Skip to main content
GullySystem

Invoices and payer splits for restoration jobs

One loss rarely has one payer. An owner pays an excess, the insurer pays its share and a landlord may owe a part. This feature raises a separate invoice for each from the same job, with deposits, progress bills and tax set for your country. Accounts see every share beside the work that earned it.

Invoice lines, shares and tax on one job

A loss produces one body of work and several bills. Every invoice carries the lines its payer owes, the tax treatment you have set and its own reference. The job holds all of them together. Nothing is retyped from a spreadsheet.

Payers and their shares

Each job names its payers and the share of each, such as the owner’s excess, the insurer’s balance or a landlord’s part. Payer rules set the shares once. Every invoice from that job then applies them.

Invoice lines from the approved scope

Lines come from the approved scope and its extras. Equipment days are added where they apply. Each bill shows what its payer is asked to pay. An extra still awaiting approval is easy to leave off. That matters.

Deposits and progress bills

A deposit is raised at the start. Progress bills follow as phases complete, and the final bill takes what remains. Each is its own invoice with its own date. The sum across them is the contract.

Tax, currency and numbering

Invoices carry your local currency and tax treatment, and read as a tax invoice. Numbers run in sequence. Tax rules for your country are loaded at set-up, and your accountant confirms them before the first live bill.

From emergency work to the last progress bill

Billing starts before the job ends. The first call may need a deposit, drying may be billed on its own, and the rebuild may follow in progress bills. Each stage has a payer and a moment. Accounts need to see them all.

Deposit raised at the first visit

The homeowner owes an excess before work goes further. Accounts raise a deposit invoice against that share. The payment is posted later in receipts. Until then the job shows the deposit as outstanding, with its date.

The insurer’s share after drying

Drying is done. The insurer is billed for its part of the emergency work, as agreed. The invoice carries the equipment days and the visits, with the drying log printed beside it for the adjuster to read.

A managing agent instructs the work

An agent arranged the job. The landlord owns the flat. The invoice goes to the agent, as the payer rules say, with the landlord’s share kept apart. The agent’s reference tops the page, and the landlord’s part sits below.

The final bill closes the loss

After the completion certificate is filed, accounts raise the final bills for whatever remains. Deposits and progress bills are set against them. Each payer’s balance is then clear. Nothing lingers, and nothing is billed twice.

Who raises, who approves, who is billed

Invoicing involves more people than the accounts desk. Project managers confirm what was done, owners watch what awaits approval, and call handlers field the questions that follow. The payer sees only its own bill.

For accounts raising each payer’s invoice

Open the job, choose the payer and raise the invoice for that share, with deposits and progress bills set against it. Then pick the next payer. Rebilling the same lines by accident is far less likely.

For project managers confirming the work

Check that the approved lines, the extras and the completed phases match what was done. Do this before an invoice goes out. A line the payer never approved is caught at this point. It is not left for the dispute.

For owners tracking invoices awaiting approval

See invoices awaiting approval and which of them sit with an insurer. A big bill waiting on one adjuster is a cash risk. Ask the project manager to chase it. Note the date of the reply.

For call handlers answering payer questions

Open the loss and read who pays what. When a householder rings about an excess, the answer is on screen. The handler tells the caller which invoice to expect, and from whom. No call-back is needed.

Billing rules to settle before the first invoice

Splitting a bill goes wrong when shares are left vague. Fix them first. Settle shares, stages and tax wording with your accountant and your project managers. GullySystem sets up the payer rules and adjusts them later on request.

Excess collected from the owner

Decide when the owner’s excess is collected: before work starts, at the end, or in step with progress. The insurer’s invoice follows that choice. Whichever you pick, state it to the owner at the first call.

Insurer invoices and their references

Agree whether the claim reference and the adjuster’s name appear on every invoice. Insurers differ in what they want to see. Bring a sample bill from each insurer you serve to the first workshops. Matching layouts avoids later queries.

Stages billed on their own

Decide whether emergency work, contents handling and rebuild are billed as separate invoices or together. Separate bills reach cash sooner. A single bill is simpler for an owner to follow. Choose per payer if needed.

Tax wording on each invoice

Confirm with your accountant how tax is shown for owners, insurers and agents. The treatment may differ between them. Ask early. Settings are loaded at set-up, and later changes are made by GullySystem on request.

Where an invoice gets its figures and sends them

Invoices are where the whole job arrives at the payer. Approved scope lines, equipment days and completed rebuild phases supply the content. Receipts come back and reduce what is owed. At the end the figures leave for your accountant through the accounting export. Nothing is typed twice.

  • Approved scope lines become invoice lines from scopes, estimates and approvals
  • Rental days arrive from equipment tracking
  • Completed phases from rebuild phases and subcontractors support progress bills
  • Payments posted in receipts and balances reduce each invoice
  • Invoice totals pass to the accounting export for your accountant

What invoicing leaves to your adviser

Invoicing records what each payer was billed and on what basis. It does not file tax returns, advise on tax treatment or decide what an insurer will reimburse. Tax and legal questions belong to the owner and an adviser. Claim outcomes belong to the insurer. A firm raising a few invoices a month can use accounting software alone. Splitting one loss across payers is where this feature earns its place.

FAQ

Frequently asked questions

Can one loss be billed to three payers?

The owner, the insurer and a landlord can each receive their own invoice for their share. Payer rules set those shares. The job keeps all three together. Accounts see each part beside the work behind it.

How is the owner’s excess handled on the invoice?

The excess is a payer share set in the payer rules. It can be billed as a deposit at the start, or as part of the final bill. The insurer’s invoice then covers the remainder.

Can a deposit be raised before work starts?

A deposit invoice can be raised against a payer’s share at any stage, including the first visit. It has its own date and number. Later bills are set against it, so nothing is billed twice.

Will invoices show our local tax treatment?

Every bill carries your currency and tax treatment, set for your country at set-up. Your accountant confirms the wording and the rates before the first live bill. That is the safe order. Later adjustments are made by GullySystem when you ask.

Can payers settle an invoice online?

An online payment gateway is one of the connections available. Which invoices use it, and which payers prefer it, is agreed in the workshops. Payments are then posted against the invoice in receipts. The routine is short.

Where it fits

How this feature fits the system.

Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Loss intake and dispatch

Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.

Lead Management

Crew scheduling and on-call roster

Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.

Technician Scheduling

Moisture and drying logs

Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.

Service Reports and Proof of Visit
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements