Measurements and Running Bills for Plumbing Contractors

Work done on site is measured stage by stage and turned into running bills. Retention, deductions and the final bill are tracked against the same job.

Measurement before the bill

Builders pay for plumbing work that has been measured. The supervisor’s measurement sheet is the base for the bill.

Quantities by stage

Metres of line laid, points fitted, fittings fixed and tests done are entered against the job’s stages and the unit they belong to.

Agreed with the builder

A measurement carries a flag for whether the builder’s engineer has signed it. A bill built on a signed sheet is easier to defend.

Previous and current

A running bill shows what was billed before and what is new in this period, so nothing is billed twice.

Extra and reduced work

Approved changes appear as their own lines. They are priced at the agreed rate, not folded into the original quantities.

How running account billing works

In building contracts, a running bill is a payment on account during the work. It follows measurement of what has been done, is subject to the deductions the contract allows, and is settled in the final bill. Public and large private contracts ask for joint measurement with the contractor, with entries made in a measurement book before the bill is passed. Your builder’s paper may use other words. Read the contract before setting the fields, and mirror its terms.

Running bills and the final bill

Each running bill lists the work measured since the last one, at the quoted rates. Deductions that the contract allows can be entered, and retention is held back as the contract states. The final bill adds up the job and shows the retention still to be released. Retention terms differ from one builder to another, so they are set for each client. A client’s dues are visible from the bill.

Retention and its release

Retention is money the builder withholds from each running bill as security for the work, and releases in stages once the job is complete and the defect period ends. The rate and the periods come from the contract and vary widely. Because the money stays with the builder for months, track it separately from ordinary dues and diarise the release date. Forgetting to ask for it is the common slip.

Held

Shown on each bill and totalled for the job.

Release date

Taken from the contract and listed for follow-up.

Defect period

Noted so the firm knows when its responsibility ends.

From bill to money

A bill posted here goes to the invoice and receipt module. Payments received are matched against it. The office can see which running bill is paid, which is part paid and which is waiting for the builder’s approval.

What running bills do not do

The software does not decide what a builder will accept. Rates, deduction rules, retention terms and any tax treatment are agreed in the contract, and the firm’s accountant advises on tax.

Questions to settle for measurement sheets

  • Units and stages the builder uses for each trade
  • Who measures and who signs for the builder
  • Deduction heads in the contract, such as advances or recoveries
  • How extra work is approved before it is measured

A measurement week on a plumbing site

Running bills begin on the site, not in the office. Supervisors measure, the builder’s engineer signs, and accounts prices only what was agreed. Here is how one week of measuring travels through the record. Follow it from Monday to Friday.

Monday walk with the supervisor

Quantities are taken floor by floor. Metres of pipe laid and fittings fixed are typed against the stage on the job. Work not yet inspected stays unmeasured, so the sheet lists only what can be defended in front of the builder.

The builder’s engineer signs

A short sitting settles any disputed length. Corrections go over the draft quantity with a note beside them. Once signed, that version becomes the figure accounts is allowed to bill, and an earlier draft cannot slip into a bill.

Accounts prices the sheet

A clerk opens the signed sheet. Quantities sit beside the quoted rates, and deduction lines allowed by the contract are added by hand.

Month end and the open stages

Stages measured but never billed are earned money nobody has asked for. The owner reads that list first. A stage waiting on the engineer’s signature is kept apart from one waiting on accounts, so chasing reaches the right person.

What the firm settles before measuring starts

Measurement sheets pay off only when a few habits are agreed first. Decisions made on day one save arguments on day forty. Settle these points before the first running bill is raised against a live job. Write each one down.

Who may sign a measurement

Decide whether only the site supervisor signs, or the project manager too. A signature carries weight in any dispute. Limiting it to named people keeps casual edits from reaching a bill and gives the engineer one face to deal with.

Which stages count as measurable

Agree a list of stages for a normal building, such as risers, branch lines and fixture fitting. Each becomes a heading on the sheet. Stages left off the list cannot be billed by accident or by habit.

How old jobs come across

Jobs already running need their earlier bills entered once. Bring across the last signed quantity for each stage and the retention held so far. Skip anything older. It will not change a future bill, and entering it costs days.

Which report the owner reads first

Pick one figure for the weekly look. Measured but unbilled work is a good candidate, since it shows money earned and not asked for.

Make an informed decision

Agree the evidence before signing off this part.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Measurement before the bill

Do purchasing, operating and billing quantities use the same unit?

Check the measurement unit and rounding used in “Measurement before the bill”. Compare the result with a known sample before accepting a converted quantity or calculated charge.

Background reading: ERPNext: units of measure

How running account billing works

Can you explain the balance from its original documents?

Select a partly settled example in “How running account billing works”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.

Background reading: ERPNext: outstanding invoices

FAQ

Frequently asked questions

Can one measurement sheet cover several flats?

Yes. Quantities are held by flat, floor or block, and the running bill can total them or list them separately.

Does it keep a retention balance?

Yes. Retention held on each bill adds up against the job, and the amount still to be released is visible until the client pays it.

Can a measurement be corrected after the bill?

A correction is recorded as a new entry with a note. The earlier figure remains in the history so the change can be explained.

Does it print bills in a builder’s own format?

Often yes. Builders ask for a set layout, and bill formats are matched during set-up. Larger changes are quoted separately.

What is the difference between a running bill and a final bill?

A running bill pays for work measured so far, on account. The final bill closes the job, adjusts earlier payments and shows what retention remains.

What if the builder’s engineer measures differently?

Record both figures and the agreed one. The note explains the change, and the bill uses the agreed quantity.

Where it fits

How this feature fits the system.

Plumbing Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and site visits

Each enquiry is logged with source and address, the site visit is scheduled, and measurements and photographs stay with the client record.

Lead Management

Quotations and rate lists

Quotations are built item by item as a bill of quantities from the firm’s pipe, fitting and labour rates, with every revision and open quote kept.

Estimate/Quotation Management

Service calls and job tickets

A ticket is raised for each complaint, from a leaking tap to a blocked drain, then a plumber is dispatched and the repair billed.

Ticket Management
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements