Materials and supplies store for restoration firms
A restoration van carries antimicrobial chemicals, rolls of plastic sheeting and sheets of plasterboard, and each one is a cost against a loss. This feature records stock received, issued to jobs and returned, with a reorder level for every item. Stores stop being cupboards nobody counts.
Stock lines, movements and reorder points
Every material the firm buys has a line in the store, with a unit and a count. Receipts add to it. Issues to a job take away. Returns put some back. What remains is whatever those movements leave. It can be read at any moment.
A van load, a delivery and a stocktake
Stock moves all day in a restoration firm. A technician takes sheeting for one loss and returns half a roll from another. Deliveries arrive while the crew is out. Record-keeping has to keep pace without a clerk at every door.
Why each role cares about stock
Stock matters to people for different reasons. A technician wants the shelf to hold what the van needs. An owner wants cost on the right job and cash not tied up in surplus. Both read one list.
Store rules to settle before stock is counted
Everyone must book movements the same way. Settle the rules with the person who holds the keys and with your project managers. GullySystem loads the lines and adjusts them later when asked.
How stock feeds rebuild, scope and margin
Stock is a quiet feature that every other one leans on. It stays out of sight. Each issue lands on a loss, so cost reaches the margin by job. Rebuild phases draw from it, and scopes name what it holds. Nothing here is a separate stock book kept on the side.
- Issues to a loss feed margin by job
- Scope lines in scopes, estimates and approvals name the materials
- Rebuild phases and subcontractors draw plasterboard and fittings from the store
- Technician visits record chemical issues under the same loss
- Reorder levels are raised before storm weeks on the roster
Where the store’s count ends
It counts what moves in and out. It does not value stock for the accounts, run purchasing with suppliers or check chemical safety sheets. Valuation and tax treatment stay with the owner and an accountant. Safe handling follows your own procedures and the maker’s instructions. A van with one shelf can be checked by eye. Records matter once several vans and jobs draw on it.
Frequently asked questions
Can chemicals be counted by the litre?
Each item line has its own unit. Antimicrobial can be counted in litres or drums, and sheeting in rolls. Units are set when the store is loaded, and the balance follows whichever unit you choose.
What is recorded when a delivery is short?
The quantity booked in is what actually arrived, so stock rises by that figure alone. A note records the shortfall. The project manager sees true stock before the rebuild trades are booked. No surprises on the day.
Can leftover material go back into the store?
Unused material is booked back as a return against the job it left. Stock goes up. The job’s cost comes down by the same amount. A part-used drum follows the rule you settle at set-up.
How does the owner see what to reorder?
Items below their reorder level appear as a short list. Each shows its balance and its level. The owner, or whoever buys the stock, works down that list before a busy week begins, and orders what is thin.
Does stock cost reach the margin on each job?
Material issued to a loss counts in margin by job after labour, material and equipment. Returns lower it. Prices come from your own rates, loaded at set-up, and the owner can read the result per job.
How this feature fits the system.
Restoration Contractor Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Loss intake and dispatch
Every call or message opens a loss with its address, payer and claim reference, so none is logged late or sent to two crews.
Lead ManagementCrew scheduling and on-call roster
Technicians and subcontract crews are planned by day, and the after-hours roster shows who can attend a burst-pipe call tonight.
Technician SchedulingMoisture and drying logs
Each visit leaves a record of moisture readings, humidity and equipment by room, which becomes the drying log an insurer may request.
Service Reports and Proof of VisitTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements