneath it. Four ingredients go into every one. Each is entered once and read again and again, period after period, by everyone who touches billing.

Working interest shares per well

Each well carries its partners and their stated shares, entered per well because shares differ from one well to the next. The shares are read at billing. A wrong share here is repeated on every statement that follows.

Costs charged to the well

Approved field tickets, parts and chemicals issued from stores, matched contractor invoices and crew hours are charged to the well they served. Together they form the lease operating expense that partners share. Nothing floats without a well.

Cost-sharing rules for each well

Cost-sharing rules are entered per well too, so the way a cost is divided is written down and not remembered. Rules can differ between wells. The accountants settle them with the partners before the first billing run.

The statement for each partner

One statement is prepared for each partner for each period. It lists the charges behind that partner’s share. The layout is agreed with your accountants first. It also says whether volumes sit beside the costs.

One billing period from first ticket to query

A statement takes a whole period to build, though the preparing happens at the end. Four moments follow. They show where each charge begins, when it is checked and how a partner’s question is answered in practice, from the pad to the accounts desk.

Costs land on the well

A pump change on Well 09 is finished and its ticket is approved. The cost is charged to the well that same day. Charges build up all period. By the close, each well carries a long list of them.

Closing the period for partner billing and statements

The joint interest accountant checks that every ticket for the period is approved and every contractor invoice is matched. Anything still held is visible. Late items are settled before statements are prepared, not after, so no partner receives a figure that moves.

Statements are prepared

The accountant prepares one statement for each partner. The shares entered on each well are applied to the charges against it, well by well. Partners in several wells receive one statement covering all of them.

A partner queries a line

One partner rings about a charge on Well 14. The accountant opens the line and reaches the ticket behind it. Hours, equipment and chemical are on the record. The answer comes from that ticket, not from a search through old files.

Who prepares, checks and answers for statements

Partner billing looks like a finance task. In fact four groups feed it. The statement is only right when each does its part, and each reads a different slice of it.

Joint interest accountants

Joint interest accountants set up shares and rules per well, close each period and prepare the statements. Their working view is the list of statements by partner and period. Queries from partners come to them first.

Managers confirming the work

Operations managers read lease operating cost per well by job type and see which jobs drove a well’s cost. They explain a rise to the accountants before a partner asks. The cost is theirs to defend.

Buyers matching the paper

Buyers match tickets and invoices to orders before anything reaches accounts. A cost with no order is held, so it is seen before it reaches a partner’s statement. Held costs are settled first. That protects every partner’s share.

Pumpers supplying volumes

Pumpers key readings that become daily volumes by well. Where a statement shows volumes beside costs, those figures started at the wellhead with a pumper’s entry on a tablet. A missed reading shows as a gap.

Decisions to settle before the first billing run

Partners read statements closely and remember mistakes. Four points need an answer before billing. Settle them with your accountants and, where needed, your partners, before the first billing run goes out.

Who may change an interest

Decide who may edit an interest. Treat a working interest share or a cost-sharing rule as a controlled change that needs a second person. A shifted share alters every later statement, and partners notice the first one.

Which costs are not shared

Decide which costs stay with the operator and never reach partners. Write the list with your accountants. A cost that looks shareable but is not should be excluded at the start, not removed after a complaint.

How interests come across

Working interest shares come from your spreadsheets, well by well. Each share is compared with the signed agreement by your accountants before the first statement. Fix errors on the sheet. Then enter each share once.

What the first report shows

Start with joint interest statements by partner and period. A reader follows each partner across wells. Each share is seen applied. Add lease operating cost per well by job type when the statements settle down.

How statements depend on the rest of the product

Each statement draws on nearly every other feature. It adds nothing of its own except the sharing and the layout. That makes the quality of upstream records the main thing a statement can show or hide. Five links carry the weight of every statement issued.

  • Shares and rules come from each well record
  • Approved field tickets supply the bulk of charges, line by line
  • Stores issues and matched orders add cost to wells
  • Crew timesheets cost labour to the wells worked
  • Statements leave through the accounting software export

Where partner billing stops

Partner billing shares costs and issues statements. It does not interpret a joint operating agreement, which belongs to your lawyers and partners. Revenue distribution to owners is not part of this feature. Your accountants approve the layout and the treatment of each cost. An owner with one well and one partner can work from a spreadsheet.

FAQ

Frequently asked questions

Which costs reach a partner statement?

Costs charged to the well through approved tickets, stores issues, matched contractor invoices and crew hours. Your accountants decide which of those are shared. The statement lists the charges behind each partner’s share, line by line.

Can partners hold different shares in different wells?

Yes. Shares are entered per well, with the partners named beside each. One partner may hold a large share in one well and a small one in another. Statements apply each well’s own figures separately.

Can a partner see where a charge came from?

Yes, each line traces to a ticket. The ticket shows hours, equipment, chemical used and the signature taken on site. Anyone who disputes a line gets the answer from that record, with nothing reconstructed afterwards.

Who agrees the statement layout?

The accountants agree it with the partners before the first billing run. GullySystem sets the layout up as agreed. Later changes are handled by GullySystem staff when you ask, so a new request from a partner does not mean a rebuild.

Does it calculate revenue for royalty owners?

No, it shares costs only. This feature shares costs among working interest partners and issues their statements. Revenue distribution to owners stays with your accountants and their own methods, outside this product and its statements.

Where it fits

How this feature fits the system.

Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Wells, pads and facilities

Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.

Fixed Asset Register

Field tickets and service jobs

A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.

Work Order Management

Equipment and preventive maintenance

Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.

Asset AMC Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements