Spares and chemical stock for oilfield crews
Seals, valves, chemical drums and tools are counted by yard and by truck, each with a reorder level. Each issue is charged to a job. Before a crew leaves, the truck’s load is on screen. A trip is not wasted on a missing part, and stores staff see shortages first.
What the stores record holds for each item
An item record is short but exact. It says what the part or chemical is, where it sits and when it needs reordering. Each movement of stock leaves a line behind, so a count can always be explained afterwards by anyone reading it.
Stock moving between yard, truck and pad
Parts and drums travel a short loop. They arrive at a yard, ride out on a truck and are used at a pad. Four moments along that loop show where the record gets written and who writes each line in it.
Who counts, issues and orders the stock
Four groups use the stores record, and each cares about a different end of it, from the yard door to the job cost. Nobody keeps a private list on the side.
Decisions to settle before stock is counted
A stores record starts with a physical count, so the decisions are about discipline more than software. Four decisions come first. Settle them with the storekeepers and the foremen before the opening count.
How stock links to orders, jobs and servicing
Stores sits between buying and the field. It receives what orders bring in and gives what jobs and services use up. Because of that position, five links decide whether the record stays trustworthy week after week. Each is a hand-off to another feature. They are listed below.
- Purchase orders deliver parts and drums into the yard
- Planners reserve spares for scheduled equipment servicing
- Chemical on a field ticket is drawn from truck stock
- Issues add part cost to the job and the well
- Truck loads are read before a service crew leaves
Where stock tracking stops
Stores counts items and charges their use. It does not value stock for the accounts, which stays with your accountant. It does not supply scanners or any other hardware. Handling rules for chemical stay with your safety staff. Supplier prices stay with your buyers. A single truck with a handful of spares may need only a clipboard.
Frequently asked questions
Can we see what is on a truck before it leaves?
Yes, it can be seen. Each truck holds its own count, and the crew leader reads it on a tablet. A missing seal or an empty drum shows at the yard, well before the crew reaches the pad.
What happens when an item reaches its reorder level?
It joins the list of items below level that buyers read. The buyer raises a purchase order, and receiving the delivery brings the count back up. Levels are set per item. Your rule says who may change one.
How is the cost of an issued part charged?
The issue names the job. The cost sits on that job and on its well. Your accountants agree which unit price applies during set-up. Costs then appear in lease operating cost per well by job type.
Do we need scanners to count stock?
No hardware comes with the product. Counts and issues are entered by hand on a screen, by the storekeeper or the crew leader. That keeps the set-up simple for small yards with one storekeeper and a couple of trucks.
Can planners reserve parts for a future service?
Yes, ahead of time. A planner reserves spares from stores against a scheduled service. The reserved quantity is held back from other jobs, so the part is there when the crew arrives at the pad.
How this feature fits the system.
Oil and Gas Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Wells, pads and facilities
Each well, tank battery and compressor is listed with its equipment, location label and ownership interest, so costs and readings belong to a named asset.
Fixed Asset RegisterField tickets and service jobs
A treatment or workover is raised as a job with its crew, and the signed ticket records hours, equipment and chemical used.
Work Order ManagementEquipment and preventive maintenance
Servicing for pumps, compressors and separators is scheduled by run hours or date, and each repair is kept on the machine record.
Asset AMC TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements